Tower Crane TC7135 ConstructionEquipment Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7135 Description:
1.CMAX Tower Crane TC7135 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7135 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7135 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7135 Parameter:
Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、71
Min working range (m) 2.5
Max lifting capacity (t) 16
Tip load @ 50m (t) 3.5
Tower Crane TC7135 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7135 Diagram:
Tower Crane TC7135 Technical Sheet:
Tower Crane TC7135 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Where was the construction machinery conference held in 2015?
- Co organizer: BMW (Chinese) Engineering Machinery Company Limited, Shandong Lingong Construction Machinery Co, Limited by Share Ltd, Shantui construction machinery Futian leiwo international heavy industry Limited by Share Ltd, Shandong Chang Linzhu Machinery Group Limited by Share Ltd, Shandong rhinos Engineering Machinery Company Limited, Beijing Tianshun Hydraulic Technology Co., Ltd. Ji'nan the Great Wall Andy Machinery Co. Ltd., Langfang Deji machinery Polytron Technologies Inc, Tai'an Dongyue Heavy Industry Co. Ltd.
- Q: Changsha Sanlian Building Machinery Fittings Factory
- In addition, you can check the input path, or the name of the unit on the map. It will remind you that there is no unit in Changsha and no way. In addition, we received a fax, saying that you want to order what goods, may wish to go to the other party's local industrial and commercial Red Shield network to check whether there is this unit
- Q: What measures can effectively reduce the construction accident rate?
- Hefei construction workers training _ security technology to prevent accidents: prevent the basic starting point of safety accidents is to take measures to restrict energy and dangerous material, to prevent the accidental release. Common safety techniques for preventing accidents are eliminating dangerous sources, limiting energy or dangerous substances, isolating and so on.
- Q: Building materials, equipment, components and fittings products must have "three certificates" is what cards?
- Three is a business license, certificate of product quality, product quality inspection certificate. Business license is the legal provisions of some industries must be licensed, and handled by the competent department of the operating permit, such as tobacco monopoly license, drug business license, business license and other dangerous chemicals.
- Q: How are the machine parts stacked?
- Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)
- Q: Definition of large mechanical equipment?
- A crane is a machine that cycles and intermittently moves. A work cycle includes fetching device from the extract to bring up the product, then move to the designated place down items, then reverse movement, the fetching device back in, for the next cycle.
- Q: Mechanical bearings, all types? Roughly
- Spherical roller bearings have two raceways in the inner and outer ring raceways between spherical assembly, a drum shaped roller bearings. The center of curvature of the raceway of the outer race is consistent with the center of the bearing, so it has the same self-aligning function as the self-aligning ball bearing. When the axle and shell are bent, the axial load in two directions can be automatically adjusted. Radial load capacity, suitable for heavy load and impact load. Inner diameter is tapered bore bearings can be installed directly. Or the use of tight sets, the demolition cylinder installed on the cylindrical shaft. The cage uses a steel plate holder, a polyamide forming cage and a copper alloy car holder.
- Q: What are the sub projects of a construction project?
- Lime soil, sand and gravel foundation, geosynthetics foundation, fly ash foundation, dynamic compaction, foundation grouting, preloading foundation, vibroflotation foundation, jet grouting foundation, cement mixing pile foundation, soil and lime soil compaction pile foundation, cement fly ash gravel pile, cement soil pile foundation. Based on sand pile foundation
- Q: What is the difference and connection between equipment manufacturing and machine building?
- In accordance with the standards of classification, including metal products, general machinery manufacturing, machinery manufacturing, transportation equipment manufacturing, electronic and communication equipment manufacturing industry, electrical machinery and equipment manufacturing, instrumentation and office machinery manufacturing seven deducted 186 small consumer related manufacturing industry after class. Equivalent to the European countries referred to as "capital goods manufacturing", that is, we often say "the production of means of production industry."".
- Q: What functions should be achieved in mechanical structure design?
- The main features of the mechanical structure design are: (1) it is a set of thinking, drawing and calculation (sometimes necessary experiments) in one of the design process, is involved in machinery design, the most specific, the largest volume of work, in the whole process of mechanical design, an average of about 80% of the time for the structure design plays an important role in the success of mechanical design. (2) the multi solution of mechanical structure design, that is, the mechanical structure that satisfies the same design requirement, is not the only one. (3) the mechanical structure design stage is a very active design link, often needs to cross repeatedly. Therefore, in the design of mechanical structure, it is necessary to understand the basic requirements of the mechanical structure from the whole of the machine
Send your message to us
Tower Crane TC7135 ConstructionEquipment Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords