Tower Crane TC5013A Construction Equipment Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC5013A Details:
Minimum Order Quantity: 1unit Unit: unit Loading Port: China main Port
Supply Capability: 5unit/month Payment Terms: T/T or L/C
Tower Crane TC5013A Description:
1.CMAX Tower Crane TC5013A is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC5013A can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC5013A has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC5013A has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC5013A has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC5013A Parameter:
Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 40
Max height with attachment (m) 121
Working range can be adjusted (m) 44、50
Min working range (m) 2.5
Max lifting capacity (t) 6
Tip load @ 50m (t) 1.3
Tower Crane TC5013A Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5013A Diagram:
Tower Crane TC5013 Technical Sheet:
- Q:How are buildings, installations and materials divided?
- Equipment generally includes the following: (1) all kinds of equipment and the equipment with the arrival of accessories, spare parts and equipment attached to the body made of ladders, platforms, railings and pipes. (2) various gauges, instruments and automatic control devices, experimental instruments, instruments and meters in the main part of the equipment. (3) components of equipment, such as oils, chemicals, etc. attached to the equipment body.
- Q:China mechanical net
- From Chinese GM parts, general machinery, hardware, tools, instruments, electrical appliances and related equipment, textile equipment, chemical equipment, agriculture, food equipment, construction equipment, environmental protection equipment, mining equipment, metallurgical equipment, financial equipment, commercial vehicles and accessories, machinery processing equipment, machinery processing industry machinery enterprises and mechanical products
- Q:Where are the hanging baskets for the building?
- It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
- Q:Where are the mechanical pressurization air supply facilities set up?
- The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.
- Q:What are the principles, performances and uses of the commonly used construction machinery equipment?
- 3. excavator principle: Excavator through the hydraulic pump to the power of the engine to hydraulic motors, hydraulic cylinders and other executive components, to promote the operation of the device, so as to complete all kinds of operations. Performance: new Isuzu engine, euro II emission, international standards, more into power for you, lower fuel consumption; with high torque rotary mechanism, improve the starting torque of rotary and rotary reducing drift; with a new high efficiency, low noise, large displacement of the main pump, provided high efficiency machine to deal with the bad working conditions; and to strengthen the work of device according to the quarry condition, increase its reliability; strengthen the lengthened crawler frame, while reducing the ground pressure, improve the performance of the fault diagnosis system; new, prolong the overhaul cycle, reduce maintenance cost. Use: 1) building and building foundation excavation; (2) mining soil, stripping mining field covering layer; (3) the quarry, tunnel, underground powerhouse and heap loading operation in the field of material; 4) excavation channel, canal and waterway dredging; (5) replacement of the devices can be pouring lifting and installation, piling, rammed earth etc..
- Q:How are the machine parts stacked?
- Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
- Q:What functions should be achieved in mechanical structure design?
- The main features of the mechanical structure design are: (1) it is a set of thinking, drawing and calculation (sometimes necessary experiments) in one of the design process, is involved in machinery design, the most specific, the largest volume of work, in the whole process of mechanical design, an average of about 80% of the time for the structure design plays an important role in the success of mechanical design. (2) the multi solution of mechanical structure design, that is, the mechanical structure that satisfies the same design requirement, is not the only one. (3) the mechanical structure design stage is a very active design link, often needs to cross repeatedly. Therefore, in the design of mechanical structure, it is necessary to understand the basic requirements of the mechanical structure from the whole of the machine
- Q:What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
- For Turner, fitter, main work gloves, hats, goggles for welder, etc.; there are gloves, shoes cover, goggles, insulated shoes etc.;...... ;
- Q:What are the mechanical drawing software?
- Personally, CAD is suitable for large machines or buildings, and CAXA is the real machine industry's universal software, and can also save drawings in various formats.
- Q:Definition of large mechanical equipment?
- Depending on the size of the part to be machined, the parts must be set up as large equipment with the aid of a crane, and large machinery is usually assembled after the parts have been delivered to the destination. Material handling machinery is mainly in enterprises (including terminals, materials, mines and commercial warehouses, etc.) within the material handling, transportation, lifting, stacking and storage of machinery and equipment
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC5013A Construction Equipment Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords