Good Quality PVC Door Frame TCF240

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Our factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.

  We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.

  We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.

Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Aluminum alloy window frame is installed after all around to play foaming agent?
Four sides should be playing foam agent. Bottom side with cement mortar alone is wrong. Because aluminum alloy thermal expansion and contraction is much larger than the cement mortar, the course of time must be separated from the cement mortar, cracks. If you use the blowing agent, foaming agent itself has a certain flexibility, can be better fit aluminum alloy to play a sealing effect.
Q:Broken bridge aluminum screens how to go up
The first step: the yarn box, air slot, bottom assembled, and then use six screws to twist it to make it a square box. The second step: the screen on the installation site, pay attention to the left and right air duct and the door window frame to the left and right symmetry, bottom position from the door frame frame to be about 5cm lower, put the left and right with the clip, Doors and windows so that they can not move. The third step: with electric drill with 3.2mm drill bit in the door window frame inside the puncture. Step 4: According to the need in the left and right air trough and below the bottom of the corresponding place marked with 6 to 14 eyes, and then screw the screw is installed. Installation Notes: 1, the yarn box to be vertical fixed, broken bridge aluminum doors and windows at both ends to occupy the upper and lower border prevail. 2, up and down the slide with the location of the parallel box fixed, to avoid skid inside and outside skew. 3, the base position to close the pull beam, placed in the sliding window swoop to close and then draw lines and fixed, so as not to fixed position too far or too far. 4, if the parts of the fixed nail is too long, will prevent the normal sliding sliding window slick, broken bridge aluminum doors and windows can be self-nail with a shears cut short can be.
Q:Autoclaved aerated concrete block construction requirements in the doors and windows on both sides of the puzzle and blocks and other high-width C15 prefabricated concrete block, what is the length of it?
Length is generally 12cm ~ 15cm
Q:Do doors and windows and curtain wall construction is carried out at the same time or cross-operation? Trouble experts to mention something
To see how your project is like, it should not be affected, if there is a cross before the doors and windows in the curtain wall, pay attention to the edge of the problem, leakage problems.
Q:What are the key points for the production and installation of wooden doors and windows?
2, the first fixed hinge side, to be close can not have a gap, up and down and left and right vertical, with screws or gun nails fixed; 3, door sets and the door frame pressure can not exceed 0.3mm, the line in the saw 45 ° angle when the corner to be straight, if burr, sandpaper sanding after the fight; 4, after installing the door, check whether the two sides are equal, the door is too large or too small , Some to open and close the page must be the first amount of accurate size, before processing, assembly page when the screw to play straight, lock to be firmly flush; 5, good product protection.
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Hello: doors and windows of the installation methods are plug and mouth two "plug" to install this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:I would like to ask, the interior wall plaster door window frame a few centimeters ah, the external wall insulation board wiping the surface of the door window frame a few centimeters ah?
Interior wall plastering door frame 5 mm or so, elegant approach should be silicone edge (where you are rough delivery). External wall insulation board wiping the surface of the laminated window frame is not greater than 1 cm, pay attention to the edge of the silicone must be, here is the weak water seepage.
Q:Can plastic windows replace fire windows?
Can not, plastic window The main chemical composition is PVC, so also called PVC profiles. It is easy to change at high temperatures! If the fire is blocked by plastic windows! But the temperature is greater than the capacity of steel windows will cause the plastic window melting and deformation! What do you know about it?
Q:Bathroom, wash basin cabinet door mosaic
Washing table (cabinet door) face mosaic, had to use woodworking board to do the base layer because it is necessary to always open, if not open, then available cement pressure board hanging plaster stickers mosaic.
Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
Wait until the next glass is put together

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range