Scaffolding steel tube for construction

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Thickness:
2 - 4 mm


Place of Origin:
Tianjin China (Mainland)
Secondary Or Not:
Non-secondary
Application:
Structure Pipe
Technique:
ERW
Certification:
API
Surface Treatment:
oiled, galvanized ,black painting
Special Pipe:
API Pipe
Alloy Or Not:
Non-alloy
Name:
Scoffolding steel tube
Material:
steel plate
Length:
5.8m ,6m, 6.4m,6.5m , 0.3-18m
Coating:
black paitting,oilded, galvanized, bare.
End:
belved, plain
Application1:
used for liquid dlivery
Application2:
used for constructs tion piping and machinery parts
Grade:
10#,20#,45#,16Mn,A53(A,B),A106(B,C),10#-45#,A53-A369
Standard:
ASTM A106-2006,ASTM A53-2007,ASTM A252-1998,API 5CT,API 5L,ASTM,API

Packaging & Delivery

Packaging Detail:Bundles or according to client's requirements
Delivery Detail:20 -40 days

Scaffolding steel tube:

itempropertyScaffolding steel tube
1TechniqueUT test for plates- froming-high freqency welding- UT test for welded seams- annealing-UT test for welded pipe
2usageUsed for construction
3standard
BS 1139, BS1387-1985, EN 39, EN10219, JIS G 3444            
4CertificationAPI 5L PSL1 / PSL2, API 5CT, ISO 9001-2008
5GradeQ195, Q215, Q235, Q345, S235JR, S275JR, STK400, STK500            
6Out diameter48mm,48.3mm,48.6mm
7Wall Thicness2-4mm
8Lengthup to 12mm
9EndBeveled end,plain end meet your need
10Surface tratmentBlack painting,bare pipe,Oiled,Hot dip galvanized
11MOQ20MT
12Delivery conditionBKS, NBK, BK, BKW, GBK(+A), NBK(+N), BK(+C)
13Package1. big diameter: in loose
2. small diameter:packaged in bundles with strips
3. as per clients' requirement
14PaymentTT/LC
15Delivery time20days after receive deposite
16Cell phone86-15802647516
17Skypechristina.chenting
18Emailchristina(at)xysteelpipe(dot)com


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Specification and type of scaffold erection
Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.
Q:I want to know the classification of scaffolding in the building
Steel pipe scaffold. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.
Q:Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q:Is my scaffold peircing ok? x?
You should be using non ionised sea salt dissolved in warm to hot water twice a day to clean the piercing, not savlon (which is to harsh for piercings and will dry out the skin). If the piercing keeps getting caught then it is going to swell and be painful, the area has been through trauma so will be very sensitive. Although swelling at this early stage is still normal and to be expected.
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:What are the requirements for the construction of the scaffold eye in the building?
SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:A 115 kg scaffold is 7 m long. It is hanging with two wires, one from each end?
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:Scaffolding/Industrial piercing?
I have two lobe piercings on both ears, two cartilage piercings and an industrial that i got five months ago. I was expecting my industrial to be very painful but it wasn't that bad (i have a high pain tolerance though) its a bearable pain. Like all other piercings the healing process is the worst part and still when i bump it (like when im doing my hair) it hurts like a B****! lol. And don't play with it alot when you first get it, it causes scar tissue bumps. Use H20cean spray or you can do 1/4 tsp of sea salt and 1 cup of water to help heal it. The healing time is long, 4 months to a year. I paid $65 dollars in the us idk how much that is UK. It was definitely worth it though! Go for it :)
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
Take them on the road-trip of course....we'll find some use for them along the way.....

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range