• Tower Crane TC7034 Construction Equipmen Sale Building Machinery System 1
  • Tower Crane TC7034 Construction Equipmen Sale Building Machinery System 2
  • Tower Crane TC7034 Construction Equipmen Sale Building Machinery System 3
  • Tower Crane TC7034 Construction Equipmen Sale Building Machinery System 4
  • Tower Crane TC7034 Construction Equipmen Sale Building Machinery System 5
  • Tower Crane TC7034 Construction Equipmen Sale Building Machinery System 6
Tower Crane TC7034 Construction Equipmen Sale Building Machinery

Tower Crane TC7034 Construction Equipmen Sale Building Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7034 Description:

1.CMAX Tower Crane TC7034  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7034  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7034  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7034 Parameter:

 Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 3.4


Tower Crane TC7034  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7034 Diagram:

Tower Crane TC7034 Construction Equipmen Sale Building Machinery

Tower Crane TC7034 Construction Equipmen Sale Building Machinery

Tower Crane TC7034 Technical Sheet:

Tower Crane TC7034 Construction Equipmen Sale Building Machinery

Tower Crane TC7034 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:Are there any standard requirements? If so, please show me some reference materials. Thank you, 20It's urgent, online, etc.. Thank youWould you please not write down the specifications? The specific methods of operation, with what materials are written on, thank you, good, you can add points
let the main cable and metal member completely separated, safety code for tower crane and tower crane installation, use and dismantling specification is not clear and specific practices, according to my experience, in accordance with the methods mentioned before can do check, usually meet the requirements.
Q:I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
Q:I need to do a report on how cranes topple, moment (physics) and there correlation (relasionship).I am an idiot and have forgotten what moment is. so please explian that, how cranes topple and why they dont topple, and the correltion between the two!thank you
First of all, let's think of a crane like a giant see-saw, where the plank itself doesn't have any weight. Now cranes have big weights on one side of the pivot, which they can move along (I think, I may be wrong). These cause what is called a 'turning moment'. The further out from the 'pivot' they are, the greater the moment. The other consideration with a crane is it's load. Generally, this is carried a lot further out from the pivot point, on the opposite side from the weights. Now consider this. If you have a small child sitting on the end of a see-saw, you will be able to balance them with a larger person sat closer to the pivot. This is the principle on which cranes work. The moment is the force times the distance from the pivot, and it must be balanced turning each way for the see-saw/crane not to topple. This is somewhat of a simplification, but hope it helps.
Q:i saw a huge one look liked it had a stinger to those hurt u?
Crane flies look like mosquitoes from Hell, but they are absolutely harmless. They do not have stingers, they can not attack a human. Relax!
Q:I've heard of people making 1000 origami cranes as a wedding gift or decoration. I am making them as a gift for my sister-in-law and her husband, whose new baby is due next month. I'm up to 730, so I need to keep plugging away! My question is how should I display them? I've heard of putting them in a gallon jar. I was also thinking of making strings of 100. Do you put the string through the pointy part on the back? Can I arrange them into a mobile? Any ideas would be appreciated.
it relatively is like asking: once you're making a wish on a taking pictures megastar, will it come real? even although the two are extreme-high quality gestures, no it won't come real. Origami cranes are purely products of paper that are folded to resemble birds; no rely what number you're making, they won't address supernatural expertise inclusive of wish-granting.
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:how long do i have to work as a yardhand in oilfeild to become a crane operator?
You need to get licensed or certified to operate the crane. make sure you are qualified before you start complaining about not getting more challenging work. The world needs ditch diggers to so get back to work.
Q:Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
Its simple man, The company produces the concrete blocks called as hollow blocks also, they are lifted up using man power or lifts or cranes, dont know what was difficult to you in understanding that.
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
Q:the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords