scaffolding Right Angle Coupler for SALE
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
British Type Double Coupler
Size: 48.3mm, Weight: 1.05kg
Surface: electro galvanization, hot dip galvanization,
Material: Q235
Standard: EN74 OSHA
German Type Double Coupler
Size: 48.3 X 48.3mm
Weight: 1.25kg
Surface: electro galvanization, hot dip galvanization,
Material: Q235
Standard: EN74 OSHA
American Type Double Coupler
Size: 48.3X48.3 mm
Weight: 1.75kg
Surface: electro galvanization, hot dip galvanization,
Material: Q235
Standard: EN74 OSHA
British Type Double Coupler
Size: 48.3mm*76mm , Weight: 1.85kg
Surface: electro galvanization, hot dip galvanization,
Material: Q235
Standard: EN74 OSHA
We can supply many types of pressed and forged scaffolding couplers, such as swivel coupler, double coupler, sleeve coupler, putlog coupler, German type, British type, American type, Japanese type and so on.
We are professional manufacturer and supplier of scaffolding systems, scaffolding couplers, and other related products. With good quality and competitive price, our products are very popular in European, Australia, North America, Mid-east, and South East Asia and some African countries.
- Q:Find the demolishing scheme of scaffold
- Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
- Q:Fastener type steel pipe scaffold composed of components
- Fastener type steel pipe scaffold, mainly by the cross bar, vertical pole, fasteners (commonly used is the rotation button, right angle button, connecting rod), foot board, etc.
- Q:Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q:What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
- OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
- Q:by scaffolding ?
- It's a rhetorical question, maybe the girl is held up so well that it could have been something else holding her up there
- Q:What are the full house scaffolding specification
- 5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
- Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
- Q:Erection of steel scaffolding tools and safety supplies
- Anti falling device, professional tool bag, work boots (soft bottom shoes), safety lighting, transportation tools, pulley, skateboard rope, dustproof mask, special conjoined clothes, ear plugs
- Q:For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
- Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.
- Q:My mom wouldn't let me get snakebites or cyberbites but she will let me get my scaffold pierced. I know people have different things for pain etc etc I know it will hurt but I want it pierced. So, to someone who has gotten it pierced or knows about it is there anything special you have to do to take care of it or is it just like the ear lobe piercing.
- it probably does hurt cuz of your cartilage just put rubbing alchahol on it and it should be okay =)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
scaffolding Right Angle Coupler for SALE
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords