Prestressed Concrete Roof Purline Molding Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Prestressed Concrete Roof Purline Molding Machine
1. Prestressed Concrete Roof Purline Molding Machine:
Prestressed Concrete Roof Purline Molding Machine is our special developed products as results of our engineers research, with which 60%steel material will be saved compared with traditional revolving die method .Efficiency can be improved 3 to 5 times compared with conical die method, these machine are easy for operation and convenient for maintenance, products from these machines are in good quality, smooth appearance and accurate in size.
2. Prestressed Concrete Roof Purline Molding Machine:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Provide consumers with regular visits
• Simple structure, easy operate, less wear parts
3. Prestressed Concrete Roof Purline Molding Machine Images:
4. Prestressed Concrete Roof Purline Molding Machine Specification:
Product name | Type | Productivity | Hole number |
Concrete purline machine | 60*120*140* | 1.3-1.5m/min | 4 |
Concrete purline machine | 60*130*150*4 | 1.3-1.5m/min | 4 |
Concrete purline machine | 60*140*160*4 | 1.3-1.5m/min | 4 |
Concrete purline machine | 70*150*170*2 | 1.3-1.5m/min | 2 |
Concrete purline machine | 80*160*180*2 | 1.3-1.5m/min | 2 |
Concrete purline machine | 60*110*130*4 | 1.3-1.5m/min | 4 |
Model no. | No. of holes | Dia. | No. and dia. of wires | Electric motor power(kw) | Vibrator Motor Power(kw) | Total Power (kw) | Max. span | Molding Speed(m/min) | Overall dimension (mm) | Weight (kg) |
60X120X140X4 | 1 | 30 | 5/5 | 4 | 1.5 | 5.5 | 3.5 | 1.3-1.5 | 2250×900×850 | 1000 |
60X130X150X4 | 1 | 30 | 6/5 | 4 | 1.5 | 5.5 | 4 | 1.3-1.5 | 2250×900×850 | 1000 |
70X140X160X4 | 1 | 30 | 8/5 | 4 | 1.5 | 5.5 | 4.5 | 1.3-1.5 | 2250×900×850 | 1050 |
70X150X170X2 | 1 | 30 | 8/5 | 3 | 1.5 | 4.5 | 4.7 | 1.3-1.5 | 2250×900×850 | 750 |
60X110X130X4 | 1 | 30 | 6/5 | 4 | 1.5 | 5.5 | 3.5 | 1.3-1.5 | 2250×900×850 | 950 |
Production Process
Rebar tensioning
Raw materials preparing
Molding
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• What kind of machine do you have?
Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component.
7. Why choose us:
• 30 years manufacturing experience.
• Constitutor of the
• More than 10 patents.
• Passed ISO9001:2000 quality system certificate.
• More than 10 types of machine and over 100 models for choose.
• Supply complete set of technology and equipment solution.
• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.
8. Our Service:
• We supply the technical supporting all the time.
• We supply one year warranty for whole machine.
• We supply free quick wear parts.
• We supply low charge continue maintenance when warranty is expired.
• We supply free training to end-users
- Q:what is the quality of a central machinery 39743?
- MINI MULTIPURPOSE MACHINE , I'd guess you'll get what you pay for, i.e.. not much. I'd imaging that within it's limited capacity is might be an adequate (depending on ones requirements) lathe, but milling capacity will be quite limited.
- Q:Material processing technology and machinery manufacturing What is the relationship
- Process: In the production process, where the direct change in the size of the object, shape, nature (physical properties, chemical properties, mechanical properties) and the relative position of the process, collectively referred to as the process. Such as rough manufacturing, machining, heat treatment, surface treatment and assembly, it is the main process of production, other processes known as the auxiliary process. Mechanical processing process: the mechanical processing methods, directly change the rough shape, size and surface quality, making it a product part of the process known as the mechanical processing process.
- Q:please help.
- look in here images.google.ca/images?hl=ensou... and here www.google.ca/search?hl=ensource... Guru
- Q:What is the processing of materials?
- The workability of the material means that the material exhibits excellent flow characteristics not only during injection molding but also excellent mechanical properties (strength, toughness and stiffness), short molding cycle (high productivity) and high temperature resistance (
- Q:Payback: Quebec, Inc., is purchasing machinery at a cost of $3,768,966. The company expects, as a result, cash flows of $979,225, $1,158,886, and $1,881,497 over the next three years. What is the payback period?
- Plugging okorder /
- Q:would you be able to give reasons
- the general consensus is that the type of financing should match the lifespan of whatever you're buying. so for heavy machinery, these are typically long-term assets. as such, you want to use long-term debt (such as a long-term bank loan). ideally, the best financing is cash (you buy it outright). other alternatives would be to give the seller a corporate bond which promises them payments, etc. loan agreements are another option.
- Q:what do companies benefit from when upgrading machinery?
- Depends what you mean by upgrading. A business can upgrade existing machinery to perform faster, better, etc or they can purchase a new machine to replace an older one. With upgrading the business is looking at increasing output, reducing operating costs and improving the efficiency of the machine. A new machine will potentially return less downtime due to breakdowns, but may have teething troubles whilst it settles in. New machinery will have costs involved, not only the purchase cost, but cost of spares, cost of training to operate and maintain, and depreciation. Hope this helps
- Q:I am going to be an interveiwer interveiwing either a Boatswain Mate or a Machinery Technician. I need links to websites with information about these types of people and their jobs because I need some information. Thank you.
- Boatswain okorder
- Q:Details of Plant Machinery for Essential oil from medicines?
- Here okorder /
- Q:Looking at their lists of duties, it seems MR's are machinists, and MM's repair machines/pipes, etc.
- MR What they do The duties performed by MRs include: ? repairing and operating auxiliary machinery; ? calculating time and material needed for machine shop work and the repairing of auxiliary machinery; ? drawing sketches and preparing specifications for replacement parts; ? working from sketches and specifications to produce replacement parts; ? operating machine shop equipment, such as lathes, drill presses, shapers, bench grinders, milling machines, boring mills, power hacksaws and computer numerically controlled machinery; ? working with precision measuring instruments such as micrometers, depth gauges, verniers, calipers, gauge blocks, protractors and dial indicators; ? engraving metal and other materials; ? performing electroplating and flame spraying operations. --------------------------------------... MM What They Do The duties performed by MMs include: ? aligning piping systems for oil, water, air and steam, and controlling the operation of ship boilers and steam turbines used for ship propulsion and service systems; ? controlling operation of turbo generators used to produce electrical power; ? cleaning, adjusting, testing and performing other preventive maintenance on a ship's boilers, main engines, turbo generators and other auxiliary machinery including steering engines, elevators, winches, pumps and associated valves; ? operating and maintaining desalinization plants (distilling plants) to make fresh water from sea water; ? maintaining refrigeration plants, air conditioning systems and galley equipment; ? repairing or replacing valves, pumps, heat exchangers, compressors, steam turbines and hydraulic or pneumatic control devices; ? making entries in and analyzing machinery operating records and reports. --------------------------------------... You should be able to see the difference in primary duties.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Prestressed Concrete Roof Purline Molding Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords