PC Cover LED Bulb Aluminum
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 50 Pcs pc
- Supply Capability:
- 100000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Very long lifespan, LED light bulbs offer a simple way to save money and beautify your home, No UV and IR radiation minimizing discoloration and fading of materials. We promise 2-year-warranty for all the bulbs we manufacture.
Material | Aluminium and PC |
Voltage | AC 85-265V |
Base | E27 |
Operating Frequency | 50-60Hz |
Power | 18w |
Beam Angle | 180 degress |
Color Rendering Index (CRI) | >80Ra |
Correlated Color Temperature | 2000-3500K,4000-5000K,5500-6500K |
Color | Warm White/Natural White/Cool White |
Surface Color | Milky White/ Frosted/ Clear |
Lamp Luminous Efficiency | 80-90lm/w |
Operational Environment | -20°C to +55°C |
Life Span | 20,000hrs |
Certification | CE,ROHS |
Features
1. SMD LED solution, excellent heat dissipation performance.
2. Energy saving perfect replacement for incandescent bulb and CFL, low Energy Consumption.
3. High luminous efficiency as high as 90-110lm/w.
4. Wide working voltage AC85-265V.
5. Particularly designed constant current driver for open or short-circuit protection.
6. Green, No UV and IR Radiation.
7. Environment friendly, no mercury, lead or hazardous materials.
8. Easy to install, E27 or E26 available.
9. Anti-Vibration, convenient for transportation.
10. Certificate: CE, RoHS.
11. Warranty period: 2 years.
Usage/Applications
1. Widely used to replace traditional incandescent bulb, fluorescent light and CFL.
2. Suitable for shopping mall, hotel, restaurant, museums, art galleries, cosmetic counters, show window etc.
Customized options
Customized label/ Logo can be made onto Product and Retail Package.
Packing & Delivery
Package:
1 x Bulb
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory
- Q:Is there any flicker in the LED bulb?
- First of all, I want to know what kind of LED bulb you bought. Is the LED light source small power or high power?Now on the market LED products, copycat too much, but also a lot of difference between quality and price, because the power output strobe filtering problem. Because the lowest requirements so the power design is very simple, such as shell is small power ball type PVC foam, with isolated power so far I saw several, but the price is very high, and most with the rectifier bridge, several rectifier diode, a capacitor, resistor several complete, low prices. High power type bulb is similar, but the power will be much better, is the constant current source in the output current of the filter is also doing well, there the strobe is low! Finally, the stroboscopic problem is on the power supply, and the power point difference is higher than one or two!!
- Q:LED bulb lamp. Is there a good drive or no drive? Is the lamp of good or integrated?
- The cost is too high, the latter is better than the former, with long service life, there is a need bulb welcome to Taobao fry and sales of professional manufacturers of high power LED lighting lamp.
- Q:How did the trademark on the LED bulb go up?
- And the use of silk screen or pad printing, this is the need for the corresponding ink, this solution with a dedicated solution can be dissolved, and also have some prominent hand touch.
- Q:Is it possible to manually weld LED bulb bulbs?
- As long as the welding technology clearance is possible or OK
- Q:LED what is the glue between the aluminum base of the bulb and the cooling aluminum?
- A lot of sticky glue can live it yourself have not tried to guess 502 good brothers of this kind of glue can be, but do not know good heat resistance and high power LED heat is still very large, if you are a small power never mind
- Q:LED how does the bulb return electricity?
- What is reflow? Never heard of it. I am a lighting technician
- Q:What are the requirements of the LED series inspection specification for bulb bulbs?
- The temperature rise of the finished lamp is not more than 120K. The temperature rise is equivalent to the maximum value of 60W incandescent lamp.
- Q:What are the types of LED bulb?
- According to the interface, the LED bulb has GU10, E14, E27, E40 and so on.
- Q:LED bulb PC, will the white cover affect the color temperature of the finished lamp?
- Our company is doing LED lamps, about the color temperature has indeed been deviation, we call this phenomenon called drift. But there will be no 6000K drift, and there are two possibilities for you
- Q:What does "A19" mean in LED A19 bulb?
- A19 is the European A60: represents the outer diameter 60mm=19/8*25.4=60.325mm, such as the diameter of the A19 bulb. "D=19*1/8", multiplied by 25.4, is the diameter of the bulb in mm units. The source of this formula is the same as the T8 tube: "X" in Tx means that the diameter of the tube is x times 1/8 inches, so the diameter of T8 is 1/8 inches x 8=1 inches, or 25.4mm
1. Manufacturer Overview |
|
---|---|
Location | Shenzhen,China |
Year Established | 2011 |
Annual Output Value | |
Main Markets | Mid East;Western Europe |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shenzhen |
Export Percentage | |
No.of Employees in Trade Department | 20 People |
Language Spoken: | Chinese |
b)Factory Information | |
Factory Size: | Above 4,000 square meters |
No. of Production Lines | About 6 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Cheap |
Send your message to us
PC Cover LED Bulb Aluminum
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 50 Pcs pc
- Supply Capability:
- 100000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords