Maglev Vertical Axis Wind Turbine 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Maglev Vertical Axis Wind Turbine 300W
Maglev Vertical Axis Wind Turbine 300W is ranged as three-phase AC maglev wind turbine, which is designed for utility and adopts three Aluminum Alloy blades with magnetic levitation technology theory, it can work with no mechanical friction,no gear in the motor case.
2. Main Features of Maglev Vertical Axis Wind Turbine 300W
Benefits maglev VAWT in comparison to a propeller wind generators:
(1) higher efficiency than the propeller blades works even in turbulence
(2) visually pleasing appearance
(3) rotation of the blade quiet or almost minimal acoustic noise
(4) movement of the blades even in low wind 1m/sec
(5) turbine construction is resistant to gale 160km/h (100MPH)
(6) designed for mounting on mast, straight or saddle area
(7) design: aluminum, stainless steel, fiberglass
(8) direction of rotation by earth hemisphere using Coriolis force
(9) half design against vane turbines, with the same power
3. Maglev Vertical Axis Wind Turbine 300W Specification
Rated Power:300W
Wind wheel diameter:1230MM(D)/1090MM (H)
Weight:29KG
Minimum wind speed start:1m/s
Minimum power wind speed:2m/s
Minimum charge wind speed:2.5m/s
Rated wind speed:12m/s
Maximum cut off wind speed:15m/s
Resistant to wind speed limit:65m/s
Controller output voltage:12V or 24V
Controller output current:<20Amp
Controller brake system: Over speed automatic Three-phase short-circuit braking
Normal operating temperature:-30~50 ℃
4. Maglev Vertical Axis Wind Turbine 300W Images
5. FAQ
Q1: How is the installation for the wind turbine?
Re: It is easy to instal the turbine, and the system can be assembled in under an hour without any welding.
Q2: Is it difficult to be connected to the PV system?
Re: No, it is easy acturally.
- Q:How to handle the qualification test, what kind of power equipment
- (a) legal person qualification and perfect organization; (two) the registered capital and net assets of 60 million yuan; (three) the last 3 years to bear the following first items listed, third project and second sub items listed in any one project, and the project quality: above 1 thousand and 330 volts voltage substation 2 or 220 thousand volt substation 5; more than 2 thousand and 330 volt overhead lines 300 kilometers or 220 thousand volt overhead line of 500 kilometers; more than 3 thousand and 220 volt cable line 80 kilometers or 100 meters above the level crossing tower crossing project 1.
- Q:Ready to do electrical engineering commissioning, but do not know the work tired? Is there any danger?
- 3, the State Grid Substation Intelligent Inspection Robot infrastructure design, installation, commissioning, operation and maintenance work;4, master the progress of debugging, coordinate and solve the problems in the debugging process;5, sorting out the relevant information required for inspection, organization of the specific project acceptance;6, complete other tasks assigned by the leadership.
- Q:What is the meaning of the high - voltage high - voltage device in power system, which is mainly used to protect the situation,
- High frequency means high frequency, the rated frequency of the power system is 50Hz, the maximum range of 49.8~50.2Hz, under normal circumstances, the power dispatching department will be developed through the power generation plan
- Q:What power equipment is needed for the motive,
- For parts processing and manufacturing, the equipment is gone. For assembly, see engine size. General small assembly, assembly, commissioning.
- Q:What is the importance of annual maintenance of electrical equipment? What harm does not do? As detailed, urgently!
- Two, power equipment testing overviewElectrical equipment preventive testing refers to the equipment has been put into operation according to the stated experimental conditions (test equipment, such as the provisions of the environmental conditions, test methods and test voltage etc.), regularly check the test items, test period ofOr test to find out the hidden trouble of the electric equipment in operation, prevent the accident or the damage of the electric equipment. It is an important measure to judge whether the power equipment can be put into operation and ensure the safe operation.With the rapid development of social economy, the rapid development of science and technology, the range of power equipment testing, equipment and technology are advancing with the times. A set of equipment "health index" including its electrical characteristics and mechanical characteristics of the two part of the contents of the groupAs a result, and can not get the power equipment in the power of the electrical characteristics of the "health value" this problem has been plagued by power users for many years. The emergence of a new condition monitoring technology solves this problem. Not only extends the powerThe concept of equipment testing, but also to fill the blind spot in the field of power equipment testing. The conventional power outage detection and monitoring technology complement each other, to provide a full range of data support for the reliable operation of power equipment.
- Q:Generator, shunt capacitorShunt reactorShunt capacitorStatic compensator
- Other static compensation equipment. The utility model relates to a capacitor and a reactor, which belongs to a device for absorbing reactive power
- Q:What are the effects of frequency variation on power users and power systems?
- 1, the use of motor speed and system frequency, the frequency change will make the motor speed change, thus affecting the quality of the product. For example, the textile industry will change because of the frequency of defective products.2, modern industry, national defense and science and technology have been widely used in electronic equipment affected by frequency.System itself:1, low frequency operation, the generator will be affected by the stress of the blade. Even cause resonance, reduce blade life.2, increase the excitation current, improve the temperature rise, etc..
- Q:What principles should be followed in power equipment maintenance
- (2) the maintenance plan shall be arranged according to the unified arrangement of the power grid to improve the coordination and reduce the outage time of the equipment,. Improve operation reliability and equipment availability.
- Q:How to run a company that operates electric equipment
- Look for people who want to use the electrical equipment, such as the operator of the power station,
- Q:All I know is a generator, a transformer. I also want to fully understand the power system related to the equipment, from power generation to end users (enterprises, factories, they will design the equipment, production equipment is not to say, but they will be transferred to the electricity, in use is the processing equipment, such as transformer, I only know this involved) equipment, detailed list, thank you ah
- Primary equipment is:The power plant and substation, generator transformer (step-up / step-down transformer), busbar, circuit breaker, isolating switch, current transformer, voltage transformer, insulator, reactor, lightning protection equipment (arrester, lightning), grounding device, electric energy metering.Business side: step-down transformer, circuit breaker, isolating switch, current transformer, voltage transformer, insulator, lightning protection and grounding device, the internal power supply generator, reactive power compensation cabinet, electric energy metering,
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Maglev Vertical Axis Wind Turbine 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords