Power Stacker-CG20 series Controlled by MOS
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
![]() | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Economic, easy 1kg=2.2lb 1ICH=25.4MM
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Related Products |
- Q: The hydraulic platform is compared with the normal lift platform
- Light weight, good maneuverability, suitable for one-man operation. The special mast strap-roller device, which is stable and stable.
- Q: How does a button in the PLC control the elevating platform
- The recommended answer is wrong, and the platform should stop at any location. You can either push the button or click the number of times to tell whether it's up or down. For example, press the ascent in one second, press two, and press the button to stop. Instructions will use timers, counters, and pulse detection. You get the idea.
- Q: What can be done when the hydraulic platform is down?
- The left and right sides are connected by wire rope, while the other side is synchronized.
- Q: When the hydraulic platform drops, it feels very shaken and unbalanced. Please answer?
- Connected to the solenoid valve is the control valve core, if it is to be repaired. To change oil, you need to lift it up to the top, and then use the safety support frame or stick to support it so that you can do what you want
- Q: How do I design this hydraulic lift?
- We recommend jinan tianfeng hydraulic efficiency, professional production of hydraulic lift and lift platform, which can be custom-designed according to customers' needs. The product is of good quality and reasonable price. Good after-sales service is guaranteed!
- Q: How do you remove the horizontal universal elevator milling cutter
- Tie rod and the threaded part of the milling cutter is too short, removing cutter bar back a loose, threaded connections even fewer number of buttons, easily when tapping threads dozen hair, and make the cutter not screw down, or make the damage of tie rod.
- Q: Can the stepping motor drive the hydraulic platform?
- Are you a driver for this motor? But the normal step motor is only for torque, step Angle, phase number, not for rotational speed; It may be a servo motor or torque motor, and if the speed is low it is the possibility of torque motors. In addition, you can measure the current, voltage or waveform below.
- Q: How does the elevator repair
- For elevator maintenance the simplest way is to find the manufacturer directly to repair, after all, is their production, repair is good, also save time, our factory is the jinan day machinery, bought two or three years, rarely out of order, maintenance in time, high efficiency, under the baidu search them, you ask yourself, see how.
- Q: The advantages and disadvantages of using diesel engine as an engine
- The fuel consumption is significantly lower than the steam engine power plant. Economical and practical, diesel fuel is low in the same kind of fuel, so it is easy to accept.
- Q: What is the imported hydraulic platform car? Kneel and beg your help
- Why buy the importation, the price is expensive not to say, the quality is not same good to go where. There is also a bad reputation in China, like we are using the sea god's platform
Send your message to us
Power Stacker-CG20 series Controlled by MOS
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords