Good Quality PVC Door Frame TCT6015

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Our factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.

  We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.

  We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.

Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Hello: doors and windows of the installation methods are plug and mouth two "plug" to install this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:Bathroom, wash basin cabinet door mosaic
I have seen with the blockboard to do the backplane, with adhesive.
Q:Will the steel doors and windows can be a single layer of glass can not change the case of doors and windows with a layer of glass Plus a layer of sound insulation is not much better?
It can be replaced by a hollow glass into it
Q:How to clean the latex paint after the door frame and the window?
Latex paint is water-soluble, with wet cotton cloth first wet, until the latex paint softened it is easy to wipe off.
Q:The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
In the measurement, the hole in the same horizontal line should be measured on a horizontal line to measure the height of the hole, and the width of the hole in the same vertical line is measured, whichever is the minimum (the minimum value of which is negligible, Doors and windows through the repair hole alone) as the same specifications of the doors and windows of the design guidelines for the external walls of the wall is not clear water or cement mortar exterior decoration, should be the construction axis and the horizontal line as the benchmark window and the horizontal axis, to measure the doors and windows The minimum width and height of the hole, and should be based on building outside the row of rulers to determine the final size of the doors and windows processing. The determination of the gap between the construction hole and the doors and windows, in excluding the architectural design error, by measuring the minimum horizontal height and minimum vertical width of the hole as the design criteria for the size of the doors and windows, do not have to consider the size of the building openings in Table 1 allowable deviation To consider the table 2 and Table 3 doors and windows when the deviation occurs when the measurement occurs when the positive deviation of the probability that the measurement of the size of the phenomenon is too large, doors and windows under the effect of temperature expansion and decorative surface layer thickness and other factors, Should be determined in accordance with Table 4, the gap between the doors and windows theoretical gap.
Q:My family's windows shaking? (4 meters high, 4.5 meters wide) (material aluminum plastic)
Pictures can not be opened, but I think as long as it is easy to shake the quality of the windows are off, you can find the property company, asked to send people to reinforce maintenance.
Q:Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The
The principle of built-in construction should follow the principle of the first, the first after the next, is the mud after the wood (finishes) of the major principles, specifically as follows for reference: room closed (outside the door window frame - glass installation and protection) The ceiling of the mechanical and electrical end of the positioning of the ground surface of the ground, waterproof; door door installation; the installation of the wall, Wall ceiling, ceiling paint primer and in the coating; installation of wooden doors, wooden finishes, fixed, the top of the wall Furniture; installation of wood flooring; receiving baseboard, switch panel; baseboard switch panel around the second leveling; paint surface; lighting and other mechanical and electrical terminal installation.
Q:Sun door and window frame 80-66 refers to what
The width dimension is 80mm and the thickness dimension is 66mm
Q:What is the horizontal line? How do I install windows and doors on a horizontal line?
That is, five lines, both vertical and horizontal, the best line
Q:Doors and windows outside the door and door and window hole size difference if only to the size of the hole how to install into the box outside the size
General box size is the size of the door and window openings height by 4 cm

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range