Self-propelled Scissor Lift
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 4 Sets m.t.
- Supply Capability:
- 30 Sets Per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Details of GTJZ scissor lifts
It is a type of platform that can usually only move vertically. The mechanism to achieve this is the use of linked, folding supports in a
criss-cross "X" pattern, known as a pantograph (or scissor mechanism). The upward motion is achieved by the application of
pressure to the outside of the lowest set of supports, elongating the crossing pattern, and propelling the work platform vertically. The
platform may also have an extending "bridge" to allow closer access to the work area, because of the inherent limits of vertical-only
movement.
SPECIFICATION OF SCISSOR LIFT:
Scissor Lift Max. platform height(m): 6.2 /8.2/ 10
Scissor Lift Max working height(m): 8 /10/ 11.8
Scissor Lift Iverakk dumensions(m): 2.1*0.9*2.2 /2.1*1.1*2.4 / 2.6*1.3*2.4
Scissor Lift Plarform dimension(m): 2.1*0.9*2.2 /2.1*0.9*2.4 /2.6*1.2*2.4
Scissor Lift Platforn extension(m): 0.6 /0.6 /0.8
Lifing capacity(kg): 250/ 250/ 250
Extension capacity(kg): 100/100/100
Traving speed(km/h):3.6/2.88/3.24
Traving sspeed(km/h)0.7/0.7/0.7
Gradeability(%) 10.5 /10.5/ 10.5
Scissor Lift Machine weight(kg):1500/1820/2200
Scissor Lift Ground clearance(mm):60
Scissor Lift Battery4~6V-245AH
Scissor Lift Controls: Electrical
Fetaures of GTJZ scissor lifts
It can travel at slow speed and rapid speed self propelled. Only one person is needed to lower, raise, forward,
backward, steer the machine. It improves working efficiency and reduces man-power and labor intensity greatly. It is especially good
for long time work at airport terminals, stations, docks, shopping market, stadiums and work shops.
- Q: How much is the 8 square meter tatami mat
- Wants to see you with what kind of wood, to make what kind of structure, whether or not to do lifting platform, finally, custom matching straw mat, ranging from several thousand to tens of thousands of, I will ask carpenter in my attic made a simple platform of more than 20 cm from the ground to add a row of little cupboard (pictured)
- Q: The ball of the universal milling and lifting platform rolls off, how to install,
- Remove the screw and remove the poles, bearings, and bearings. Find a root (casing pipe diameter and the bottom of the screw thread diameter size, casing Canon and screw axis diameter size), the sleeves on the screw axis, the screw nut screw on the casing; When fully rotating to the casing, remove the casing and the screw nut. Slide to one end of the casing and the screw nut expose about half a circle ball nut (must pay attention to, don't put the ball, or ball will all fall out), with tiny rod or wire, adjust the position of the ball, with one or more of the position of the ball, then fill in falling ball (this step is very important, it is better to have a ball screw pair assembly experience to do); Once you have finished, put the casing on the shaft of the screw. Then turn the nut onto the screw.
- Q: The design of graduation is designed for mobile shearing and hydraulic lift
- Has offices in the major cities, buy convenient, jinan Long Hao hydraulic machinery is the main production: elevator, lift platform, lift platform, elevator, cllimbing trolley, hydraulic lift, hydraulic lift platform, hydraulic lifting platform, hydraulic lifts, hydraulic dock leveler, imobile elevator, stationary lift platform, fixed lifts, fixed lifts, stationary dock leveler, mobile lift, lift platform, lift platform, portable lifts, mobile cllimbing trolley, goods elevator, cargo-lifts, hydraulic cargo-lifts, stationary cargo-lifts
- Q: What certificate is required to operate hydraulic platform
- The operation hydraulic platform, under 500 kg, does not require a certificate, more than 500kg can use the production manufacturer's safety production license.
- Q: How does the elevator repair
- For elevator maintenance the simplest way is to find the manufacturer directly to repair, after all, is their production, repair is good, also save time, our factory is the jinan day machinery, bought two or three years, rarely out of order, maintenance in time, high efficiency, under the baidu search them, you ask yourself, see how.
- Q: How to maintain the platform?
- Remove the hydraulic oil and remove the oil strainer, remove the oil strainer, clean it up, and then put it back in the tank and connect the pipe. (put on new oil and don't use the old oil. Otherwise, the moving parts of the hydraulic lift system will accelerate the wear and tear.) Remove and disconnect the lift valve, blow the plunger down with compressed air, then load and resettle. Check all hydraulic pipes and connectors. The pipe should not be broken, the joints should not be loose, and all the joints must be tightened.
- Q: The purpose of the rail elevator
- The product structure is strong, the load is large, the lift is stable, the installation maintenance is simple and convenient, is the economical and practical low floor space to replace the elevator's ideal cargo transport equipment. According to the installation environment and use requirements of lifting platform, choose different optional configuration, can achieve better effect, the use of this product is mainly used in chemical, high temperature and high pressure, power plant, the nuclear industry base, such as explosive explosion protection enterprise.
- Q: Is there a replacement for similar elevating functions?
- Hydraulic system can be used in place of, jack up the operation is convenient, stable, more accurate, simple, a qualified fitter or cold working without much time can make the equipment (can consider to the flea market find some old equipment to assembly).
- Q: The automatic mahjong machine has a lift station always one. What is the other three normal
- There are two main reasons for this: In the ascent of the aluminum plate, the interference with the limit mechanism
- Q: What is the imported hydraulic platform car? Kneel and beg your help
- Wide operating platform and high load-carrying capacity, make high-altitude operation more widely available, and suitable for many simultaneous operation. You can ask.
Send your message to us
Self-propelled Scissor Lift
- Loading Port:
- China Main Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 4 Sets m.t.
- Supply Capability:
- 30 Sets Per Month m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords