• XE1250 MIning Excavator hydraulic excavator CUMMINS engine 567kw/1800rpm 11.5T System 1
  • XE1250 MIning Excavator hydraulic excavator CUMMINS engine 567kw/1800rpm 11.5T System 2
  • XE1250 MIning Excavator hydraulic excavator CUMMINS engine 567kw/1800rpm 11.5T System 3
  • XE1250 MIning Excavator hydraulic excavator CUMMINS engine 567kw/1800rpm 11.5T System 4
XE1250 MIning Excavator hydraulic excavator CUMMINS engine 567kw/1800rpm 11.5T

XE1250 MIning Excavator hydraulic excavator CUMMINS engine 567kw/1800rpm 11.5T

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 watt
Supply Capability:
10 watt/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

XE1250 hydraulic excavator is an hydraulic excavator product of the ultra-large tonnage in domestic at present, which is developed by XCMG independently based on its years of R&D experiences with several proprietary intellectual property rights. The excavator is applicable to various mine construction conditions, and the R&D of the ultra-large type hydraulic excavator has technicalization, intelligentization and humanization as a whole.

 

Cproduct design has the following main technical characteristics:

1. Adopt the Cummins QSK50 full electronic-controlled engine and the double turbocharging technology, having full power and high fuel economy;

2. Variou creative   advance hydrauli technologies,   highe work efficiency, and more comfortable operation safety;

3. Unique electric control technology ensuring excellent efficiency, stability and energy conservation;

4. Higher reliability and durability;

5. The capacious and comfortable cab and the convenient maintenance and inspection channel can fully show the concept of humanized design;

6. The convenient maintenance can escort high-efficient operation...

型号 Model

XE1250

重量 Weight

115000kg

接地比压 Ground pressure

143kpa

司机室噪音

Noise in driver's cab

(ISO 6395)

78dB(A)

驾驶室减振Cab damping

4个硅油橡胶减震器

Four silicone rubber shock absorbers

二、发动机系统 Engine system

型号 Model

QSK23-C760

型式 Type

水冷、四冲程、六缸直列、直喷、涡轮增压

Water cooling、Four strokes、Six cylinders、Direct injection、Turbo-charging

额定功率/转速

Rated power/Speed

567kw/1800rpm

最大扭矩/转速

Torque/Speed

3468Nm/1350rpm

排放标准

Emission standard

U.S.EPA Tier 2

排量 Displacement

23.15L

燃油箱容量

Fuel tank capacity

1460L

三、液压系统Hydraulic system

主泵数量No.of main pump

3

主泵额定流量

Rated flow of main pump

3×531L

工作装置压力Working pressure

34.3MPa

回转系统压力

Pressure of swing syetem

28 MPa

行走系统压力

Pressure of travel system

34.3 MPa

先导系统压力

Pressure of pilot system

3.9 MPa

液压油箱容积

Hydraulic tank capacity

640L

 

 

Q:My general contractor told me that there was not a storm sewer lateral when we built, and I found out that there is (after contacting the local municipality. The excavator/plumber is willing to connect the downspouts and sump pump on one side of my house, but said that he would not do the other side (on the other side of the driveway). My feeling is that we definitely would have done it without a problem, but that he doesn't want to break through the driveway a year later. Am I asking too much to require that he hooks up to downspouts on both sides of the house?
Take a look at the ground level around your house, if you feel there is sufficient grade to allow ground water to run away from your home on the far side of the driveway then just do the one side but if you seem to be at a low point in the subdivision/property then your best bet is to control the ground water by all means necessary. Do some research on backwater valves! I would consider it essential if your in a flood prone area.
Q:I grab more than 7 months, I was driving in the opposite direction, loading it, find leveling is not good, but I don't want to go back to home but is the direction I do open in the opposite direction to open the positive direction of multi time can meet the urgent urgent urgent in the home. Now.
Two modes of operationThe first kind is the Japanese second-hand import machine and senior veteran driver as the representative, the left hand handle of the front, back, left and right corresponding control is the excavator's right rotation, left rotation, bucket extension and bucket recovery. We used to be referred to as "front and back spin"".The second type is the domestic new machine and the new generation of young drivers as representatives, left hand handle of the front, back, left, right, respectively, corresponding to the control of the excavator's bucket stick, bucket recovery, left rotation and right rotation. The habit is referred to as "left and right spin"".There are people who have called these two modes, "mobile phone" and "mobile phone", but due to the lack of a unified nomenclature, caused the differences on the way, before and after rotation is called mobile phone, the mobile phone is called reverse rotation, but also to rotate around the mobile phone is called, before and after the rotation is called reverse mobile phone. So to avoid confusion, said only this, before and after the rotation and rotation, to note here is "mobile phone" is refers to the rotation, and rotation or rotation before and after the "anti mobile phone", two kinds of the different mode of operation is only the left hand excavator operating handle, right invariant handle mode.
Q:He also asked quot;Is that an excavator?quot; at 3 when we were driving through a construction zone and we've noticed that his verbal ability is more advanced compared to other children and asks a lot of questions? Is he quot;giftedquot; (look up intellectual giftedness to get a better understanding if you're not sure) and should we consider getting him tested? There are other things, but I just wanted to make this concise.
yes and you should get him tested
Q:Komatsu PC series excavators -5, -6, -7, -8. Which year did they begin production?
This is the case at homeProduction began in November, -5:1995-6:1997 began in January-7:2002 began in September-8:2007 began in SeptemberabroadMay, -5:88November, -6:1992April, -7:2001September, -8:05
Q:Hi,Previous owner build a brick fence. About 2 feet high, 25 feet long, with about 1 foot deep concrete foundation. This was obviously not deep enough since I live in a cold region and now the fence looks realy bad, going from 2 feet high to 1.5 foot high in the middle!What do you think is the best way to remove all that ? (sledge hammer, rent a concrete saw or a jack hammer) ? I'll also have to get rid of all the bricks and concrete so i was wondering if I might as well have someone do it for me with some kind of excavator.Thanks!
It all depends on how much you want to spend. You CAN do it with a sledgehammer but it will take a lot of work. You could bring in an Excavator and remove it quickly with much less physical labor. Especially if you hire the excavator and operator. No labor at all other than writing a check.
Q:Hi does anyone knows how is a wheeled excavator steered? Is it a mechanical steering like other wheel loaders. Seems impossible because the excavator cab can do 180 about the undercarriage. I thought it must be hydraulically operated or skid steered, but my CAD teacher asked it to mechanically couple the wheels with the steering wheel. Haven't been able to figure out as to how to do it yet. Any suggestions?
Often times they articulate in the middle. In other words the vehicle is actually 2 half's. Each half joined in the middle,hydraulics actuating the articulation, thereby steering the vehicle.
Q:I have made a ally deck that is made to be a mill, but can function as an aggro when needed. Decklist:Halimar excavator x4Jwari shapeshifter x4Hada freeblade x4. ?Kazandu blademaster x3Ondu cleric x3Join the ranks x4. ?Unsummon x4See beyond x4Ponder x4Preordain x2.?Tome scour x410 plains10 islandsI want to get rid of the preordains and ondu cleric's becase they are not helping. This deck's weakness so far is decks killing or countering my allies, mainly the halimar excavator's and jwari shapeshifter's. Some of the cards I want to add are:Jace belerenhindering light wall of omensoblivion ringnegatethe final thing is I want to add ghostway, to mill everything all over again.Advice on how to make this a competive deck?
Diabolist remains notably respectable because of the fact he does injury and works notably plenty alongside with issues like Genesis Wave. i'd actual think of approximately including some Genesis Waves as you're in lots of circumstances waiting to offload an superb form of mana into them and hit a team of allies, and if one in all them is a Diabolist, you deal an superb form of harm by surprise. additionally, that's beneficial to objective Exsanguinate as you could unload an superb form of mana into that besides. i'd take out between the Loremasters and the connect the Ranks. in simple terms my suggestions from the way i've got performed around with my best pal deck on line :) optimistically that facilitates.
Q:I have volvo 360,volvo 290 brand new excavators, i want put in rentel basis in india per hourely or monthely pl suggest where can i serch in web privet secter or govt I serch all the web rentel directory,hire,placement from one month but did't find pl help me and email urgently
The Border Security Force is making the use of excavators and bulldozers of the required specification for digging and levelling the broken ground for the erection of border fencing and construction of protective bundh along the international border in Jammu and Kashmir, Minister of State for Home Affairs Vidyasagar Rao told the Rajya Sabha in a written reply today. The minister said excavators and bulldozers were being bullet-proofed in order to shield workers from the unprovoked and continuous Pakistani fire aimed at disrupting the work. Thirty km of fencing has been completed so far, out of a total length of 180 km of the international border in the Jammu sector, he said. :> peace
Q:When you ask philosophy Questions, do you see yourself as an excavator looking for gems of truth in the facts?
bearing fruit for others to eat is a joy to me. especially when its jesus fruit. he is the vine of life and who ever doesn't beleive will be cut out and thrown on the fire. guess God like to be entertained as well as loved
Q:What are the loading skills of excavators? Just a few words!
5, loading mode, in fact, this and personal habits, some people first installed, in front of someone installed the first, but the younger brother still think the first to install the back faster, because your bucket is backhoe, and later poured material. I feel I'm going to say something against it. I'm sure you'll say, first put the signature in the back, can you see it? I said, ah, your parking platform is right. Are you afraid you can't see it in front?6, said the driver was the problem, now there are a lot of problems of the excavator, the driver did not know each excavator arm, rotating a priority valve, when we leave the car crash if the distance you need to rotate to take action, this rotation priority valve the main oil pump main rotation, if you leave the car near... I do not say it...7, choose a wider shovel bucket wider bucket. It will speed up your loading and unloading

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords