Maglev Vertical Axis Wind Turbine 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Maglev Vertical Axis Wind Turbine 300W
Maglev Vertical Axis Wind Turbine 300W is ranged as three-phase AC maglev wind turbine, which is designed for utility and adopts three Aluminum Alloy blades with magnetic levitation technology theory, it can work with no mechanical friction,no gear in the motor case.
2. Main Features of Maglev Vertical Axis Wind Turbine 300W
Benefits maglev VAWT in comparison to a propeller wind generators:
(1) higher efficiency than the propeller blades works even in turbulence
(2) visually pleasing appearance
(3) rotation of the blade quiet or almost minimal acoustic noise
(4) movement of the blades even in low wind 1m/sec
(5) turbine construction is resistant to gale 160km/h (100MPH)
(6) designed for mounting on mast, straight or saddle area
(7) design: aluminum, stainless steel, fiberglass
(8) direction of rotation by earth hemisphere using Coriolis force
(9) half design against vane turbines, with the same power
3. Maglev Vertical Axis Wind Turbine 300W Specification
Rated Power:300W
Wind wheel diameter:1230MM(D)/1090MM (H)
Weight:29KG
Minimum wind speed start:1m/s
Minimum power wind speed:2m/s
Minimum charge wind speed:2.5m/s
Rated wind speed:12m/s
Maximum cut off wind speed:15m/s
Resistant to wind speed limit:65m/s
Controller output voltage:12V or 24V
Controller output current:<20Amp
Controller brake system: Over speed automatic Three-phase short-circuit braking
Normal operating temperature:-30~50 ℃
4. Maglev Vertical Axis Wind Turbine 300W Images
5. FAQ
Q1: How is the installation for the wind turbine?
Re: It is easy to instal the turbine, and the system can be assembled in under an hour without any welding.
Q2: Is it difficult to be connected to the PV system?
Re: No, it is easy acturally.
- Q:We are a manufacturer of intelligent switching equipment manufacturers to bid in the power grid to say what is the first access to what the Department
- 2 please hold valid company documents to the trade and Industry Bureau for consultation!
- Q:No concentrator can be copied directly
- Centralized meter reading. Power system is an important part of power automation system, and it is an intelligent system which develops rapidly in recent years. The system integrates data acquisition (JY-RTU6640), intelligent control and network communication, and realizes remote data exchange and real-time monitoring. Through the centralized meter reading for power users, improve the accuracy, reliability and safety of meter reading work; can realize the real-time calculation of line loss; to detect anomalies and the phenomenon of stealing electricity meter; effective control of electricity arrears behavior; reduce the cost of management, so as to improve the modern management level of power marketing.
- Q:Would like to ask: railway communication, signal, power equipment installation related to mechanical and electrical engineering? If belong to, including specific aspects. Thank you
- 2, the communication system has its own transmission access network system, program-controlled switching system, optical cable and cable system and line real-time online monitoring system, power supply system and power environmental monitoring system (such as these are basically the same equipment and system of telecom operators, need to have a special construction qualification).
- Q:What is the definition of abnormal equipment, equipment failure, equipment failure and equipment accident? From which power standard?
- Obstacles: not clear, probably not normal and must be modified to be normal,If the circuit breaker parameter is not appropriate, change the parameter specification.
- Q:How to strengthen the management of electric power information communication equipment
- Problems in the management of information communication equipment1 personnel structure is not reasonable. With the continuous expansion of the power grid, power information communication equipment is also increasing. But at present, there are some problems in the management of electric power communication equipment, such as the lack of professional staff and the lack of post. At the same time, due to the lack of post phenomenon, resulting in the equipment management and maintenance work in the process of increasing the workload, making the existing staff complaints, work quality and work enthusiasm can not be guaranteed. On the other hand, because the new staff less power communication professionals confidence aging trend is more and more serious, the personnel structure imbalance restricts the progress and development of electric power information and communication equipment management to a great extent.
- Q:Withstand voltage test, power equipment insulation unqualified reasons?
- Test methods and voltage measurement methods are not correct. For example, when the transformer is tested, the non - Test winding is not connected to the ground, and the non - tested winding may be discharged to the ground. For example, the test of large capacity test, the voltage is still on the low side of the measurement, due to the capacitive effect, the actual increase in the voltage on the test sample over the test voltage, resulting in the breakdown of the subject matter, misjudgment is not qualified.
- Q:What is the GIS in power system
- Three Gorges Left Bank GIS a total of 39 switches. Left a total of 8 units of power station and the Three Gorges to Wanzhou 1 line, the Three Gorges to Longquan 1 lines, 2 lines, Three Gorges to Longquan Three Gorges to Longquan 3 lines of four circuits? Left two power plant a total of 6 units and the Three Gorges to Jingzhou 1 lines, 2 lines, Three Gorges to Jingzhou Three Gorges to Jingzhou 3 line etc. three lines.Three Gorges left bank power plant using international bidding procurement, GIS by the internationally renowned manufacturer ABB in 1999, the successful supply installation. The utility model relates to a metal sealed off phase structure, the generator transformer adopts a unit connection, and the two unit wiring is combined into a switch unit which is connected with a joint unit to connect the 3 / 2 wiring. Bus segment, 3 / 2 wiring of the 7 strings, a series of double switch off. GIS net size of about 581.5 meters long, width of 15 meters.
- Q:Hello, I would like to ask what are the main rotating equipment in the power system? What is a rotating device?
- The transformer is non rotating equipment. There are a lot of rotating equipment in power plants, such as fans, fans and so on, of course, the most important is the generator
- Q:Power equipment Market Overview
- A quarter of decline in the national power investment in power generation equipment production units significantly reduced, China's total production of 23 million 103 thousand and 900 kilowatts, up sharply down 14.42%, a decline of 5.52 percentage points over the previous year to expand. The first quarter of 2013, investment in power engineering construction in our country continue to decline in 2012 continued to decline, resulting in power generation equipment production continued to decline; and the power grid construction investment growth, stimulating part of power transmission equipment production increased steadily.Since 2013, with the rapid development of the national UHV power grid construction, China's power grid project investment to maintain rapid growth momentum, pulling the steady increase in the production of transformers. In the first quarter, China's power grid project investment 58 billion 200 million yuan, a substantial increase of 34.7% year on year, the cumulative production capacity of the transformer is more than 31806.95 KVA, an increase of 6.46%, the growth rate of the previous year increased by 6.10 percentage points
- Q:Electric power equipment start-up and commissioning of the project there is a difference?
- The start of the equipment is started in the single test.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Maglev Vertical Axis Wind Turbine 300W
- Loading Port:
- Shekou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 2000 units/month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords