Rectangular Flexible Duct Connector - The Wind Pipe Flexible Joint A Quality
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500000 pc
- Supply Capability:
- 5000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product characteristics
This product takes advantages of high flexibility and high air impermeability and medium resistance of rubber as well as compliance and heat resistance of glass— Fabric and is prepared at both ends with metal spool and flange in connection with wind machine and air duct, which can compensate the thermal expansion by the operation of air duct and multidirections displacement. For better compliance of rubber and fabric and good sound absorption and vibration isolation, the noise and vibration passage can be reduced effectively in the operation of boiler, wind machine and air current. Because the main materials are rubber or fabric and fiber heat preservation materials of light weight without thrust in reverse and in no need of pipe supporting seat, a lot of materials are used so it has good heat resistance and corrosion resistance. In addition, rubber has better air impermeability absolutely without leakage and with lower price than metal compensator and import products.
Installation Direction of Air Duct Rubber (Fabric) Compensator
Thanks for your application for our products, please read it before the installation:
In order to make air duct compensator achieve available effect in pipe and all mechanical performance play their right role and extend its use life, please make installation according to the requirements as follows:
1. Air duct compensator should be installed in pipe in natural conditions and the product distortion by contrived factors should be made in installation, so the products will avoid from early damage and weaker application effect.
2. When air duct compensator is installed to connect with flange, screw of bolt should stretch to the outside of flange to prevent the rubber (fabric) ball from being scraped by whorl tip. The bolt on the face of each flange should be screwed down equably by thread and it is required that all the degree of tightness should be as consistent as possible. In bad conditions, spring gasket can be added except flat gasket to avoid nuts from loosing.
Factory | Firepower power plant | Air escape of boiler and gas turbine |
Landification industry | Air escape of boiler and industrial furnace | |
Fume extractor and desulfurizer | Warm and dry ventilating duct | |
Metallurgy system | Fume and dust extraction of blast furnace | |
Nucleus power plant | Air exchanging device | |
Cement industry | Various kilns, dust collecting and fume and dusting extracting system | |
Equipment | Dust collector | Entrance and exit of wind machines of all the equipment |
Dust collector | ||
Air heater | ||
Washer | ||
Induced draft fan | ||
fan |
- Q: Will metal hose be used on the wastewater treatment equipment?
- Code Subhead Name Engineering Value Value (RMB) Where (unit) Unit Quantity Unit Price Proportion Labor Cost Material Cost 11-26 Earthwork Artificial Trenching Pit excavation pit three types of soil depth within 2m 100m31
- Q: Drain flexible pipe to keep the base design above the elevation of the number of meters
- , there are cloth-based materials, such as Teflon cloth, etc
- Q: Does the desulfurization and denitrification equipment use metal hoses?
- Electrician electrical welder field driver tower crane driver signal workers scaffolding workers lifting workers
- Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
- scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
- Q: The sound of water pipes will not produce infrasound damage to the human body?
- The first look at the factory declaration materials in the building level. The second depends on the material you use sandwich panels. (Generally Caigang sandwich rock wool no problem, glass wool depends on the design requirements of the building).
- Q: Talk about the class flexible management of the class teacher what the requirements
- Hello metal hose made of stainless steel models are mainly single-button type P3 and double button P
- Q: How to effectively deepen the construction process management to improve the quality of construction projects
- Steel is good, it is best stainless steel, aluminum alloy for a long time easy to deformation, organizational structure is very bad!
- Q: Why should the flexible hose be set in the mechanical ventilation system?
- Bowl buckle price is high! There are many buckle-style markets, so rent up cheap!
- Q: Is the clamp type flexible connector connected to the pipe to the rubber pad?
- Construction safety inspection standards (JGJ59-2011) a total of 19 inspection items, they are 1. Safety Management 2. Civilized construction. Fastener steel scaffold 4. Door steel scaffold 5. Bowl button steel pipe scaffolding 6. Socket type plate fastener type steel scaffolding 7. Full house scaffolding 8. Suspended scaffolding 9. Attachment lift scaffolding 10. High operating basket 11. Foundation Pit Engineering. Template holder 13. High work 14. Construction electricity 15. Ingredients Red Chrysanthemum Chrysanthemum Chrysanthemum. Construction lift 17. Tower crane 18. Lifting hoisting. Construction tools hope to help you.
- Q: Steel Reinforced (HDPE) Polyethylene Helical Corrugated Tubes Warm-Fused-Belt Is Connected or Bonded with Rubber Rings? Ask what?
- Flexible waterproof casing is generally suitable for pipes through the walls by vibration or tight waterproof requirements of the structure; rigid waterproof casing is generally applicable to the pipeline through the walls of the requirements of the general waterproof structures; flexible and rigid waterproof casing Wall of the wall, in case of non-concrete should be used instead of concrete walls, and must be a solidification of the casing in the wall; waterproof casing in the construction, chemical, steel, water, sewage treatment and other units
Send your message to us
Rectangular Flexible Duct Connector - The Wind Pipe Flexible Joint A Quality
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500000 pc
- Supply Capability:
- 5000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords