Galvanzied Casting Steel Ledger End for Ringlock Scaffolding System

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Model Number:
SCRLAS01
Name:
Casting Steel Ledger End for Ringlock System
Catagory:
Ringlock Scaffolding Accessory
Material:
Steel Q235/345
Surface:
Hot Dipped Galvanzied/Self Color
Process:
Casting
Size:
As Clinets Requirement
Weight:
0.5-0.8kgs,
Manufacturer:
OEM is Available
Advantage:
Strengthen, high quality
Application:
connecting the ledger and standard

Packaging & Delivery

Packaging Detail:As the Requirement of Clients
Delivery Detail:15days

Specifications

Casting Steel Ledger End for Ringlock Scaffolding
Material: Steel Q235/Q345
Surface:Galvanzied
Manufacturer, OEM
ISO, EN74


Product Description
Name: Casting Steel Ledger End for Ringlock System

Category: Scaffolding system

Material: Steel (Q235/Q345)

Surface:  Electro Galvanized/Self Color/Painted/HDG

Application: Connecting ledger and standard

Advantage:  Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle

OEM service is available

Items or goods can be manufactured according to your standards

Company Information
1.We are the biggest and most efficient manufacturer and world wide exporter of formwork and scaffolding System and accessories in China.

2.We have more than ten years manufacturing and exporting experience of formwork and scaffolding System and accessories.

3.We have extensive and comprehensive quality control system recognised world wide.

4.Your job will be in good hands as we have all round experienced staff in all our departments.

5.Our prices are very much competitive and open to negotiation.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Want to get lip piercing or scaffolding, advice please?
Everyone is different as far as what piercings they think hurt more or less, but based on my own experience, I'd say the scaffolding hurt more by far. Now, I've never had my lower lip pierced, but I had my upper lip area (I used to have angel bites), so I'd image it would have to be similar to the lower lip as far as pain, care, healing. As far as cleaning them, it's like most other piercings, where the best thing for you to use is warm sea salt water. But although everyone's different, the lip is going to be the faster healing of the two I'd say for basically anyone. The scaffolding takes up to a year to fully heal. The lip heals relatively fast;usually anything involving your mouth area heals quicker than other areas of the body-I'm sure you noticed how your tongue healed fast. Or even if you accidentally bite or cut anything involving your mouth, tongue, inside of your cheeks, etc., it heals faster than other areas. As far as the foods other aftercare with it, it is somewhat similar to your tongue in caring for it-just follow your piercer's instructions you'll be fine. Good luck!
Q:I would like to ask how much scaffolding steel prices
Hello, you ask this question is not answered, you are building it, I am here to help you check a lot of information on the Internet, here to share with you, you can look at the reference price, the price there is no uniform standard, each region is different, the price is for reference only. Practice has proved that the new scaffold not only safe and reliable construction, installation speed, and the amount of steel scaffolding can be reduced to 33%, disassembly efficiency is improved by more than two times, the construction cost can be decreased, the construction site civilization, clean and tidy.
Q:Calculation method of complete scaffold
The most distant light is closer to us than the nearest darkness:Distance is usually just a myth
Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.
Q:How do you calculate the tonnage of scaffolds to use in a project?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Zpd And Scaffolding
Q:What are the common rules for calculating the amount of scaffolding works
According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.
Q:Is there any requirement for the installation of the disc scaffold?
Whether the site is to use their own hand foot disc accessories, accessories or disc scaffolding rental, before use should be carried out preliminary calculation, see how many accessories, the same buildings of different height should be calculated separately, is used to prevent waste of transportation. To achieve cost savings must be accurate calculation. You can go to the mall extension carefully and look at the product deformation, distortion, rust, if any of the above parts, should immediately terminate the use of such products can not be put into construction and.
Q:Want to rent the scaffolding in the county, you need to cast how much money
A portal scaffolding about 200, a steel springboard around 50,
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range