• Putzmeister Flap Elbow DN180-150 System 1
  • Putzmeister Flap Elbow DN180-150 System 2
  • Putzmeister Flap Elbow DN180-150 System 3
Putzmeister Flap Elbow DN180-150

Putzmeister Flap Elbow DN180-150

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
-
Supply Capability:
5000PCS pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Name: Concrete Pump Elbow DN180-150 PM Type

1. Specification of Concrete Pump Elbow DN180-150

     Materials: High Manganese casting mn13-4

     Concrete Pumping Capacity: about 40, 000M3

     Degree: 90°

     Standards: ASTM A128-C

Notes: total series of concrete pump elbows for different brand concrete pump(PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO Etc)available from us, including 10 degree, 15 degree, 30 degree, 45 degree, 90 degree, and other casting hopper elbows.

2.  Application of Concrete Pump Elbow

     Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery direction change.

     Our concrete pump elbows have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc

      Aiming at the largest concrete pump parts manufacturer, and reliable, professional supplier in China, we can supply concrete pump elbows, delivery pipes, casting or forging couplings, end rubber hoses, rubber pistons, tungsten wear plates, delivery cylinders, and other hydraulic parts, one stop service for your concrete pump parts and accessory business.

3.   Package and Delivery of Concrete Pump Elbow

Every 60pcs put in one seaworthy wooden box, and 20 boxes in one 20feet container.

Optional wood materials: veneer wood or other wood.

4.   Production of Concrete Pump Elbow

Our Concrete Pump Elbows are made with advanced technology of Precision Investment Casting of WAX- RELEASE, through the process of Wax Molding, Wax-release, Baking, Casting, Polishing, and Heat Treatment. Etc.

 

 concrete pump elbow package   concrete pump elbow delivery

5.  Primary Competitive Advantages

1) Brand-name Parts

2) Country of Origin

3) Competitive Price

4) Good Product Performance

5) Prompt Delivery

6) Quality Approvals

7) Good Reputation

8) Expedite Communication

9) Good Packaging

10) Distributorships Offered

11) One Step Service

12) Good Quality Service

13) Small Orders Accepted

14) Overseas Service Branches

Q: Where can a concrete mixer be used?
Construction sites, Bridges, roads and so on are indispensable
Q: What are the pros and cons of a concrete mixer?
Are you talking about the production line at the blender station or is it the usual blender or that? These I understand
Q: How long will it take for a concrete mixer to beat ten square?
The first set of 10 square is 120, and the first set of 2 squares is calculated from the above, and the time is saved by 4 minutes in 4 minutes, the average of 15 minutes is calculated by C50 high performance concrete. If it's a C20 no water reducer, just five minutes!
Q: How to safely use concrete mixer
A concrete mixer is a machine that mixes cement, gravel and water into concrete mixtures. It consists mainly of mixing, loading and unloading mechanism, water supply system, original motive, transmission mechanism, frame and supporting device. Operating procedures Before stirring, the car should be run in an empty car. Adjust the timing of the relay according to the stirring time. Water moistening the mixing bowl and the blade and the ground. The process, such as electrical or mechanical fault, should be discharged from the part of the mixing material, lighten the load, remove the fault and then drive again. When operating, the operation should be checked regularly to prevent safety accidents such as electrocution and mechanical injury. Finish the experiment, turn off the power supply, clean the mixing drum and the ground and clean up the cleaning.
Q: Concrete mixers need to be aware of which things
The concrete mixer driver must be familiar with the performance and operation of the machine, and wear the protective equipment according to the regulation. Article 2: before work should check whether the transmission clutch and brake is flexible and reliable, climbing rope fights with and without broken wires, transmission components such as the mixer of the big gear, pulley guard is in good condition, whether the motor grounding is good, confirmed rear can work. Article 3: the driver is not allowed to leave the job in the operation of the machine, and when the blender is running, it is forbidden to reach into the mixing bowl with an axe, spade or any other object. Article 4: when the hopper arises, no one shall pass or stay in the hopper. If it is necessary to check and repair, the power should be cut off, and the bucket will be held in the back of the link. Article 5: when the feeding operation is strictly prohibited, the operator will put the head into the hopper and the rack to inspect the loading condition. Article 6: if you need to go into the mixing tube for cleaning, you should disconnect the power supply, remove the fuse, and put the lock on the switch box, or be guarded by a special person.
Q: How much is the blender machine stirring
The JZC350 concrete mixer is a two-cone-shaped machine that inverts the flow mixer, which can be mixed with the plastic and semi-dry concrete of 60 mm. Stirring when the mixer is turning, and automatically when reversing. Each pot can be mixed with concrete 0.35 cubic meters. Native novel structure, advanced performance, high productivity, mixing of good quality, compact structure, low energy consumption, the advantages of convenient operation, applicable to the general construction sites, road, bridge engineering and small concrete precast construction situations such as a file. The output capacity is 350 litres The incoming capacity is 560 liters 4, productivity 10 ~ 14 m 3 / h The work cycle is 30 to 40 times per hour 6, form a complete set of power
Q: Operation procedure of concrete mixer
Before stirring, the car should be run in an empty car. Adjust the timing of the relay according to the stirring time. Water moistening the mixing bowl and the blade and the ground. The process, such as electrical or mechanical fault, should be discharged from the part of the mixing material, lighten the load, remove the fault and then drive again. When operating, the operation should be checked regularly to prevent safety accidents such as electrocution and mechanical injury. Finish the experiment, turn off the power supply, clean the mixing drum and the ground and clean up the cleaning.
Q: For example, what is the more detailed and better td-50 td-80 td-60
That's right, tipping over, tdcm125-6d Turn out the material JZC350 (rdcm350-6e, rdcm350-8eh, rdcm350-11e), JZC500, JZR750, JZR1000 Forced JS500, JS750
Q: 250 litres of the blender once made concrete
250-litre agitator is measured at a time of 0.25 m3, which is about 80% of the amount in real time, avoiding mixing and mixing
Q: What is the difference between a concrete mixer, a JL type and a JW type?
The jw-200 type mixer consists mainly of the main parts, such as the platform car, the motor, the gearbox, the feeding mechanism, the mixing mechanism and the feeding trough. After the electric start-up, the process of feeding, stirring and discharging is carried out through the transmission such as the triangle belt, the coupler and the worm gear reducer. The concrete mixer is small and suitable for underground.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords