Scaffolding steel tube for construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Thickness: | Place of Origin: | ||||
Secondary Or Not: | Application: | Technique: | |||
Certification: | Surface Treatment: | Special Pipe: | |||
Alloy Or Not: | Name: | Material: | |||
Length: | Coating: | End: | |||
Application1: | Application2: | Grade: | |||
Standard: |
Packaging & Delivery
Packaging Detail: | Bundles or according to client's requirements |
Delivery Detail: | 20 -40 days |
Scaffolding steel tube:
item | property | Scaffolding steel tube | |||||
1 | Technique | UT test for plates- froming-high freqency welding- UT test for welded seams- annealing-UT test for welded pipe | |||||
2 | usage | Used for construction | |||||
3 | standard | BS 1139, BS1387-1985, EN 39, EN10219, JIS G 3444 | |||||
4 | Certification | API 5L PSL1 / PSL2, API 5CT, ISO 9001-2008 | |||||
5 | Grade | Q195, Q215, Q235, Q345, S235JR, S275JR, STK400, STK500 | |||||
6 | Out diameter | 48mm,48.3mm,48.6mm | |||||
7 | Wall Thicness | 2-4mm | |||||
8 | Length | up to 12mm | |||||
9 | End | Beveled end,plain end meet your need | |||||
10 | Surface tratment | Black painting,bare pipe,Oiled,Hot dip galvanized | |||||
11 | MOQ | 20MT | |||||
12 | Delivery condition | BKS, NBK, BK, BKW, GBK(+A), NBK(+N), BK(+C) | |||||
13 | Package | 1. big diameter: in loose | |||||
2. small diameter:packaged in bundles with strips | |||||||
3. as per clients' requirement | |||||||
14 | Payment | TT/LC | |||||
15 | Delivery time | 20days after receive deposite | |||||
16 | Cell phone | 86-15802647516 | |||||
17 | Skype | christina.chenting | |||||
18 | christina(at)xysteelpipe(dot)com |
- Q:What is the service life of the mobile scaffolding accessories?
- The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized. 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share.
- Q:21M high full scaffold erection scheme
- dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
- Q:I plan on playing tennis and doing track and field at school... Im getting the piercing this month and it won't be healed in time to take it out. How can I conceal it or possibly even help it heal faster??
- Well an industrial piercing isn't exactly going to get in your way, just put your hair up in a pony tail so your hair doesn't get snagged on it. I wouldn't suggest trying to cover it with anything though, you'll be putting the piercing at risk of infection from trapping bacteria, especially if you're going to end up sweating.
- Q:Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
- With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
- Q:by scaffolding ?
- I'm guessing it is a reference to large breasts. But I could be wrong.
- Q:Can you do the outer scaffolding?
- (2) the outer side of the scaffold must be provided with scissors, scissors width should not be less than 4 span, and should not be less than 6m, the angle between the diagonal rod and the ground is 45-60 degrees. The intersection points of the oblique bars are on the same straight line and are arranged along the height of the frame. (3) a diagonal rod of the scissors is buckled on the upright post, and the other inclined rod is buckled on the end of the small transverse rod, and the two ends are respectively fixed with a rotating fastener. All fixed pitch master node distance not greater than 15 cm
- Q:i already found the force in rope 2 but im not getting the force in rope 1.
- difficult situation. search in google or bing. that could actually help!
- Q:Introduction of external scaffolding
- Temporary structure frame for feeding, piling and construction work outside the outer wall of the outer wall for building construction. 1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.
- Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
- The span, the rod step is easy to calculate, I have done the program in general 4.4.8 meters
- Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- Hello friends, NG2K said the weight of the standard parts of the standard value of the axial forceNG2K (kN) formula: NG2K = NG2+NG3+NG4 = 3.094 kN; NG2 and NG3, respectively, NG4(2) scaffolding deadweight standard value (kN/m2); the bamboo scaffold board, the standard value of 0.30NG2= 0.300 x 7 x 1.500 x (1.050+0.3) /2 = kN = 2.126;
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding steel tube for construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords