China supplier of pvc doors windows

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

    • 1. Packing and Delivery
      Package: Hardpaper+ film package. Wooden case can be made for special care delivery. We can make other packings per your requests.
      Delivery detail: Usually 25 working days for a 20 feet container.

      2. Detailed Description
      Double panel offers the latest in stylish home improvement.


      A breeze on ventilation, especially when both doors are open, French doors offer the ultimate in elegance and access to your garden or patio area. They transform an opening into a grand entrance.


      Anti lift pins to each door prevent door being illegally levered upwards to disengage locks.
      Double safety glass (5mm+9A+5mm)


      Facility to have both doors with fully operational handles, inward or outward opening way, luxury and beautiful and solemn appearance, with high-quality hardware, opening smooth, safe and reliable

      3. Tech Data Shown Below
      Acoustical insulation
      36 dB

      K-value of window
      1.80 w/ m2. K

      Wind resistance
      5000 Pa

      Air permeability
      0.1 m 3 /h. M

      Watertightness
      500 Pa

      4. Payment and Shipping Terms

      A, FOB price, calculated depending upon the delivery place, usual price is EX-WORKS Guangzhou.

      B, Payment terms: Bank transfer/ T/T, based on quotation sheet or contract.

      5. Scope of Service

      A, Free technique consulting, project design and estimates before sales.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do I install windows?
Inside the window, then the screen installed on the outside, with stealth Shachuang, with the time to open the window to open the screen, do not use the words off the window window
Q:Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The
Only for the living room and bedroom (kitchen and toilet can be synchronized) grass-roots treatment --- Chong Qiang --- wall head putty --- floor tiles - installation door frame, bag mouth --- grinding to find --- 2 times putty , Baseboard installation --- last latex paint. Note that as long as do not let the tiles polluted the walls of the final finish on it. Want to save points to scratch the end of the sub-package door. Intermediate processes are generally not so rigorous.
Q:What are the key points for the production and installation of wooden doors and windows?
2, the first fixed hinge side, to be close can not have a gap, up and down and left and right vertical, with screws or gun nails fixed; 3, door sets and the door frame pressure can not exceed 0.3mm, the line in the saw 45 ° angle when the corner to be straight, if burr, sandpaper sanding after the fight; 4, after installing the door, check whether the two sides are equal, the door is too large or too small , Some to open and close the page must be the first amount of accurate size, before processing, assembly page when the screw to play straight, lock to be firmly flush; 5, good product protection.
Q:I would like to ask, the interior wall plaster door window frame a few centimeters ah, the external wall insulation board wiping the surface of the door window frame a few centimeters ah?
Pressure a few mm, the pressure is not more coordination
Q:Glass curtain wall and doors and windows to do what information? Do you want to do some information when you install the doors and windows frame? The
Sub-box, lightning protection, waterproof, the main frame and the sub-frame connected to the screws, these are hidden, to cover the acceptance records, the rest do not need to attach the form, the main frame is installed, with inspection batch form, glass ibid.
Q:How to deal with the door frame and the wall connection
First, now the doors and windows and doors of the installation, most of the woodworking board is used to do the background, the use of wood screws and styrofoam fixed, and then the door, window sets of lines sealed; there are individual lining plate, Position and size, the use of styrofoam filled with fixed (gap must be more than 10mm) Second, the polyurethane foam is the installation of doors and windows in the current convenience of the popular process, if it is to consider the problem of seepage of the window, you can refer to the following process operation: The connection of the window to the wall shall first check the number of connectors and the right connector of the brackets and the windows. Check that there is no shaking and jogging between the frame and the wall before no capping. If you find the above phenomenon, the embedded parts to be reinforced, and around the window frame with foam polyurethane to fill, to stay 6 × 6 seam with silicone embedded real. 2. Grass-roots plastering to strictly check the location and size of the hole to prevent the installation of the window frame and then adjust the overall impact of grass-roots level, grass-roots construction must be strictly stratified construction. 3. In the surrounding block before the need to clean up the debris, and rinse, caulking with caulking tools will be embedded into the mortar, and layered embedded, embedded real, to enhance the anti-seepage effect. 4. The windowsill to make a certain out of the water, in order to quickly discharge the rain, the window frame around the outside are sealed with a sealant, the sill outside the lower mouth must be made of notch drip tank to prevent climbing.
Q:Do you want to install a seal tape for steel windows
Some, the People's Republic of China Construction Industry Standard JG / T187-2006 Building doors and windows with sealing tape
Q:The installation method of color steel activity room
① Before installation, the construction unit shall check the product certificate, design document and pre-assembly record of the component, and check the size of the recording component. Deformation of the steel structure, defects beyond the allowable deviation should be processed. Before installation, should be prepared in detail the measurement and correction process, thick steel plate welding should be installed before the simulation of the product structure of the process test, the preparation of the corresponding construction process. On the assembled roof truss should be a certain degree of arrogance. ② steel structure hoisting in place, the component positioning axis, elevation and other design requirements of the control point to do a good job marking, the quality of the lifting connector for welding before the inspection. Installed temporary support and steel cable to make steel roof truss in the construction process safe and stable. ③ steel installation, the construction unit should be submitted to each component after lifting the elevation size, welding, painting, etc. were submitted to the supervision and acceptance.
Q:Do you want to eat the windows and doors?
Yes, but can not eat too much. Eat too much, then the pressure line can not afford to unload, and the glass will not drill into the
Q:Doors and windows installed
Specification expressly prohibits the use of nail fixed doors and windows, and should be fixed with expansion bolts. Do the project supervision should be clear.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range