PVC pipe for Dredging with High Wear Resistance

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1000 m
Supply Capability:
50000 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Description of PVC Pipe :
Process: vacuum forming extrusion
Color: various colors, we can make color according to Panton card No.
Quality Standard: Smooth surface, no spot, no shrink mark, no surface quality defect.Check from cross section, homogeneous in density, good plasticizing degree, relative chemical/physical property meet customer requirement. We supply different environment protection products to meet different market requirement.
Application:construction, home decoration, stationery&toy, advertising, ornament, etc.
Common Feature: high glossy, water proof, damp proof, termite proof, shock proof, fire retardant, Maintenance free, light weight ,easy to install, economical, durability, recyclable

2.Features of PVC Pipes :

1. Urban or rural water supply pipe network;

2. Sand, salt dredging project;

3. Ore & mud slurry conveying;

4. Industrial raw material transmission pipeline;

5. Landscaping water supply pipe network;

6. Agricultural irrigation pipeline.

7. Other industries related to liquid transportation, especially for corrosive liquid.

3.PVC Pipe Images:

4.Specifications of the PVC Pipe:
1) Material: pvc pipe unplasticized polyvinyl chloride
2) Standard: GB, ISO9001, ISO14001
3) Color: white  pvc pipe, grey  pvc pipe , etc.
4) Specific Gravity:g/cm3, 20(C): 1.35 - 1.55
5) Vicat Softening Temperature: (C)  >=79
6) Longitudinal Reversion: %, 150(C) <=5< span=""><>
7) Dichloromethane Resistance Test: No attack
8) Falling Weight Impact Test: TIR, %, 0(C) <=10< span=""><>
9) Tensile Yield Strength:  Mpa >=40

5.FAQ 
Q:What is the production ability? or delivery time?
A:Our production ability support 40HQ order finish in one week.
Q:What is your payment?
A:TT or CC.
Q:Can we have sample?
A:Sample free, freight cost you.
Q:For urgently doubts,who online?
A:Sales and marketing Manager 24hours online service.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What's the fire suppression ring for the drain pipe? What are the requirements?
1, the application of the vertical pipe through the floor through the site.2 、 cross the partition of the fire zone and the two sides of the firewall.3, cross tube wells pipeline or pipe hole retaining wall through lateral parts.And in section 5.1.17, the fire ring shall be installed in accordance with the requirements of the product. The installation shall be close to the floor or wall of the floor, and shall be fixed with expansion bolts.
Q:Which kind of inner tube is better for river tubing, a rubber truck inner tube or a PVC plastic one?
definitely the rubber ones the plastic ones will scratch your inner arm cause the seem is right in the middle
Q:How can I make plastic pipes harden quickly?
You say this kind of plastic pipe is PVC tube, it will harden in cold weather, and it will harden for a long time. Because of the hardening of the temperature, do not worry, the temperature will rise back, will return to normal, because this is the characteristics of PVC plastic. With a long hardening, this is the aging phenomenon, due to ultraviolet radiation and oxidation caused by irreversible reactions.
Q:My dip stick broke but i can still see it in the tube, it broke off from the plastic peice.?
tweezers, get a straw that is small enough to wrap tightly around it. Wrap gray tape backwards around a coat hanger. Go to a auto store and buy one of those magnetic things. It looks like a car antenna, but it shrinks in size, and the end is magnetic. It is pretty cheap. take two long skinny nails, and put them down there and try to push them together to hold the stick and pull it out. I really don't know but it will be interesting to find out how you got it.
Q:How do you get a plastic tube on your shoelace? What's the name of the machine? Thank you
Shoelace heading machine, according to the operation mode is divided into semi-automatic shoelace heading machine and automatic shoelace leading machine two kinds. The semi-automatic shoelace heading machine uses the artificial feeding, manual control of length and manual control of the machine in Baotou. The utility model has the advantages of flexibility and convenient length adjustment, and is suitable for small batch production or proofing use. The output and quality are directly related to the operator. Automatic shoelace tipping machine, the difference between semi-automatic place lies in his high degree of automation, feeding, length control, quantity statistics and machine Baotou action are carried out automatically, workers only need to take out the finished packaging can be. Important for mass production.
Q:Could a K9 smell marijuana through a plastic test tube?
Probably not but cops can track your location from things you post on the Internet -.- it's an ip address.
Q:vacuum cleaner plastic hose and steel extension tube are stuck.?
On the steel extension tubes you could use a touch of wd40. This may work where the tube connects to the plastic hose as well, but wd40 can have an effect on some plastics, so take care. It maybe better to use a drop of cooking oil.
Q:Bendable piping/tubing??
PVC drain pipe and fittings, like at Home Depot, sounds closest to what you want. Anything flexible is not smooth on the inside, check out dryer hose, for example.
Q:Can mercury be stored in a hard plastic test tube?
If it can b stored in a thermometer, it can be stored in a test tube. You should seal it though
Q:EXACTLY WHERE AT THE MOUTH OF A PLASTIC TUBE DOES THE PRESSURE NODE FORM? (Dealing with standing waves in air)?
Level with the open end. Pressure nodes form where there are displacement antinodes and displacement nodes form where there are pressure antinodes If you look at the diagram, this will be clear.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range