Toples Tower Crane TCP5023 With Jib length of 50M
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TCP5023 Description
Feature: Tower Crane
Condition: New
Rated Loading Capacity: 10T
Rated Lifting Moment: 1250KN.M
Max. Lifting Load: 10T
Max. Lifting Height: 150M
Span: 0-50M
Model Number: TCP5023
Certification: ISO,CE
Warranty: 12 Month
After-sales Service Provided: Overseas third-party support available
TCP5023 Features
free height: 50m
max.height: 200m
jib length: 50m
tip load: 2.3t
max.load: 10t
power capacity: 59.5kw
power supply: 380V/50Hz or according to clients need
TCP5023 Specification
TCP5023 Pictures
TCP5023FAQ
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
Q: What is the function of the monitor?
A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.
.
- Q: What effect did this have?
- Are you Mr. Matthews class?... okay, MAchinery refers to Thoreau's beliefs in simplicity... the individual advances society doesn't. The machinery is much like society... where the machine changes but the purpose does not. I hope that helps...
- Q: Holy Cow! What happens if the Holy Spirit comes over you while driving or operating heavy machinery?
- Hold on tight!!
- Q: I am planing to start a leather factory where I will only like to produce leather not any product from it like jacket and shoes.So please can anyone tell me where can I buy these machinery?What all machines are required Suggestion will be very helpful!Thanks.
- If you are going to do this in the united states it willl be real tough
- Q: what kind of engineers make sawmill machinery?
- Mechanical engineers most likely I have 'made' machinery for different plants. Technically, I design machinery, other people make it. I am a mechanical engineer and I need the assistance of an industrial engineer and an electrical engineer.
- Q: Where can I get low cost sunflower oil and soap making machinery?
- try okorder
- Q: We found this little shed right outside Virginia City, NV.Inside was this old machinery.. it was probably used for mining.
- Yep, it looks like a winch to me too. I see a second drum, so perhaps it was a winch that could pull a cable in two directions, with the cable looped around a pulley at some distant point and being wound onto one of the drums as it is unwound from the other. (hard to see the gearing, etc., from that image). As for age, that electric motor looks like it's about 100 years old! (just a wild guess, of course)
- Q: Which is better, motor or diesel, on construction machinery?
- The working condition is relatively stable, and the matching motor or the diesel engine will be the same, better than the working conditions. Little effect on choice. In contrast, the purchase of motor driven construction machinery will also cost less.
- Q: pls provide.
- pls explain properly.
- Q: I work at a pizza place, and while washing dishes, a cheese grater fell off the shelf and broke. A piece that is important to the cheese grater's functioning. Now, mind you, it fell off the shelf and I was not touching it. My manager wants me to either pay cash, or he will just deduct it from my check, when I argued with him that it is a cost of doing business.Is this legal, and what sound I do?
- did the boss approve the extra time did your shift supervisor approve it if no to the two then no they dont ought to pay you as you volunteered to do the extra advantageous artwork artwork nor authorized via administration beforehand of it being finished may be seen as volunteer artwork did somebody ask you to stay over if not you worked for unfastened regrettably its legal you chosen to stay and artwork without consent subsequently they dont ought to pay you
- Q: Doctor said im unable to use certain machinery due to causing swelling in my hand but she didn't put me on medical leave but my employer did. Are they allowed to do this
- In a word - yes. The employer, under certain circumstances and if you are not protected by a union or contract, can terminate you.
Send your message to us
Toples Tower Crane TCP5023 With Jib length of 50M
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords