cheaper of pvc doors windows

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

China supplier of pvc doors windows

    • 1. Packing and Delivery
      Package: Hardpaper+ film package. Wooden case can be made for special care delivery. We can make other packings per your requests.
      Delivery detail: Usually 25 working days for a 20 feet container.

      2. Detailed Description
      Double panel offers the latest in stylish home improvement.


      A breeze on ventilation, especially when both doors are open, French doors offer the ultimate in elegance and access to your garden or patio area. They transform an opening into a grand entrance.


      Anti lift pins to each door prevent door being illegally levered upwards to disengage locks.
      Double safety glass (5mm+9A+5mm)


      Facility to have both doors with fully operational handles, inward or outward opening way, luxury and beautiful and solemn appearance, with high-quality hardware, opening smooth, safe and reliable

      3. Tech Data Shown Below
      Acoustical insulation
      36 dB

      K-value of window
      1.80 w/ m2. K

      Wind resistance
      5000 Pa

      Air permeability
      0.1 m 3 /h. M

      Watertightness
      500 Pa

      4. Payment and Shipping Terms

      A, FOB price, calculated depending upon the delivery place, usual price is EX-WORKS Guangzhou.

      B, Payment terms: Bank transfer/ T/T, based on quotation sheet or contract.

      5. Scope of Service

      A, Free technique consulting, project design and estimates before sales.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do you want to install a seal tape for steel windows
Some, the People's Republic of China Construction Industry Standard JG / T187-2006 Building doors and windows with sealing tape
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Doors and windows of the installation methods are plug and mouth two "plug" installation of this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:On the floor of the floor?
This is simple, buy some protective film on top of it can be friends, if it is furniture can refer to the way Jiang, you can meet your needs.
Q:The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
The horizontal line of the window to determine the level of the installation of the window; entry and exit line on the window side and the inner wall of the flat, or highlight the size (press Decoration requirements), steel windows, aluminum windows every wall center line.
Q:Why do wooden doors and windows installed is the first installation of windows and doors after plastering and metal doors and windows and plastic doors and windows is the first plaster into the mouth after the installation
Door and window construction with dry construction and wet construction
Q:What is the size of the doors and windows of the building? Like M1021 or C1520 height is from the amount of the above? What about the above beams?
M1021 said the rear frame set aside the size of the doors and windows hole 1000 * 2100, the installation of doors and windows, the hole and the door frame between the frame there is a thickness of about 1cm gray strip, when used in the wall plaster embedded window frame The The actual door frame size is 980 * 2090 doors and windows height does not include the beam height. Therefore, with or without beams, does not affect the size of doors and windows. Look at the map to understand
Q:How do I use a board wall?
With wooden keel made lattice spacing 400 * 400. Fixed on the ground and the top. If you are cheap, you can directly on the keel seal gypsum board. Side of the seal on it
Q:Rough leveling how to use?
Before the construction should measure the wall to determine the thickness of the wall leveling layer, if the wall flatness is very good, you can reduce the leveling layer thickness, do not have to worry about whether the material can meet the strength, because the Pratt thick rough construction thickness from 5mm To 50mm are suitable. Determine the thickness of the leveling layer should be in the wall for the elevation of the line, the spacing between each tendons in the 1.2-1.5m or so, according to the experience of construction workers to determine the vertical arrangement of tendons from the corner position in turn arranged. Prades without formaldehyde rough leveling is a one-component powder products, according to the requirements of the amount of water (about 45%) can be used evenly stirred. Base surface requirements solid clean without powder, no sand, no peeling, surface attached debris, oil should be clear, the hole should be filled in advance. Check whether the doors and windows frame is securely connected and fill the gap between the door frame and the wall with a good "paste". Adjust the "slurry" should be within 30 minutes on the wall, in the grassroots first thin scraping again, the purpose is to make the material and the grass-roots contact between the full. And then approved on the wall enough to adjust the "slurry" with a 2m long by a one-time scratch can be. Indoor pillars, the location of the wall angle should be increased Prades Corner, the height of not less than 2m.
Q:What are the problems with the installation of windows?
Wall plaster and hole whether there is a gap?
Q:Red TV background wall, white wall, juvenile window frame with what color curtains nice, living room, bedroom, son room
The whole should be a red line, specifically to see what you like a tone, 1. Can be red ash, is similar to brown. 2. Pink tone, 3. Purple purple. 4. All the furnishings of the room reflect the taste of the owner, it is recommended not to use a similar cartoon or other incompatible decoration.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range