Windows and Doors with glasses

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

pvc casement sliding doors specification:

Certificate

ISO9001 : 2000

Door style

European style; American style,Africian style; Asian style

Opening style

casement/swing

Specification

(size, color,etc.)

Different countries have different demands for it.

profile

2.5mm thickness, Conch brand pvc, 1.2mm inforcement steel

Glass

Single, double, tripled glass; double glass with grille.

Low-E glass, Tempered glass, floated glass, reflective glass, etc.

Thickness: 4mm, 5mm,6mm,8mm; Space: 6mm,9mm,12mm,16mm, etc.

Blinds availableauminum or pvc blinds inside or outside

Seal

Rubber sealing strip, black or grey color

Hardware

High quality Chinese hardware,Chugn, Kin Long (Multi-point lock and handle) ,

G-U or ROTO also can be used

Mosquito meshes

Metal and nylon material

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Engineering technology, doors and windows frame installation and floor of the ground construction of the order of the problem, the gods who come to help.
First install the door frame, in the brick door frame is not installed first, then the door is easy to deformation off, the first installation of the door frame can effectively prevent the door and door frame deformation off the door of the situation, the door height in the production of the thickness of the brick Stay in the minus 1cm, to avoid the door core hanging feet friction floor tile.
Q:Plastic steel window frame and the gap between the walls shall not be filled with cement mortar, should be filled with elastic material filled with what kind of elastic material is better
Polyurethane foam caulking is the convenience of the doors and windows in the installation process, if it is to consider the problem of water leakage, you can refer to the following process operation: 1. Window and wall connection should first check the embedded parts and window connector Quantity, location is correct, in the absence of caulking should check the window frame and the wall between the shaking and micro-moving phenomenon. If you find the above phenomenon, the embedded parts to be reinforced, and around the window frame with foam polyurethane to fill, to stay 6 × 6 seam with silicone embedded real. 2. Grass-roots plastering to strictly check the location and size of the hole to prevent the installation of the window frame and then adjust the overall impact of grass-roots level, grass-roots construction must be strictly stratified construction. 3. In the surrounding block before the need to clean up the debris, and rinse, caulking with caulking tools will be embedded into the mortar, and layered embedded, embedded real, to enhance the anti-seepage effect. 4. The windowsill to make a certain out of the water, in order to quickly discharge the rain, the window frame around the outside are sealed with a sealant, the sill outside the lower mouth must be made of notch drip tank to prevent climbing.
Q:What are the steps behind the construction of the building after the closure?
Hurry to do roof insulation, waterproof ah! If you encounter rainy season, do not do waterproof on the trouble ah!
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Doors and windows of the installation methods are plug and mouth two "plug" installation of this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:Will the steel doors and windows can be a single layer of glass can not change the case of doors and windows with a layer of glass Plus a layer of sound insulation is not much better?
Of course you can change the glass bar on it. Sound insulation effect in general, will be better. High frequency noise is effective.
Q:Plastic window GB8814-88 what it means
GB8814-88 is the implementation of standards
Q:EPS line is good or GRC line is good? Villa facade, doors and windows frame.
I am doing GRC from the time that GRC is the time from the test of the EPS light but time long material stability do not know how
Q:Second - hand housing renovation, do not want to decorate, just want to re - brush the wall, paint the door and window frame, which should first brush?
The first brush which will do, but attention can not be carried out at the same time, because it is easy to react so that the wall turns yellow. The windowsill paint can be polished after painting, but pay attention to the chemical properties of paint, not the same type of paint is easy to chemical reaction, it is best to find a professional oil workers look and then buy paint. In addition, it is recommended to change the windowsill into stone, or later will be dry skin.
Q:What do all the walls make gypsum board grasses mean
Should be "all the walls to do gypsum board grassroots" after this sentence there are features that can be listed together?
Q:The installation method of color steel activity room
What kind of structure to look at the drawings to say

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range