• pvc doors System 1
  • pvc doors System 2
pvc doors

pvc doors

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

    • 1. Packing and Delivery
      Package: Hardpaper+ film package. Wooden case can be made for special care delivery. We can make other packings per your requests.
      Delivery detail: Usually 25 working days for a 20 feet container.

      2. Detailed Description
      Double panel offers the latest in stylish home improvement.


      A breeze on ventilation, especially when both doors are open, French doors offer the ultimate in elegance and access to your garden or patio area. They transform an opening into a grand entrance.


      Anti lift pins to each door prevent door being illegally levered upwards to disengage locks.
      Double safety glass (5mm+9A+5mm)


      Facility to have both doors with fully operational handles, inward or outward opening way, luxury and beautiful and solemn appearance, with high-quality hardware, opening smooth, safe and reliable

      3. Tech Data Shown Below
      Acoustical insulation
      36 dB

      K-value of window
      1.80 w/ m2. K

      Wind resistance
      5000 Pa

      Air permeability
      0.1 m 3 /h. M

      Watertightness
      500 Pa

      4. Payment and Shipping Terms

      A, FOB price, calculated depending upon the delivery place, usual price is EX-WORKS Guangzhou.

      B, Payment terms: Bank transfer/ T/T, based on quotation sheet or contract.

      5. Scope of Service

      A, Free technique consulting, project design and estimates before sales.

      B, Commitment of at least three years quality warranty.

      China supplier of pvc doors windows

      China supplier of pvc doors windows

      China supplier of pvc doors windows

Q:Broken bridge aluminum screens how to go up
First of all say that the broken bridge aluminum windows are generally suitable for shampoo style, removable wash screens, box frame window, anti-theft screens can be, mainly to see what your needs, such as your family has children, For example, if you want to install a line of sight is good, you can go to the East * window * network to see if there is a demand in accordance with the demand or choose to meet your needs after the product you want to install this to see you do that section of the screen , Different models of the installation of the screen a little bit different, some models need to install electric transfer, the first to be drilled, unless you can choose a suitable for their own installation of the product, that is, do not need to turn on the installation
Q:What is the gap between the window and the wall?
The window to install playing foaming agent, hole and window frame around the gap should be left in the 2 cm or so, the gap is too small blowing agent is difficult to hit into the gap is too large blowing agent and difficult to play the role of sealing, and then The gap is too large will affect the appearance. If you have more questions, you can click on ID consultation.
Q:Plastic window is not also called plastic doors and windows, how to explain is a kind
The so-called plastic window is plastic + lined steel, that is, in the plastic bag there are 1.2mm thick steel. Landlord said the two windows from the material is two categories.
Q:The installation method of color steel activity room
① Before installation, the construction unit shall check the product certificate, design document and pre-assembly record of the component, and check the size of the recording component. Deformation of the steel structure, defects beyond the allowable deviation should be processed. Before installation, should be prepared in detail the measurement and correction process, thick steel plate welding should be installed before the simulation of the product structure of the process test, the preparation of the corresponding construction process. On the assembled roof truss should be a certain degree of arrogance. ② steel structure hoisting in place, the component positioning axis, elevation and other design requirements of the control point to do a good job marking, the quality of the lifting connector for welding before the inspection. Installed temporary support and steel cable to make steel roof truss in the construction process safe and stable. ③ steel installation, the construction unit should be submitted to each component after lifting the elevation size, welding, painting, etc. were submitted to the supervision and acceptance.
Q:Aluminum alloy doors and windows frame how to tear the film
Highest heat treatment! Remember, do not scratch with a blade!
Q:Do the doors and windows installed in the hole before the installation of metal sub-frame, and then install the main frame, the main frame and sub-frame between the cracks to how to deal with? More
Fire agent, also known as sealant, specifically do this with
Q:On the provisions of stainless steel railings weld
There is no rigid rules on the seam on the welding, no seam as little as possible welding, solder joints small
Q:Doors and windows outside the door and the door and window hole size difference if only to the size of the hole how to install into the box size of the external problem added: in the end is minus a few centimeters ah? More
General box size is the size of the door and window openings height by 4 cm
Q:Four-wheel positioning adjustment screw how to install
Four-wheel positioning requires tilting and pulling rods. Adjustment screw, extensive application of oil refining. Chemical. Car. Ship. Medical. Food. Packaging. Light industry and other mechanical equipment in the control system. Door frame adjustment screw, which is an easy-to-process, combined door and window frame adjustment screw consisting of a screw sleeve with a screw, which is provided with a longitudinal slit for said The first staples of the rear end of the screw are passed through the first-order hole of the screw sleeve, and the first-order hole is elastically deformed to expand its aperture so that the catching flange passes The front end of the first step hole is located at the front edge of the first stage hole and the rear end flange of the rear end of the screw is limited to the rear hole of the first stage hole, whereby the structure Easy, quick assembly of progressive benefits.
Q:Would you like to be able to paste mosaic?
Most of the southern region can paste mosaic, the problem is not big!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords