Wheel loader with bucket capacity of 4.5 m3 model number LW900K

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
15 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product description

Heavy load for the rocky condition; the working device and front and rear frame feature thick board of high strength, reasonable distribution and strong carrying capacity.

The large rock bucket with capacity of 3.0m³ is improved in terms of the work efficiency and adaptation. The bucket teeth adopt the structure of toothholder and sleeve. The cutting blade and bucket edge are equipped with protection device, featuring excellent abrasion resistance and shock resistance.
The thickness of the front frame lug and baseboard is 70mm, and the thickness of the up and down articulated board is 30mm. The machine is superior among the products of same kind in terms of the structural strength and carrying capacity.
Large distance between up and down articulated boards, and large maintenance space. Resolve the load horizontally and vertically efficiently. Easier to access, the machine has more carrying capacity and larger opening space.

Each part passes the scientific analysis with professional stress analysis software to ensure that the reliability and carrying capacity of the structural parts could reach the design standard and meet the requirement of the tough condition.

Product features

  • Rated load: 8.0T


  • Bucket capacity: 4.5m³


  • Operating weight : 28500kg


  • Max.traction:245KN


  • Boom lifting time:6.9s


  • Total time of three devices:11.8s


Product description

 


Excellent performance
The strong breakout force of 17 ton and strong traction of 17.5 ton ensure that the machine could adapt to various tough condition. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Spyder mr3 paintball loader fasta or egg 3?
Definitely get an Egg 3. It is a proven performer. The Fasta is a top-heavy POS. I've known one too many players that lost their Fasta loaders during a game -- came right out of the (MR3) marker feedneck and hit the ground, cracking the shell and snapping the loader feedneck -- broken paint in the loader and the remainder dumped all over the ground. Not a pretty sight.
Q:I have a Maytag Neptune top loader washing machine. It is locked and will not undo, how do I unlock?
i became such as you till those days, could no longer come to a call between magnificent or front loader. i ended up getting a front loader have not regarded back. this is a splendor! Washes fairly nicely would not use lots water. this is a 7kg, lots great adequate yet i might have favourite a speedier spin velocity than 800rpm I do advise getting a device that measures the quantity of water required for the load. i visit in no way circulate back to a magnificent loader. each and all of the terrific!!!
Q:where can i download a free pogo auto loader?
www.okorder.com This is a good auto loader and its free.
Q:configurable usb loader?
very confusing matter. look using search engines like google. this will help!
Q:for people who have had both a top loader and front loader,which do you prefer and why ?
Front Loader because I have a large family and it makes laundry day easier, less soap, and less fab. softener. Dryer doesn't work that well, but I think it's how I separate my loads...Still learning its new...lol I own a GE front loader/dryer set I have had 2 other top loaders, but I don't remember the brands.Hot Point and Whirlpool.
Q:Why are the colors of the loader yellow?
All engineering machinery are yellow, a color is safe, eye-catching, is a car of this type are not allowed on the road, there is a car in the China, unified for the yellow, so our country has extended down.
Q:PS3 Loader fact or fiction???
No, for the sixth time it was a fake. There is no ISO loader for the PS3.
Q:Going to give control to INT 19H Boot Loader - PC Analyzer - What does it mean?
Int 19h
Q:What about the loader's operation permit now?
1 by the Ministry of housing industry education organizations or local housing department training center, such as China Education Association building construction machinery occupation education Specialized Committee, through professional training and obtain training certificate issued operation certificate, to enter the construction site;
Q:Liugong ZL50CN loader, how much do you buy?
We have more than 320 thousand points to buy a dozen of the basic stage to spend 2 million bucks.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range