Maglev Vertical Axis Wind Turbine 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Maglev Vertical Axis Wind Turbine 300W
Maglev Vertical Axis Wind Turbine 300W is ranged as three-phase AC maglev wind turbine, which is designed for utility and adopts three Aluminum Alloy blades with magnetic levitation technology theory, it can work with no mechanical friction,no gear in the motor case.
2. Main Features of Maglev Vertical Axis Wind Turbine 300W
Benefits maglev VAWT in comparison to a propeller wind generators:
(1) higher efficiency than the propeller blades works even in turbulence
(2) visually pleasing appearance
(3) rotation of the blade quiet or almost minimal acoustic noise
(4) movement of the blades even in low wind 1m/sec
(5) turbine construction is resistant to gale 160km/h (100MPH)
(6) designed for mounting on mast, straight or saddle area
(7) design: aluminum, stainless steel, fiberglass
(8) direction of rotation by earth hemisphere using Coriolis force
(9) half design against vane turbines, with the same power
3. Maglev Vertical Axis Wind Turbine 300W Specification
Rated Power:300W
Wind wheel diameter:1230MM(D)/1090MM (H)
Weight:29KG
Minimum wind speed start:1m/s
Minimum power wind speed:2m/s
Minimum charge wind speed:2.5m/s
Rated wind speed:12m/s
Maximum cut off wind speed:15m/s
Resistant to wind speed limit:65m/s
Controller output voltage:12V or 24V
Controller output current:<20Amp
Controller brake system: Over speed automatic Three-phase short-circuit braking
Normal operating temperature:-30~50 ℃
4. Maglev Vertical Axis Wind Turbine 300W Images
5. FAQ
Q1: How is the installation for the wind turbine?
Re: It is easy to instal the turbine, and the system can be assembled in under an hour without any welding.
Q2: Is it difficult to be connected to the PV system?
Re: No, it is easy acturally.
- Q: What are the main interference sources of the two power system
- The main source of disturbance in power system are: high voltage isolation switch and circuit breaker operation; short circuit and lightning system; partial discharge; two switch operation system; voltage load change and faults when the power grid has sag, interruption, unbalance, harmonics and frequency variation of power frequency and harmonic electric field and harassment; the magnetic field generator and transformer; transmission circuit in the surrounding electric field and magnetic field; high frequency conduction disturbance and radiation disturbance automation equipment, radio equipment; natural phenomena such as lightning, electrostatic discharge, geomagnetic disturbance and dry harassment pulse generated by nuclear power.
- Q: What is the GIS in power system
- Popularly speaking, GIS is often we can see the switch station, also known as high-voltage distribution device.There are three types of high voltage power distribution equipment: the first is the conventional air distribution equipment, referred to as AIS. The bus bar is exposed directly to the air, and the breaker can be provided with a porcelain column or a tank type. This type is used in Gezhouba Dam power plant.
- Q: How to solve the short circuit of emergency communication equipment
- , a number of amateur radio enthusiasts, radio license, the application of their own call sign plate, usually just play the role of decoration,
- Q: What are the customer groups faced by power intelligent equipment?Products such as electric capacitor reactive power control (capacitor module), reactive power compensation controller, the series of electric power meter, active filtering equipment, power monitoring system, energy management system, operating system and DC power system accessory products.
- Power capacitor is a kind of reactive power compensation device. Power system load and power supply equipment such as motors, transformers, transformers, etc., in addition to the consumption of active power, but also to absorb reactive power. If the reactive power is supplied by the generator, it will affect its active power output, not only uneconomical, but also lead to poor quality of the voltage, affecting the user's use.
- Q: Large engineering construction (such as buildings, factories, institutions) distribution room of the power equipment as required? What's the difference? For example, some requirements never power, and some to eliminate harmonics to improve power quality, the more detailed the better the program
- And some equipment is required to use the 6kV power supply, voltage level and the load of the device determines the choice of power equipment rated voltage, current value. Building, there are generally important electrical equipment such as elevators, in the national specification clearly requires, a class, two types of load is not allowed to power outages, which long requires the use of dual power supply
- Q: What specific enterprises and units are used to test the power of the equipment ah
- Electrical installation company, has installed for repair, test qualification. The test is power detection.
- Q: Power test equipment sales to find power supply company which departments? Which departments of the power supply company will use the power test equipment?
- What kind of power test equipment are you in charge of? Our unit is divided into the experimental class and the automation experiment class
- Q: Is there a warranty period for power equipment?
- Now there is no, you can view the relevant national standards for electrical equipment standards, as well as high and low voltage equipment test manual. Online search, easy to get.
- Q: The two devices of the power system have those
- Internal equipment:1, measuring meter, such as voltmeter, ammeter, power meter, electric energy meter for measuring electrical parameters in the circuit.2, insulation monitoring device.3, control and signal device.
- Q: Rivers and lakes emergency, there is a 110kV and 10kV power supply line works, I would like to ask this kind of power project warranty items, scope, life and other detailed provisions where can be found? Are there relevant regulations? For example, if the provisions of the housing construction warranty, you can check the "construction quality management regulations," but the warranty content of power projects, what information should be checked? Note that the warranty is not repair. Waiting for good people reply, satisfaction and then points.
- According to the "construction quality management regulations," the fortieth: the scope of the warranty and its normal use of the corresponding minimum warranty period of 2 years.
Send your message to us
Maglev Vertical Axis Wind Turbine 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords