Maglev Vertical Axis Wind Turbine 400W

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000 units/month set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Rated Power:400W  

Wind wheel diameter:1240MM(D)/1120MM (H)  

Weight:29KG        

Blade Material: Aluminum Alloy                                                                            

The number of blade:3  

Minimum wind speed start:1m/s  

Minimum power wind speed:2m/s                                                                      

Minimum charge wind speed:2.5m/s    

Rated wind speed:12m/s    

Maximum cut off wind speed:15m/s                                                                      

Resistant to wind speed limit:65m/s    

The type of Generator: Three-phase AC maglev wind turbine                      

Controller output voltage:12V or 24V  

Controller output current:<20Amp                                                                        

Controller brake system: Over speed automatic Three-phase short-circuit braking Normal operating temperature:-30~50 ℃



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The role of electrical equipment handover and preventive testing
Is your company product acceptance test of customer delivery, in order to find new equipment in the design, manufacture, transportation and installation in the process of diagnosis is consistent with the risks, operational conditions, testing of new equipment.
Q:What are the effects of frequency variation on power users and power systems?
Power frequency: generally refers to the frequency of electricity market, China's power industry, the standard frequency of 50 hz. Some countries or regions, such as the United States, are set at 60 hz.
Q:District power equipment installation tender, the need for the conditions of the tender unit
Install the network need to debug the SERC issued installation (repair, test) power facilities permit five level or above qualification this debugging can be tender, can be a one-time construction units and the tender requirements: business license qualification certificate (grade 3) safety production license, the SERC issued Denso (repair, test) power facilities permit five level or above qualification
Q:Maintenance of electrical equipment, security measures to ensure that what
Maintenance of electrical equipment is the safety measures are as follows:1, strict implementation of the "coal mine safety regulations," the provisions of the electricity sector.2, all mechanical and electrical workers must go through rigorous technical training and safety training, qualified after the certificate, undocumented personnel are prohibited posts.3, mechanical and electrical workers to carry the complete power tools and instruments, voltage levels meet the requirements.
Q:What are the lightning protection measures of power system
Power system lightning protection is to prevent the atmospheric overvoltage.The specific measures to prevent the atmospheric overvoltage are: to set up the lightning rod above the high-voltage line (to prevent direct lightning). Install lightning rod (lightning, lightning protection) at the equipment to be protected.
Q:How to handle the qualification test, what kind of power equipment
(a) legal person qualification and perfect organization; (two) the registered capital and net assets of 60 million yuan; (three) the last 3 years to bear the following first items listed, third project and second sub items listed in any one project, and the project quality: above 1 thousand and 330 volts voltage substation 2 or 220 thousand volt substation 5; more than 2 thousand and 330 volt overhead lines 300 kilometers or 220 thousand volt overhead line of 500 kilometers; more than 3 thousand and 220 volt cable line 80 kilometers or 100 meters above the level crossing tower crossing project 1.
Q:Power equipment is required to replace the dimension, the state has no relevant provisions
This depends on the provisions of the local power supply department, generally not mandatory requirements.
Q:The production and transportation process of electric power
The equipment of the two system comprises a measuring device, a control device, a relay protection device, an automatic control device, a DC system and necessary auxiliary equipment. Power system voltage level has 220V, 380V (0.4 kV), 3 kV, 6 kV, 10 kV, 20 kV, 35 kV, 66 kV, 110 kV, 220 kV, 330 kV, 500 kV, 750kV, 1000kV. With the improvement of motor manufacturing process, 10 kV motor has been mass production, so the use of kV, 6 kV has been less than 20 kV, 66 kV is also rarely used. The power supply system is 10 kV and 35 kV. Transmission and distribution system to 110 kV or above. Power plant generator has 6 kV, 10 kV and, with a total of 20 kV, users are 220V, 380V (0.4 kV) low voltage system 20kV.
Q:What are the necessary equipment for power line project?
There are connection tools, such as hydraulic pliers, crimping pliers, pressing tools, connecting tube, detonation pressure tube; the last is a measuring device, theodolite, rod, etc. in addition to the measuring rod; excavation tools such as shovels, iron, hammer and so on.
Q:What specific enterprises and units are used to test the power of the equipment ah
The other really did not ~ ~ ~ ~ ~What do you mean by electrical testing equipment??? High? Low?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range