• SINOTRUK - THE HIDOW HYDRAULIC EXCAVATOR HW210-8 System 1
SINOTRUK - THE HIDOW HYDRAULIC EXCAVATOR HW210-8

SINOTRUK - THE HIDOW HYDRAULIC EXCAVATOR HW210-8

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1-Excellent quality with competitive price.

 

2-World famous brand hydraulic system and other key parts.

 

3-Hydraulic Excavator is good excavator,have good preformance.

 

4-perfect after-sale service system.




 

                Main  Technical  Paramenters
Main ParametersModelHW210-8
(KG) Operating weight20800
(CBM) Bucket capacity0.9
(kN) Bucket digging force134.5
Performance of the Macine(rpm)   Swing speed
(%)Gradeability70%
(Kpa)Ground pressure50
EngieEngine   ModelCUMMINS-6BTA5.9-C
(Kw/rpm) Rated Power112KW/1950RPM
Emission standardⅡphase
Hydraulic SystemMotorKAWASAKI
(L/min) Flow rate of Motor2*215L/MIN
MAIN VALVEKAWASAKI
travel motorNABTESCO
rotary motorKAWASAKI
Overall Dimensions(mm)Length9460
(mm)Width2800
(mm)Height3250
(mm) Counter weight ground clearance1090
(mm)Ground contact length of track3270
(mm)Track length4080
(mm)Shoe width600
(mm)Track gauge2200
(mm)Min.Swing Radius3660
(mm) Swing radius2758
Working Range(mm)   Max. digging radius9945
(mm) Max. digging depth6575
(mm) Max. digging height9490
(mm) Max. dumping height6745
(mm) Max. vertical digging depth5940
(mm) Max. depth cut for 2.5m level bottom6400
CabAir-conditioning   brandDENSO
seat brandGrammer 


Q:I have a big dirt pile just sitting behind my fence on my property. We plan on knocking the fence down and re-building it so the dirt pile needs to go as its in our way. The dirt pile came from a ditch that was built next to my house months ago and the workers just left the dirt that was dug up on my property. I have been calling and calling the company to come clean up their mess and they never return my phone calls so now I have to get rid of it myself but how? My husband tried shoveling it and spreading it out but that is way to much work as the pile is big and rock hard from sitting for so long. I have also called equipment rental places to rent a bulldozer or excavator and push it all out but they are way to expensive (we are on a budget). What's a cost friendly way to get rid of unwanted dirt piles?
Go to one of the big box hardware stores that usually has guys waiting around to do day work and hire several of them to shovel that pile out smooth. If you really want the dirt gone hire a small dumpster and have the guys shovel the dirt into that and have it picked up.
Q:How long approx will it take a new operator (I am going to get the feel for it first, just saying no prior expeirence) to dig this hole? (8ft deep)I am aware I have to shore it. I plan on building 2 plywood/2x4 walls across the long side of the hole and connect them across at the corners, then buildthe other 2 shorter walls and attach. Will this work good any sugestions?
If you are a first time operator, you CAN'T make a hole that size, regardless of how you attempt to shore it. Keep your cell phone handy so you can call for help from UNDER the excavator inside the hole.
Q:If you could give me an equation that would be great, trying effectively to calculate the size of a counterbalance needed to keep a weight on the end of a lever level. thanks!
A 15 ft massless lever? What's that? A hologram? Program your hologram projector to project the weight at a certain place in the room.
Q:A portion of an ancient skeleton has been uncovered in Asia. Since the skull is missing, the discoverers can not determine whether the skeleton is from a human or some type of ape. The only portions that the excavators have been able to find are the pelvis and one complete leg. What should they look for?
I am very curious about the answer to this
Q:What kind of documents do you need for driving an excavator?
It is issued by the Chinese machinery department. It is common in the whole country and has the skills to be reported in our school
Q:What does the excavator model mean at 1:35?
It's 35 of the actual excavator size, 1.
Q:i want to dig a pond on my property (8 acres in vt)and want a website or a book with a how to..This will be a pretty big one - think 1/2 of an ice rink size?100 feet by 50 feet?don't know if i need to line it or not?backhoe? excavator?i want to do it myself by renting a backhoe type thing...any tips would be greatly apprectiated!
Number one, get ahold of the DNR and see if they object. If they do argue with whoever you must to change their mind. NUMBER 2 big letters: they call them backhoe operators because they are trained to operate a backhoe. Don't try this yourself unless you want your kids skating over your corpse. I have seen pros flip, I have seen farmers roll tractors and I have seen people roll lawnmowers. This will be quite expensive even if you rent and maybe you can barter(not legal) with the operator to allow access to the pond. Do a contract either way.
Q:Excavator card good test?
Mine is for you, 11OO yuan. It's a little expensive.
Q:This is the link of a cake that i found. I am wondering if anyone has any other ideas of a cake. i like this type of cake, you know where its not in a quot;regualr cake shapequot; I am seeking any and all of your ideas.. Thanks for all that helps Not sure if the link will show on here.. Search for quot;Edible Excavatorquot; thanks a bunches all
when okorder /
Q:About to do some excavation in Utah will be digging a 16x56 hole with excavator 8 feet deep that has to be on grade im only use to ground in Virginia.. so is the ground near Salt Lake City Utah hard? or is it sandy? i've heard both
Utah is known for being geographically diversified. snowcapped mountains to well-watered river valleys to rugged, stony deserts.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords