• Scaffolding Parts-Cold Galvanized Jack Nut System 1
  • Scaffolding Parts-Cold Galvanized Jack Nut System 2
  • Scaffolding Parts-Cold Galvanized Jack Nut System 3
Scaffolding Parts-Cold Galvanized Jack Nut

Scaffolding Parts-Cold Galvanized Jack Nut

Ref Price:
$1.23 / pc get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
2000 Unit/Units pc
Supply Capability:
5000 Unit/Units Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Scaffolding Parts-Cold galvanized Jack Nut

Place of Origin:  China (Mainland)  

Thread:  Casted or Machine tap 

Surface:  White Zinc 

Material:  ductile iron 

Type:  casted 

Packaging & Delivery of Scaffolding Parts-Cold galvanized Jack Nut

Packaging Detail: Bag or Pallets

Delivery Detail: Meet customer needs

Specifications of Scaffolding Parts-Cold galvanized Jack Nut

34mm scaffolding jack nut

1.Ductile iron, dia.34mm

2.Thread pitch: 6.35mm or 10.0 mm

3.Weight:0.43kg,galvanized.

34mm Scaffolding jack nut

Very Good Casted Manufacturing Ability for All types of casted Nuts.

The professional and experienced manufacturer for all types of cast iron jack nut, wing nut, prop nut...etc

1. Material: Ductile iron

2. Sizes: Dia 34 mm

3. Weight: 0.43kg

4. Surface: Electro galvanized

5. Screw thread Pitch: 6.35mm or 10.0mm

6. Thread: Machine Tap (or casted thread)

7. Type: all types of Wing nuts, jack nuts, heavy duty jack nut, wing nut, prop nut

8. Quality Control for Large amount production to Ensure  Good Quality Products.

Quality controls:

Materials: grey iron ductile iron GG20 GGG50

Processes: sand & investment casting

Machining: Machining services are available

1.Machinery properties and chemical components testing after raw casting

2.Hardness checking after heat treatment

3.Dimensions testing after machining

4.Full machining, primer painting and surface treatment

Materials:

grey iron ductile iron GG20 GGG50

Processes:

sand & investment casting

Machining:

Machining services are available

Quality controls:

1.Machinery properties and chemical components testing after raw casting

2.Hardness checking after heat treatment

3.Dimensions testing after machining

4.Full machining, primer painting and surface treatment

Services:

custom-made services are available


 
 Scaffolding Parts-Cold galvanized Jack Nut    Scaffolding Parts-Cold galvanized Jack Nut

 

 Scaffolding Parts-Cold galvanized Jack Nut    Scaffolding Parts-Cold galvanized Jack Nut

 

 

Q:The whole concrete wall climbing frame or good use of steel scaffolding
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q:What is an integrated climbing frame? What are the works? What are the advantages
The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
Q:Advantages and disadvantages of climbing frame and floor type scaffold
2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
Q:What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
Q:The difference between the scaffold and the scaffold
The climbing frame is the kind of iron that is assembled by a large construction site
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b)Factory Information  
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords