Maglev Vertical Axis Wind Turbine 1000W
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Struture of Maglev Vertical Axis Wind Turbine 1000W
The innovation of Magnetic levitation wind turbine, it refers to many aspects, Such as scientific appearance, applied consideration, electrical engineering, power machinery, Atmospheric Science, wind tunnel experiment, magnetic levitation technology, computer-simulated fractional disciplines, among which Maglev wind turbine is nearly perfect one. Under the light theory of magnetic levitation technology, fan motor will be rotated by wind power without any mechanical friction. Since the generator has no lubricant and no gear, the Magleve wind turbine are high-performance power generation, smooth operation, which is a milestone for a new age of power technology.
2. Main Features of Maglev Vertical Axis Wind Turbine 1000W
Magnetic levitation technology
Independent of the direction of the wind
Startup at low wind speed of 1m/s
Higher efficiency compared to traditional HAWT
Works even in turbulence
Visually pleasing appearance
Turbine construction is resistant to gale 60m/s (132MPH)
Robustness and adaptation to all possible environmental conditions thanks to material of aluminum alloy or stainless steel
Design life: at least 20 years
Noise: Tested by China National Machinery Quality Inspection Centre at 12m/s: <40db
3. Maglev Vertical Axis Wind Turbine 1000W Images
4. Maglev Vertical Axis Wind Turbine 1000W Specifications
Rated Power | 1000W |
Size (Height / Diameter) | 2200/2400mm |
Turbine Weight | 180 KG |
Blades Material | Aluminum Alloy |
Blades Qty. | 3 |
Start-up Wind Speed | 1.5m/s |
Cut-in Wind Speed | 3.5m/s |
Rated Wind Speed | 13m/s |
Cut out Wind Speed | 15m/s |
Survival Wind Speed | 60m/s |
Generator Type | 3 Phase AC |
Controller Output Voltage | DC48V |
Controller Output Current | <50 Amp |
Ambient Temperature | -40 ~ 50 ℃ |
Controller Braking System | 3 -Phase short circuit by NFB brake |
5. FAQ
Q1: Why we use wind power for electricity generation?
Re:Wind speeds are often low in periods (summer, eventually) when the sun resources are at their best. On the other hand, the wind is often stronger in seasons (the winter, in many cases…) when there are less sun resources.
Even during the same day, in many regions worldwide or in some periods of the year, there are different and opposite patterns in terms of wind and solar resources. And those different patterns can make the hybrid systems the best option in electricity production.
Q2: What kind of area can the wind turbin be used?
Re:The practical appication of the maglev wind turbine as below:
1) Power supply for ships
2) Electricity for agriculture and fishery
3) Landscape education of wind energy and electricity
4) Wind-hydraulic generation system
5) Public electricity supply for building
6) Romote area
7) Independent house
8) Correspondence base
9) Street light
10) Electricity supply for community
11) Traffic signals
12) Independent military island
- Q: What are the relevant national standards for power equipment?
- I don't know what to look for on the Internet
- Q: Ready to do electrical engineering commissioning, but do not know the work tired? Is there any danger?
- Power engineering commissioning requirements are as follows:1. Major in electrical engineering, college degree or above;2, with the same type of work more than three years experience in power engineering commissioning;3, skilled office software;4, have a certain project commissioning experience and on-site guidance engineering installation and commissioning;5. Able to travel frequently.
- Q: What is the specific name of the double name of the equipment in the electric work sheet? Know please enlighten me.It would be better if you had a sample ticket.
- Each power device has a Chinese name and numberSuch as: Zhang Road 905 switch, Zhang road is his Chinese name, and the 905 is his numberThe line is the same
- Q: I would like to set up a power engineering Co., Ltd., do not need to know what the scope of business
- Do not need to be able to do anything! Or you can hang on to someone else's qualifications!
- Q: Electric power equipment start-up and commissioning of the project there is a difference?
- The difference is that one is the equipment debugging, testing period to start, one is in the formal production of the time to start.
- Q: I would like to ask the power experts, according to the annual additional electricity, installed capacity, how to calculate the amount of the necessary supporting power equipment, etc.?
- In accordance with the annual increase of 90 million to consider the installation of the words, basically belong to the Chinese power market
- Q: Power equipment Market Overview
- The first quarter of 2013, China's economy once again showed signs of slowing down, iron and steel, nonferrous metals and other raw material prices low volatility, electric power equipment manufacturing production costs at a relatively low level; at the same time by the industry overcapacity, fierce competition in the product market, a common means of low bid for corporate competition. Affected by the above two factors, the 1 quarter of China's power equipment manufacturing industry most price decline, in the electric power equipment Chinese Machinery Industry Federation statistics, 22 small manufacturing industries, there is decline in price index rose only 16 sub sectors, 6 sub industry price index.
- Q: Rivers and lakes emergency, there is a 110kV and 10kV power supply line works, I would like to ask this kind of power project warranty items, scope, life and other detailed provisions where can be found? Are there relevant regulations? For example, if the provisions of the housing construction warranty, you can check the "construction quality management regulations," but the warranty content of power projects, what information should be checked? Note that the warranty is not repair. Waiting for good people reply, satisfaction and then points.
- According to the "construction quality management regulations," the fortieth: the scope of the warranty and its normal use of the corresponding minimum warranty period of 2 years.
- Q: Ask the expert about the design of the power system diagram, 6kV side of the electrical equipment how to supply
- 6kV equipment directly in the 6kV bus out of the lead, do not consider the capacity, it does not affect the use of 380V equipment
- Q: The relationship between primary equipment and two equipment in power system
- The two device is a device for the control, regulation, protection and monitoring of a device, which comprises a control device, a relay protection and automatic device, a measuring instrument, a signal device, etc.. The two device obtains the electrical connection with the primary device through a voltage transformer and a current transformer.
Send your message to us
Maglev Vertical Axis Wind Turbine 1000W
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords