Polyester Tape PET

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000kgs kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Application: Also called mylar tape, it is widely used for the wrapping and insulation of communication cable, power cable, coaxial cable and other special cables.

Technical Properties:

Thickness
(μm)

Tensile Strength
(Mpa)

Elongation
(%)

Shrinkage
(150
, 30min)
%

Melt point
(
)

Haze
%

MD

TD

MD

TD

MD

TD

12

170

170

40-130

40-130

3.5

1.0

250

2-4

15

19

23

25

30

36

38

50

75

Values shown are for references only. For more accurate figures, please ask for technical data sheets.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Now the market professional installation monitoring the construction team how much money a point? , As well as cable patch panels and telephone patch panels how much money a point? Is it distance?
Directly to find Dell customer service bar, the general warranty period are free replacement, unless the insurance of the. You can extend the warranty period, it seems you like to do the experiment.
Q:Building decoration wiring pipe elbow with yellow wax tube can you?
Reply 3 # shops always have the door, and the door must be adjacent to the outdoor channel. Outdoor channel is public space! So the shop should be able to find the wiring channel. You have not encountered the situation, the map stickers out to see it?
Q:Is the toilet wire walk on the ground? Are there any hidden dangers?
At the same time, security monitoring line itself is a weak line
Q:The computer can not open the machine display frequency beyond the scope of the mouse and keyboard do not start can not press F8 how to do
According to the "Power Engineering Cable Design Code" GB-. 5.3.3 only asked for the depth of the cable buried directly: drop the blue skin to the ground depth, not less than 0.7 meters; when located in the roadway or farmland Under the appropriate should be deepened, and should not be less than 1.0 meters. 5.4.3 protected pipe buried in the ground, should meet the requirements under the depth of the pressure and environmental corrosion resistance. Through the uneven settlement of the backfill section and other places to increase the force, it is appropriate to use steel. Another direct burial should be selected armor type.
Q:When pouring concrete is how to put the tube
Line pipe is poured before the concrete is laid on the cloth, fixed on the template or steel, pouring a need to install a class at any time to adjust its position!
Q:Wire printed on the word what way to erase
If you need an unqualified wire, you can contact this part
Q:What kind of KVM switch is this configuration below?
A 32 kvm, Taobao the lowest price, more than 4000 yuan, plus 30 control lines 30 * 20 = 600 yuan, if there is no control side of the mouse and mouse, need to add a thousand dollars. A total of about 6 thousand dollars. Two KVM cascade, .000 yuan * 2 = 2000 yuan, 620 yuan control line, the mouse was a thousand dollars, a total of nearly four thousand dollars. But the stability of multiple cascade is better than a single good.
Q:Fiber optic cable split box, integrated wiring box, cable terminal box, cable transfer box difference
Outdoor fire line must use fire-resistant KVV cable, wear pipe protection.
Q:Wire and cable CCC product consistency is what
What brand of wire pipe PVC pipe used? Is not in the financial or plastic surgery better ah? Guiqiu we recommend, thank you! What brand of network cable used a good, need double shielded cable, thank you
Q:A five-hole dual-socket how to connect the wiring, the electrician line to go three lines, the switch can use a single socket did not take their own hands
Bookstore tool book should have "communication project budget", I do is what you say, the budget is divided into estimates and budget, is two steps. So that is not very clear. But what is needed is the preliminary design of the project. The budget is needed for design and drawings. Internal management of this piece, the main thing is that you need to do what the project department, and are generally very complicated

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range