VAWT 200W-3KW
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500 units / month set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Details
1. Lightning rod built in wind turbine body, safe in storm weather
2. No need city power, off grid,
3. Beautiful for the LED street lighting system and the residential block
4. No pollution, low carbon, green life
5. Direct drive, no mechanic friction
6. Start up at 1.0 m/s, cut in wind speed 2.5 m/s
Specification:
Maglev wind generator
| ||||||
Type | CXF200 | CXF300 | CXF600 | CXF1000 | CXF3000 | |
Rated Power | 200W | 300W | 600W | 1000W | 3000W | |
Size(Height / Diameter) | 1035/1150mm | 1090/1240mm | 1320/1540mm | 2200/2400mm | 4200/4570mm | |
Turbine Weight | 22.5KG | 31KG | 49KG | 180KG | 715KG | |
Blades Material | Aluminum alloy | Aluminum alloy | aluminum alloy | aluminum alloy | aluminum alloy | |
Blades Qty. | 3 | 3 | 3 | 3 | 3 | |
Start-up wind speed | 1m/s | 1.3m/s | 1.3m/s | 1.5m/s | 1.5m/s | |
Cut in wind speed | 2m/s | 3m/s | 3m/s | 5m/s, 3.5m/s | 3.5m/s | |
Rated Wind Speed | 13m/s | 12m/s | 13m/s | 13m/s | 13m/s | |
Cut out Wind Speed | 16m/s | 15m/s | 15m/s | 15m/s | 15m/s | |
Survival Wind Speed | 60m/s | 65m/s | 65m/s | 60m/s | 60m/s | |
Generator Type | AC,3 phases | AC,3 phases | AC,3 phases | AC,3 phases | AC,3 phases | |
Controller output voltage | DC12V | DC24V/12V | DC24V/12V/48V | DC48V/24V | DC48/96V | |
Controller output current | <12Amp | <20Amp | <30Amp | <50Amp | <130Amp | |
Controller braking system | 3-Phase /short circuit protection/ NFB/ Manual break or automatic brake optional | |||||
Ambient Temperature | -30~50 ℃ | -40~50 ℃ | -40~50 ℃ | -40~50 ℃ | -40~50 ℃ |
- Q: What is the meaning of the high - voltage high - voltage device in power system, which is mainly used to protect the equipment and equipment
- There has been greater than the power load power requirements, response to the power parameters is high frequency, this requires high cycle splitting device, tripping the corresponding circuit breaker, to remove the part of power grid connected or separated from the original into two or more power to lift the accident or the narrow scope of the accident to
- Q: Under the same voltage level, the rated voltage of the equipment is not exactly the same
- For different electric appliances, rated voltage may be different, commonly used for 220V, 280V, and some appliances used in not rated voltage can still work, but not up to the ideal working condition, rated voltage and the voltage at both ends of the electric appliance has nothing to do with.
- Q: What is the specific name of the double name of the equipment in the electric work sheet? Know please enlighten me.It would be better if you had a sample ticket.
- The double name of equipment refers to the name and number of the equipment.The name of the equipment is Chinese, the number is Arabia. Together is a double name. The same station, will not appear the same name, or the same number, is the only. The only combination of the two can be more accurate.
- Q: Part of the rated voltage of the power equipment is marked 10.5kv, and this is similar to the label 10KV power equipment what is the difference?Consulted a lot of teachers, but it is said that this is the old and new two methods, I would like to ask what is the basis of this, it is best to have a national standard for reference
- Here are a few concepts, you can check1, the network voltage, is the line or the rated voltage of the bus, which is usually said to be rated voltage, including 3, 6, 10, 35, 110, 3302, rated voltage generatorThe rated voltage of the generator is usually 5% higher than the rated voltage
- Q: Power transformers and other equipment are what units procurement bidding, all those procedures!
- There are also a small number of individual units, such as large projects and large enterprises.The procedure is according to the conditions of the project are open to the public, the public required invitation required. There is also a project that is only through the construction project bidding units, equipment, the overall package to the construction unit, organized by the construction unit procurement.
- Q: All I know is a generator, a transformer. I also want to fully understand the power system related to the equipment, from power generation to end users (enterprises, factories, they will design the equipment, production equipment is not to say, but they will be transferred to the electricity, in use is the processing equipment, such as transformer, I only know this involved) equipment, detailed list, thank you ah
- Two equipment: all kinds of relays, switchgear, PLC and other control equipment.The power plant and substation: electric energy metering, remote device (RTU monitoring and high frequency cutting machine), relay protection equipment (generator, transformer, bus lines and other equipment such as protection, differential protection, distance protection, over-current protection, earthing protection), automatic line monitoring device, are now in microcomputer protection the equipment.Enterprise side: the control of power supply system, DCS distributed control PLC programmable control; relay protection equipment (mainly over current protection); reactive power compensation cabinet overvoltage protection, reactive power compensation cabinet intelligent control components.
- Q: What are the technical measures to ensure the safety of the power line equipment?
- 5 hanging sign and installing fence (fence).These are the contents of safety regulations (line part)
- Q: The difference between electric load and power supply capacity
- The coefficient of demand is a comprehensive coefficient, which indicates that the ratio of the actual power taken from the power supply network and the power of the power equipment group. That is, your equipment can not be run at the same time, it is impossible to run at full capacity, as well as line power efficiency, power equipment in the actual operation of the power efficiency and other related. In fact, it is difficult to determine the above coefficients for a group of electrical equipment, not to mention the operator's proficiency, the supply of materials, tools, such as the quality of random factors have an impact on. So we can only depend on the measurement statistics.
- Q: The relationship between primary equipment and two equipment in power system
- The electrical equipment of electric power system is divided into the primary equipment and the two equipment, and the primary equipment (also called the main equipment) is the main body of the power system
- Q: The state of power system equipment is divided into four states
- Several types of equipment in power system:Power system equipment is generally in operation, hot standby, cold standby and overhaul four states
Send your message to us
VAWT 200W-3KW
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500 units / month set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches