The World's Best Rebar From Chines Mill SAE1008

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
7655 unit
Supply Capability:
4545 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of  Wire Rod Steel for Construction Description

the wire rod steel for construction that we offer have been used in civil construction work for years.

2.Main Features of the Wire Rod Steel for Construction

fasteners, bolts, rivets, screws,

general purpose wires,

electrode wires, industrial wires, agriculture wires,

bush wires, chain rivet wires,

detonator wire,

Umbrella ribs, upholstery wires, cycle spokes, needle wires, heald wires, staple pin Wire, safety pin wires

ACSR wires, earth wires,

tyre and hose reinforcement wires,

prestressed concrete wire, springs and rope wires,

card clothing wires,

vineyard wires,

ball bearing quality

Automobile parts like screw, fasteners, bush, spline, socket, connecting rod, shaft, gear, rivets, engine shaft, connecting rod, spindles, gears, etc.

3.Wire Rod Steel for Construction Images

The World's Best Rebar From Chines Mill SAE1008

 

 

4.Wire Rod Steel for Construction Specification

Grade

Chemical Composition(%)

C

Mn

Si

S

P

B

SAE1006B

0.03~O.07

≤0.32

≤0.30

≤0.045

≤0.040

>0.0008

Mechanical properties

Yield strength(N/mm2)

Tensile strength(N/mm2)

Elongation(%)

250-280

350-380

≥32

 

Grade

Chemical Composition(%)

C

Mn

Si

S

P

B

SAE1008B

0.10max

0.3~O.50

0.15max

0.050max

0.040 max

0.0008 min

Mechanical properties

Yield strength(N/mm2)

Tensile strength(N/mm2)

Elongation(%)

≥195

315-430

≥30

 

5.FAQ of  Wire Rod Steel for Construction

 

1.What is your minimum order quantity ?  

Our MOQ is 500mt .

2.Please tell me the daily output and wire rod mill’s brand ?

Our daily output is 4000mt/day and our rolling mill from Germany’s SMS MEER

3.Which countries are your main sales?

 Thanks to the professional international trade team, solid distribution channel and long – term cooperation customers, our market share in overseas realizes a tremendous growth, now we already became a main player in Middle East and South East Asia.  Meanwhile, we are also the biggest supplier of Pre-painted galvanized steel coil in Philippines, Saudi Arabia, United Arab Emirates, Iran, Sudan etc.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do you distinguish the type of loader?
Distinguish the type of loader: the loader is now in line with the international standard,XG910 XG920, XG931,,, XG942, XG951Liugong has LG836, LG835, LG842, LG856, LG855Others do not say, Datong little italy,Internationally, the loader is numbered in the form of a digital 9, the middle of the 1,2,3,4,5, which represents a few tons of loaders, that is, we long said 30.40.50., the figure behind it represents the next generation of productsThe first number of Xia Gong is the present international serial number, 931 is the Xia Dynasty loader's 3 ton first generation product, and the 918 is the Xia work loader's 1 ton eighth generation productLiugong's first number was the previous international code, so it used 8, and LG855 was the fifth generation of Liugong loader's 5 tons
Q:30 and 50 loaders, 8 hours a day, and their oil, earthwork, long-term work, long working hours in a car, about how much money, monthly
30, the monthly rent of the transfer machine is 6000 yuan, and the 50 loader is 10000 yuan per month, excluding drivers and oil
Q:A 50 a class loader is how much money?
See how long you do, usually 1 hours is 280, bring your own oil. The boss of the burning oil is 130, a day to 8 hours, it should be 2000 dollars [with oil, my car is like this, you do not know what
Q:50 how much oil does the loader consume per hour?
Different brands, different models, different working conditions, different drivers, not the same oil, oil consumption per hour is not the same, generally in the 15 liters or so.The loader is a widely used in earthwork construction machinery construction, highway, railway, electricity, ports, mines and other construction projects, it is mainly used for shovel of soil, sand, lime, coal and other bulk materials, can also be used as a mild shovel of ore and hard soil digging etc..
Q:Solid tyres for loaders
We have been committed to the manufacture and sale of durable, high cost of tire products.
Q:What is the width of the loader bucket in the loading capacity of about 1.5 tons? Thank you
30 loaders, the bucket is generally 2.4 meters wide.50 loaders, bucket width is generally about 3 meters.You said 1.5 tons, estimated at 1.6-1.8 meters, the weight of the bucket, also have a certain impact on the load, recommend the use of wear-resistant steel lighter production, such as jfe-c400, can increase the service life and working efficiency.
Q:What should I pay attention to when learning the loader?
Four often: that is, in the loader operation, especially loader in the excavation work in case of resistance, do not use the accelerator to control the vehicle condition. Still should be in the case of steady throttle, with the cycle of moving up and turn bucket control lever method to make the loader to maintain normal working conditions, and bucket shovel full of materials. Because of the need for work, lifting and turning the lever of the bucket is what we call "diligence"". This process is very important, and the amount of fuel consumption is critical in the operation of these operations, which should be paid special attention to by operators. Five coordination: coordination is the organic coordination between lifting and bucket control levers. In general, the backhoe process of the loader is that the bucket is flat and the slope is stationary towards the pile. When the bucket is parallel to the hopper, there is resistance, the first should follow the principle of first lifting the arm and then receiving the bucket. This can effectively prevent the formation of the bottom and the ground resistance of the bucket, which can give full play to the maximum breakout force. This kind of parallel operation solves the smoothness of the work site, the comfort of the driver and the unsafe factors in the workplace, and does not often have to clean the work site alone. The utility model reduces the time for leveling the site alone, increases the effective workload, improves the work efficiency and saves oil. In the arm and the rotating bucket lever of organic coordination work, make full use of the loader digging force, lever coordination properly, even the light throttle can also smoothly make the bucket full of material.
Q:Is the loader driver a special type of work?
Loader driver is a special type of work, as follows:I. brief introduction of special types of work:Special work refers to the work of special posts collectively, refers to the prone to casualties, the operation of himself, others and the safety of the surrounding facilities, there is a major hazard to the work. The former State Ministry of labor in underground, high altitude, high temperature, heavy physical labor and the range of toxic and harmful types as special types and clear special types are determined by the industry department or the Department of labor. Special types of work, different from special operations, are two different concepts.Two, detailed examples of special types of work:1. electrical work. Including power generation, power transmission, power transmission, electrical distribution, electrical equipment installation, operation, maintenance (maintenance), test workers, underground electrical fitter;2. metal welding and cutting operation. Welding and cutting operator;3. lifting machinery operation. [including crane driver, cable operator, signal conductor, installation and maintenance worker]4. driving motor vehicles in enterprises. Drivers of all types of motor vehicles including the production areas and construction sites within the enterprise, docks, freight yard, etc.;5. uphill erection work. More than 2 meters above the height of erection, demolition, maintenance, high-rise building (construction) building surface cleaning workers;6. boiler operation (including water quality test). Operator of pressurized boiler, boiler water quality tester;
Q:Where is the loader driver?
China Education Association building construction machinery occupation education Specialized Committee in designated training institutions or your local excavator loader production factory is located in the local customer service training department registration to attend training certificate to the bid committee through the formal learning and examination after.
Q:The two axle assembly is at the loader's location. Who can help me explain? Thank you
The two axle assembly is in the torque converter of the loader, and after the torque converter is opened, it can be seen at the end of the movement.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range