• Cuplock scaffolding system best price for sale System 1
  • Cuplock scaffolding system best price for sale System 2
  • Cuplock scaffolding system best price for sale System 3
  • Cuplock scaffolding system best price for sale System 4
  • Cuplock scaffolding system best price for sale System 5
  • Cuplock scaffolding system best price for sale System 6
Cuplock scaffolding system best price for sale

Cuplock scaffolding system best price for sale

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
1000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Cuplock scaffolding system best price for sale 

 

1)Material: Q345 

2)Surface treatment: hot dip galvanized 

3)Tube size: 48.3mm *3.25mm

4)manufacturer

 

 

Feature of Cuplock Scaffolding:

 

 

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 

Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

Our firm belief that our customer's success are the only guarantee of our success .


 

 

 

Name

 

Cuplock scaffolding system best price for sale 

Place of Origin

Shandong, China

Main Material

Q345

Surface Treatment

Electric Galvanized, Hot Dip Galvanized, Painted.

Certificate

EN74

Service

OEM Service available

MOQ

1000pcs

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

In bulk or steel pallet or as your request

Production capability

15 containers/month

 

 






OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest



Quality Control

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.

All products are manufactured under stringent in - house quality control plansAll products strict quality inspection, all the raw materials are inspected before use, the product must be tested before leaving the factory.


Packing 


In steel pallet



Q:What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
Q:what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
It's not going to hurt 'especially' don't worry. :) xoxox
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:Which accessories are included in a movable scaffold
(1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.(2) scaffold with various specifications of steel pipe. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.(3) steel scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:The basic form of external scaffolding
The bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.The bowl buckle joint is the core component of the scaffold system, which consists of the upper bowl buckle, the lower bowl buckle, the cross bar joint and the limit pin on the upper bowl buckle.
Q:In the U.S.I live in Illinois as well so... yeah :DThank you!
Location Pierced through from the top rim and coming out on the side rim Procedure can be pierced as two separate piercings and then a long barbell fitted when healed , though more successful and comfortable when pierced straight through initially , the barbell then fitting comfortably as guaranteed to line up exactly This can be multiple pierced with barbells sitting parallel to each other, or designed to sit diagonally forming a cross as well as even being placed vertically from Helix to the lobe. These are only possible where the main cartilage shape of the ear does not protrude preventing a straight passage for the jewellery to sit comfortably. Procedure Needle piercing Complications As there are two piercings and each has the potential to swell a barbell at least 4mm larger than the ear is required to allow for swelling
Q:I had my scaffold done on friday, and it's still very sore and swollen. My boyfriend's accidentally caught it a couple of times but not badly and i was wondering if the pain and swelling is normal and if there's anything i can do for it. I've been cleaning it with savlon and have been careful with it x
If it gets worse you should swear loudly at yourself for being so stupid.
Q:So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
have a piercer look at it.
Q:I want to know the classification of scaffolding in the building
Material division according to bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
Hello, you ask this question is not answered, you are building it, I am here to help you check a lot of information on the Internet, here to share with you, you can look at the reference price, the price there is no uniform standard, each region is different, the price is for reference only. Practice has proved that the new scaffold not only safe and reliable construction, installation speed, and the amount of steel scaffolding can be reduced to 33%, disassembly efficiency is improved by more than two times, the construction cost can be decreased, the construction site civilization, clean and tidy.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords