quick form shaft formwork system made in china

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
3000 m²
Supply Capability:
60000 m²/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

quick form shaft formwork system  made in china 


Based on my pp plastic plywood, we develope a formwork unit for shaft /elavator system/.

  this system adopt advanced technology from EU.

size: can be made according to your drawing.

usge: formwork concrete shuttering of elevator shaft.

Rent: available.

brand: Square Circle Formwork

material: plywood + metal.

place of origin: China

factory located in Linyi, shandong,China

tech-support available.


work style:self-adjust and climbing .

        

   The inside form can re-size to fix and dismantle.

quick form shaft formwork system  made in china 


 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the building structure of the template
On the contrary, the beam plate is the first template, tied after the reinforcement, because the beam plate is flat, the first binding steel, do you want to let the first suspension? That's not going to collapse
Q:I would like to ask the template support system Liang Xiaoliang Ban Xiaoliang refers to what
High formwork concrete beams are usually large in size, gravity load, plan people sometimes use 50 x 100 (width * height) wood brace, called Liang Xiaoliang, a thin concrete slab gravity load is less, with 30 * 80 mu Fang, challenge the small beam. According to the different rib beam floor plan, good people, they try to use the same specifications of the wooden architrave, there is no Liang Xiaoliang, small plate beam, just calculate book Liang Xiaoliang, trabecular plate.
Q:The calculation formula of the beam column
No formula, the calculation of the volume of concrete, the calculation of the area of the template, this is no formula can be applied, as long as the understanding of the drawings is slowly
Q:How to calculate the foundation beam, template, and cushion.
. Calculate the volume of the cushion should be very good, where the beam on the cushion ah, as to how the layout drawings will be.
Q:Seeking beam, plate template engineering quantity
Plate template (bottom area): (2.6*3- wall thickness) * (2.4*3- wall thickness) - (2.4*3- wall thickness) *0.2*2 [main beam] - (2.6*3- wall thickness) *0.25*2 [sub beam]
Q:What is the formula of beam slab formwork
Si=F*A*B, formula, F coefficient, A, length, B width or height.Such as triangle F=0.5, A for the bottom edge of the length, B is high.
Q:How to calculate the beam section size is 200 x 400
Building template:Building template is a temporary support structure is made according to the design requirements, the concrete structure components, according to the position and size of the provisions of forming, maintaining its correct position, external loads and under construction template gravity and acting on the. The purpose of template engineering is to ensure the quality of concrete engineering and construction safety, speed up the construction progress and reduce the cost of the project.This paper introduces the construction formwork structure of cast-in-place concrete structure construction, which is mainly composed of three parts: the panel, the supporting structure and the connecting parts. The panel is in direct contact with the bearing plates of concrete; supporting structure is a temporary structure supporting panel, concrete and construction load, ensure the construction template are firmly combined, do not deform and damage; the connecting piece is connected to the panel and the supporting parts of the whole structure.Building formwork is the concrete pouring forming shell and support, according to the nature of the material can be divided into building template, building wood plywood, covered with plastic board, multilayer board, double-sided adhesive, double-sided coated building template. According to the construction process, the construction formwork can be divided into the cast in place concrete formwork, the pre assembled template, the large formwork, the jump formwork and so on.
Q:More than the number of square cross-section of the beam high formwork
According to the "dangerous method" sub project safety management of the construction quality of [2009]87, the height of more than 5m, the total construction loads greater than 10kN/m2, or the template support system concentrated line load greater than 15kN/m to prepare special construction scheme
Q:Beam template and foundation beam template to separate sets of fixed?
When you have a beam template, you can not add the foundation beam template! Their price is not the same, to separate! (mainly reflected in measures)
Q:How to calculate the amount of beam formwork
According to the calculation of the expansion area, the height of support according to the bottom elevation

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range