PVC sliding doors

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • PVC sliding doors /Glass sliding windows

  • VC(vinyl, plastic) material, 60mm, 80mm series

    A. Color: Mainly white and Green, other color is also acceptable.

    B. Size: As for your need

    C. Glass: Single glass, Insulated glass, Low-e glass, Argon glass, Tempered glass

    D. Hardware: Chinese top brand

    E. Packing: Standard Export packing

    F. Function:

      1. Good appearance

      2. Can give you more space

      3. Good Air Infiltration and Water Resistance

      4. Sun resistance and Durable

      5. Easy Install and Easy Maintain

    Long-lasting durability, energy-saving, sound-proof

    Certified quality by national and international institutions.

      1.Package and Delivery:

      Package: standard export packaging. We can make other packings per your requests.

      Delivery detail: usually 25 working days for a 20 feet container.

      2.Payment and Shipping Terms

      a, FOB price, calculated depending upon the delivery place, usual price is EX-WORKS.

      b, Payment terms:  T/T, based on quotation sheet or contract.

      3.Scope of Service

      You are welcomed to visit our factory any time when you are convenient. We would always supply you with best quality and best after-sale service.

      China supplier of pvc doors windows

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Plastic window is not also called plastic doors and windows, how to explain is a kind
The so-called plastic window is plastic + lined steel, that is, in the plastic bag there are 1.2mm thick steel. Landlord said the two windows from the material is two categories.
Q:Do you want to install a seal tape for steel windows
Some, the People's Republic of China Construction Industry Standard JG / T187-2006 Building doors and windows with sealing tape
Q:The construction method of wall tiles
Q:Aluminum door frames and walls must be left between the joints?
This problem can be small or small. In principle, is to leave the gap, if the level of vertical diagonal no problem, then the door and window frame contact with the wall to play a little bit of blowing agent on the line, the contract is relatively small, do not worry too much.
Q:What is the box method installed in the doors and windows?
A method of installing plastic doors and windows. So that the door frame and the wall completely out of doors and windows of the installation quality is easy to get control, reduce the plastic doors and windows due to thermal expansion and contraction caused by the expansion and contraction.
Q:The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
In the measurement, the hole in the same horizontal line should be measured on a horizontal line to measure the height of the hole, and the width of the hole in the same vertical line is measured, whichever is the minimum (the minimum value of which is negligible, Doors and windows through the repair hole alone) as the same specifications of the doors and windows of the design guidelines for the external walls of the wall is not clear water or cement mortar exterior decoration, should be the construction axis and the horizontal line as the benchmark window and the horizontal axis, to measure the doors and windows The minimum width and height of the hole, and should be based on building outside the row of rulers to determine the final size of the doors and windows processing. The determination of the gap between the construction hole and the doors and windows, in excluding the architectural design error, by measuring the minimum horizontal height and minimum vertical width of the hole as the design criteria for the size of the doors and windows, do not have to consider the size of the building openings in Table 1 allowable deviation To consider the table 2 and Table 3 doors and windows when the deviation occurs when the measurement occurs when the positive deviation of the probability that the measurement of the size of the phenomenon is too large, doors and windows under the effect of temperature expansion and decorative surface layer thickness and other factors, Should be determined in accordance with Table 4, the gap between the doors and windows theoretical gap.
Q:What is the gap between the window and the wall?
First, the mouth is installed when the expansion joints for 15 to 20 mm, the net mouth is installed 10 to 15 mm expansion joints. Second, if the gap is not appropriate can be repaired by the following method 1, the gap between the wall and the window filled with a blowing agent, the outside must use a waterproof sealant to seal the gap between the window and the wall. 2, of course, the premise is that the gap can not be too big The gap is too large, it must first be filled with waterproof mortar smoothing, doors and windows installed fixed, surrounded by windows with a blowing agent to fill, after curing cut, the last outside the border around the inside and outside both sides are playing sealant. 3, if the cracks are not big, then to the market to buy a sealant and simple glue gun, and then do repair work like.
Q:How to do the water around the window wall
I see your picture, I see the external walls of water leakage, the windows are generally in the window below the water, your upper and sides, as well as the left side of the window so far, there are leaking, should be the wall leakage, I suggest you Buy waterproof treasure (liquid) on the outside brush 2 - 3 times, the window on the four sides made waterproof plastic, can only be the case
Q:Why the temporary building interior lime mortar plaster, a period of time after the wall generally cracked?
Why the temporary building interior lime mortar plaster, a period of time after the wall generally cracked?
Q:Plastic window GB8814-88 what it means
GB = GB, 8814-88 = door, window frame with hard polyvinyl chloride (PVC) profiles, is the PVC profile national standard

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range