• LLDPE Geomembrane System 1
  • LLDPE Geomembrane System 2
  • LLDPE Geomembrane System 3
LLDPE Geomembrane

LLDPE Geomembrane

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

HDPE Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer.

 Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LD PE geomembrane, , HDPE geomembrane, EVA geomembrance and all kinds of composite geomembrane.
  1. Complete variety of specifications of width and thickness. Thickness: 0.08-2mm/Width: 2-16m .

  2. Excellent environmental stress resistant cracking performance.

  3. Excellent performance of chemical erosion resistance.

  4. Big scope of application temperature and long service life .

  5. Applied in landfill waste site, sewage and filth treatment site, tailings depot and underground construction project


Items

Index

LDPE

HDPE -1

HDPE -2

Tensile strength MPa

≥14

≥17

≥25

Elongation at break%

≥400

≥450

≥550

Right angle tearing strengthN/mm

≥50

≥80

≥110

Carbon soot quantity

≥2

Environmental stress resistant cracking performance



≥1500

Oxidation induction time at 200min



≥20

Permeability coefficient of vapor(g·cm/cm2·s·pa)

≤1.0x

Impact degradation performance at -70

Pass

dimension stability%

±3


Q:Why do the basics of the cushion waterproofing
As for the bottom of the bar thickness of the protective layer is generally 4cm, but if the basic floor of the concrete label is relatively high, the protective layer can be appropriately reduced.
Q:What is the waterproof layer and the waterproof cushion in the tile roof?
Waterproof layer: set in the tile or metal sheet below, from the waterproof, moisture-proof structure of the layer. The waterproof cushion plays an important role in the tile surface, because the "tile" itself can not be counted as a waterproof material, only tile and waterproof cushion combination to form a waterproof fortification.
Q:Is the raft cushion waterproofing full of the cushion?
Assuming (just suppose) the raft can easily turn over, then we do waterproof (like roof) directly on it, not waterproof on the cushion.
Q:What is the relationship between the cushion and the ring beam?
Ring beam is reinforced concrete. Is to increase the overall wall and overall stiffness, improve the side resistance performance, according to the earthquake or masonry specifications set. There may be in the ground wall, there may be in the underground wall.
Q:The top floor made waterproof playing cushion layer of how to do
4. The second layer to do mortar waterproof (mortar waterproof), waterproof at the same time can protect the bottom of the flexible waterproof.
Q:Do you need a cushion on the ground floor?
As well as the time to build a wooden building with concrete pier, from the ground or contact the ground to do a good job preserving.
Q:How to build a fine stone concrete cushion?
The cushion is primarily responsible for the load coming from the surface and passes the load evenly to the structural or base.
Q:Cushion, waterproof layer construction to do what information
2, bedding (bed course) refers to the structure below the grass-roots level. Its main role is to water, drainage, antifreeze to improve the grass-roots and soil-based working conditions, the water stability requirements are better. The cushion layer is a structural layer between the base layer and the soil base. When the soil quality is poor, it is used to improve the water stability of the soil base, improve the water stability and frost resistance of the pavement structure and disperse Load to reduce soil deformation.
Q:The cushion is usually in the housing which parts
There was no other place in the house below
Q:Maintenance time of the cushion on the roof of the building
According to the "concrete structure construction quality acceptance criteria" provides: Concrete should be poured within 12h after the completion of the concrete to be covered, and moisturizing conservation;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords