Good Quality PVC Door Frame TCF90B

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Our factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.

  We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.

  We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.

Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fenqiang and door frame installation is the first pink wall or the first door frame
Of course, is the first door, but now there is a ready-made combination of doors and windows, do not have to first doors and windows, leaving the door frame size, with the expansion screw fixed up. Not the first to install windows and doors after the fenghuang beautiful.
Q:The construction method of wall tiles
Q:What are the steps behind the construction of the building after the closure?
The frame is made up of the staircase or the staircase. Mixed structure: do ash cake, elastic line, ready to accept and install the door frame.
Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
Glass installed a piece of plastic is the last thing else or else trouble again
Q:Who knows how to change the color of the aluminum frame
Go to the building materials market to buy paint film is estimated to solve your problem
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Doors and windows of the installation methods are plug and mouth two "plug" installation of this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:Will the steel doors and windows can be a single layer of glass can not change the case of doors and windows with a layer of glass Plus a layer of sound insulation is not much better?
It can be replaced by a hollow glass into it
Q:Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The
Only for the living room and bedroom (kitchen and toilet can be synchronized) grass-roots treatment --- Chong Qiang --- wall head putty --- floor tiles - installation door frame, bag mouth --- grinding to find --- 2 times putty , Baseboard installation --- last latex paint. Note that as long as do not let the tiles polluted the walls of the final finish on it. Want to save points to scratch the end of the sub-package door. Intermediate processes are generally not so rigorous.
Q:There are doors and windows installed with main and auxiliary boxes
The use of foam caulking agent is also called styrofoam, plus cleaning agent.
Q:What are the welding principles for steel doors and windows?
The steel frame with the doors and windows of the project that is to take dry construction, steel frame only from the middle of the connection, the steel frame with its own welding requirements are not high; but the steel frame to form a frame, horizontal or vertical length can be. Want to learn more about the doors and windows of the wall knowledge, please Google input: "Union curtain wall Forum"

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range