Paver Cheap T601J/T701J Paver Buy at Okorder

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
300 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Name: T601J/T701J Paver


Parameter:

Paver Cheap T601J/T701J  Paver Buy at Okorder

Paver Cheap T601J/T701J  Paver Buy at Okorder








 Paver Cheap T601J/T701J  Paver Buy at Okorder


Product description:


T601J/T701J asphalt concrete paver has stable and reliable performance and higher performance/price ratio, applicable to the paving of various kinds of stabilized foundation materials and asphalt mixing materials such as stabilized soil and lime-flyash soil, which achieves multiple applications in the construction work for various grades of highways, city roads, parking lots, and squares. The machine features large traction force, strong drive force, compact structure, and convenient operation; it adopts advanced hydraulic telescopic single vibrator, gas heated screed, and the automatic leveling devices (2 longitudinal and 1 horizontal), which ensures higher flatness and compactness of the road surface. The imported high performance wear resistant material and imported hydraulic, electric, and drive parts are commonly used, the manufacturing quality and reliability of the machine has achieved advanced level among similar products, which ensures long life. The unique environmental gas heating system and central lubricating system make more convenient maintenance. Besides, the machine can also be customized with different screed according to customer needs.

Advantage:

Fortune500

Custom AA

State-owned company


Why choose us?

1 sincre

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to solve all your tower crane installation and other questions.  Our goal is to provide the best professional services.

3 quality

 CNBM International’s tower crane  have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many kinds of documents are there in the loader?
On the road to more than B2 driver's license, not on the road, not afraid of traffic police, there is no card does not matter. Yes, I need to go to a school to buy one.
Q:How big is the bucket capacity of model 50 tire loaders?
There are 3 sides with 2.7 sides, Liugong 50 seems to be 2.7
Q:How are the responsibilities of loaders and automobiles divided into 20?
Is it an ice cream cone or an identification mark? If it is the other party hitting the loader, it is his responsibility, but you have to take some responsibility. Thank you. I hope I can help you. Thank you
Q:Who knows the quality of the loaders in Shandong? 16?
16 of the workers can still do it, with a lot of! If the quality is not good, the market must be less used!
Q:What's the difference between the 30 loader and the 50 loader?
30 and 50 of the two in a look, do not know?! Size thing! The same operation, it is recommended to buy 50 Liugong good! XCMG is OK
Q:Loader operation detailed method
Step:1, small loaders often have potential hazards during loading and unloading, and should be especially careful. Loader crash, unloading, the engine should be low speed transmission, the machine should be low speed.2, in a solid and horizontal place, loading and unloading, and roadside to maintain a certain distance.
Q:Loaders often have hidden safety problems
6, in the downhill, prohibited loader coasting in neutral.7, loader in operation, under the arm of the arm, no one stand or pass.8 when the loading boom is raised, the safety pin must be fitted or other measures taken to prevent the falling of the arm.9, loader in the work should pay attention to any time to remove the tire (or track) between the stone slag.10, night work, fashion machines and workplaces should have good lighting.Four, the loader following the work should pay attention to the following safety matters:1. Load the loader from the work site and park the machine in a flat safety zone.2, Matsushita bucket, and wood pad. Remove dirt and gravel from the bucket.3 、 maintain and maintain the machines according to routine maintenance items.
Q:Small game truck loader 4, fifth pass how to pass?
then suck out the box into the room, waiting for the lifting plate bottom will take you up, put the box into the truck can.
Q:How do I change the speed change valve of the loader?
The piston chamber of the old valve is provided with a pressure regulating ring restricting the piston movement, and a pressure regulating ring is removed, so that the piston can compress a spring more, and the pressure can be raised. No new pressure ring, but the core shaft pressure spool out more, can be set on one or several suitable washer, spring is compressed to make the same amount of increase, high pressure, and vice versa.
Q:Where is the loader driver?
China Education Association building construction machinery occupation education Specialized Committee in designated training institutions or your local excavator loader production factory is located in the local customer service training department registration to attend training certificate to the bid committee through the formal learning and examination after.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range