Steel Coupler Rebar Scaffolding For Sale with High Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 8000 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Scaffolding For Sale with High Quality
1.Description of Steel Coupler Rebar Scaffolding For Sale with High Quality:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Scaffolding For Sale with High Quality:
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Scaffolding For Sale with High Quality:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
- Q:Fastener type steel pipe scaffold composed of components
- Fastener type steel pipe scaffold components are mainly shelf
- Q:i just need to know the age limit with parental permission?
- I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
- Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
- ummmm oh i got a good one i hope and that is to build the world's largest bee's hive. plus they make more honey and i would have tons of money, pretty sweet isn't it.
- Q:Scaffold removal should comply with those requirements......
- Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
- Q:What are the dangers of scaffolding
- Analysis of the types of scaffolding accidents1) the entire frame dumping or local collapse frame2) the whole frame instability and vertical collapse3) personnel from scaffold falling
- Q:Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
- For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
- Q:hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
- Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
- Q:so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- I wouldn't suggest changing it for at least 6 weeks. You have to allow the skin to heal before touching, turning or changing the bar. If you do change it beforehand, you risk damaging the skin and cartilage surrounding the piercing. I know that I didn't change mine for about 8 weeks, and I haven't ever had a problem with it.
- Q:Introduction of external scaffolding
- Temporary structure frame for feeding, piling and construction work outside the outer wall of the outer wall for building construction. 1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.
- Q:Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
- Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Coupler Rebar Scaffolding For Sale with High Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 8000 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords