• C7030 tower crane The max load capacity: 16T/12T System 1
  • C7030 tower crane The max load capacity: 16T/12T System 2
  • C7030 tower crane The max load capacity: 16T/12T System 3
C7030 tower crane The max load capacity: 16T/12T

C7030 tower crane The max load capacity: 16T/12T

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description

C7030 is a model of self-telescoping tower crane slewing from the top which is designed and manufacture by CMAX. The maximum hoisting capacity is 16T. All the mechanisms of C7030 adopted advanced technology with reasonable structure, superior performance and exact positioning. The masts are easy to erect and transport.

C7030 can be rail traveling and stationary( or anchorage type) and inner climbing type.


The main technical parameters of C7030 are as following:

The max load capacity: 16T/12T

The tip load capacity: 3T

The work radius: 70M

The max mast section dimension: 2.0*2.0*3.0m/2.5*2.5*5.78m

The max free standing height:


For C7030(16T):

2.0*2.0*3.0m: 48.7m(stationary)/53.6m(traveling)/42.6m(climbing)

2.5*2.5*5.78m: 82.41m(stationary)/83.68m(traveling)

For C7030(12T):

2.0*2.0*3.0m: 51.7m(stationary)/56.6m(traveling)/45.6m(climbing)

2.5*2.5*5.78m: 82.41m(stationary)/83.68m(traveling).

C7030 tower crane The max load capacity: 16T/12T


 


Q:What i am seeing is that people are using manual digging and buckets and manually cutting through steel!If they use cranes, it would be alot faster to get to those buried. I dont belive it is unsafe, if they are meticulous.
Firstly, it can be damnable hard to move cranes through rubble filled streets, even assuming if such things happen to be readily available. Secondly, as the mess beneath the rubble is bound to be unstable, moving stuff off from the top can cause collapses further down. That danger can be lessened by working more slowly and carefully. I dont belive it is unsafe, if they are meticulous. Your belief is all well and good, but is it based on actual experience?
Q:please tell me where you found the info.
The okorder /
Q:I know that the whooping crane population recovered through captive breeding but how many are left currently (right now).
There were 535 total in 2009--the population increased slightly last year but I have not seen a total for the population of 2010. Deaths can occur at any time so the number changes constantly. The Journey North site counts 281 adults in the wild western population and 106 birds in the reintroduced eastern flock. They did not give a number for the birds in captivity so I cannot give you a total. You can follow the reintroduced whooping crane population and their migration each spring and fall on the Journey North (in fall called Journey South site). They also track song birds and hummingbirds and monach butterflies.
Q:any kind of sayings
whoops big whoop don't walk under a crane secure the crane
Q:Hi! I'm only going into 9th grade, but I'm getting a head start on chooising a college. I am absaloutley positive I want to be a musician. Hopefully a singer/songwriter, but my plan B is music production. So, I'm going to put Juliard aside (lol)and here are my choices right now:Crane School of Music,Fredonia School of Music,and Berklee School of Musicplease give me your opinion on those schools, and if you could suggest any others, please do. I need all the information I can get...Ive been doing alot of research but now I need other people's opinions. thanks :)
It really depends on what kind of music you want to study. If you are interested in classical music, Berklee is not your best option. But if you want to study contemporary music, it's basically your ONLY option. It's also the only school with both a Songwriting and a Music Production major. I personally love Berklee. You spend your time surrounded by so many talented people, students and teachers alike, who love and play very diverse styles of music. The experiences you get performing and the feedback you receive both in and out of class about your own music are so valuable. The focus of your education is completely about you- the kind of music you want to play, your work as a unique musician, preparing you whatever you want to do in the future. The environment is very supportive and inspiring. Classes are small and you get a lot of attention from very experienced musicians. I could write forever, so if you have any specific questions or just want to know more in general, please message me =)
Q:If I have one week, is that enough time?
It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
Q:the title. the battery --- 9.6v 2000Mah INT NIMH Crane Stock Battery. will this fit in an echo 1 crane stock? the desc. said its designed for GG and SRC crane stocks, but may fit in other crane stocks.
yeah, all crane stock battery's are pretty much interchangeable.
Q:i will like to crane operator?
You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
Q:crane wreak during stadium construction
Big Blue: January 20, 2000: Video of the Big Blue crane accident that happened in the Brewer's Ball Park Stadium on July 14, 1999 in Milwaukee, Wisconsin. Three men lost their lives in the accident. Although the video is only 1 minute and 10 seconds in length, seeing it is an experience you won't soon forget.
Q:total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
To account for the inefficiencies, and startup currents, you should have a 200 kW (200 kVA) inverter with peak power of 800 kW. The batteries would have to store and deliver about 150 kW. But lead acid batteries would need to be of a higher capacity to guarantee that power level for 1/2 hour, which calculates to 75 kW-hour. I'd say 100 kW-hour capacity. A large 12 volt battery can store about 100 amp-hours which translates to 1 kW-hour, so you would need 100 of this size batteries connected in series/parallel. I made a lot of guesses, you should get better numbers for the motors, the inverters and batteries for a more accurate calculation. An inverter of the size needed will not be a 12 volt unit, but probably 48 or 96 volts DC. so you need to configure your batteries in series parallel to get that voltage. Altogether, the 100 large batteries make this not a practical solution. There are lots of large cranes in the world, what do they use for backup? And why do you need backup. With no power, the clutches would keep the crane and loads fixed in position, my guess.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords