Steel Galvanized Scaffolding Forged Formwork Nut 17mm

Ref Price:
$5.00 / pc
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

1.Steel Galvanized Scaffolding  Forged Formwork Nut 

What is  forged formwork nut  ?

Forged formwork nut  is accessories of the scaffolding productions , it is usually made of C45 steel material , The production technology can be forging or prssed  , With the development of the construction , the forged scaffolding formwork nut has become  more and more popular. 


Function of the forged formwork nut 

Steel Galvanized Scaffolding  Forged Formwork Nut  used to connect screw tie rod for conceret formwork buliding tower , It used in buliding construction   site  .The common size is 17mm   suitable for 17mm screw tie rod . It can bear pressure on horizontal and leverl direction 


Advantage of  forged formwork nut

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main features of Steel Galvanized Scaffolding  Forged Formwork Nut 

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Steel Galvanized Scaffolding  Forged Formwork Nut    images 



Steel Galvanized Scaffolding  Forged Formwork Nut 17mm

Steel Galvanized Scaffolding  Forged Formwork Nut 17mm

Steel Galvanized Scaffolding  Forged Formwork Nut 17mm


4. Steel Galvanized Scaffolding  Forged Formwork Nut  Specification

 Raw Material: C45

 Size: 17mm 

 Weight: 1.75 kg

 Certifies:, Element

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Steel Galvanized Scaffolding  Forged Formwork Nut 

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scarlet Letter Scaffold scenes?
No. Santa doesn't like this movie.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:Introduction of external scaffolding
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.
Q:How much is the amount of material used to build a square meter double row scaffold? Urgent!
(less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
Q:Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:Targus or scaffold piercing?
If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
Q:What is rolling scaffolding?
well rolling scaffoled is just what it says,its rolling scaffold.Some scaffold is set up in a way it is not movable,its ushally attached to a structure ,for safty.a rolling scaffold although its not as stable as attached ,its movable,it can be rolled along the area needed to be worked,often with men staying on it while its rolled.
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:How to maintain the scaffold after use
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range