passanger elevator parts low cost load cell EWD-H-XJ3

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Passanger  elevator parts load cell
EWD-H-XJ3 Elevator Load Weighing Device

INTRODTION MANUAL

l This system is applicable to all elevators with movable platform car (containing 3-channel programmable switch signals)

l Main characters:

1. Contactless inductive working mode, With no mechanical movement,no need to fix the original position of elevator overload switch, and to change structure of elevator platform car.

2. Electrical properties is in compliance with the standard of the International Electro-technical Commission.

3. Set up all parameters on the spot.

4. Adopt strong inductive magnet, improve the anti-interference ability to the utmost.

5. System carry scientifical computing out according to mathematical equations to automatically amend detention of error. It also has no-load auto zero capacity.

6. It is totally convenient to adjust on the pot by means of artificial self-study or artificial displacement.

7. Signal created by ourself control method of programmable output signal created by ourself is applicable to all kinds of traction elevator with movable platform car.

8. Integrated structure design: small size, easy installation.

l Technical index

1

Scope of application

Applicable to all elevators with movable platform car. range of auto-detention (2.0mm ≤car bottom displacement≤10.00mm ); range of manual set displacement: 2.5~9.9mm ( relate to parameter PD)

2

sensitivity

Rated load /200 (5.0kg when rated load is 1 ton)

3

System error

≤1.5% ( 5~40℃ )

Working temperature range≤3.0%

4

nonlinearity

≤1.0%

5

Output form

Solid state relay

Programmable universal signal

① 3 channel programmable output mode are following: no- load, light- load, semi-load, heavy load, rated load and overload (user can freely set up the range of change.

② Each channel can be programmed as dynamic close or dynamic break contact.

③ Contact capacity: DC/AC 32V/15mA

6

Storage environment

-25~75℃

7

Working environment

Temperature:-20~55℃

8

Relative humidity

20%~99%RH

9

Reaction time

≤0.25s

10

Power supply

AC/DC2410%V/150mA

11

Installation position

movable platform car of elevator

12

Machine dimension

45X45X903

l Product appearance, internal structure and interface specifications

EWD-H-XJ3

appearance

External interface

interface specifications

P1

Com

Sharing Com

J1J2J3,3 channels Solid state relay output

P2

J1

P3

J2

P4

J3

P5

System power supplyDC/AC24V(±10%)150mA

absolutely can't put this device "P5, P6" outside of the directly connected to external power supply output port, thus may cause permanent damage shall not be responsible for the company

P6

1. J1J3/J4/J5 internal solid state relay, Maximum load capacityDC/AC 32V/50mA

2. Output signal programmable for "light ~ overload", to participate in the elevator control logic

l Machine dimension and installation schematic diagram

Outlook dimension installation schematic diagram

Installation Instruction

1. As near to install this device in the bottom or the elevator the overload switch location, near the center of the system should be installed on the bearing beam of the elevator to the bottom, induction magnet adsorption in the bottom, and the marking surface of weighing device sensing point;

2. System bracket should be made on the basis of the condition of the elevator, but must use the not easy to deformation material, the better of the thickness is more than 4 mm or with stiffener, to prevent sway;

3. Adjust the device, make the bottom magnet aimed at center of end surface. At the same time must ensure that the device end face and the magnet end face parallel to each other.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         

Installation method

If you need details, please send us for this product "user manual".


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How large a leakage protector is used for the construction elevator
The leakage current is less than 30 milliamps The short circuit current is typically 1.2 to 1.5 times the rated current If the motor is rated at 10, it is usually used with a 125-15 leakage protector
Q:What is the main function of the construction elevator safety guard
For safety device of construction hoist main effect is in the process of elevator used in times of emergency power, hit the brakes, let hoisting cage security attached on the guide rail frame, prevent the hoisting cage falling!
Q:How to set up the construction elevator?
In the construction preparation stage, must first be familiar with the steel stair construction drawing and construction drawings of embedded object, combined with the site construction conditions, to understand the distribution of the embedded parts of this project, form, and according to the construction characteristics of the project construction scheme of embedded object, technical disclosure, etc.
Q:Can construction elevators be taken by people or by goods
The construction elevator can be taken either by person or by cargo Material hoist (dragon door frame, well frame) can be carried only, not by person
Q:The construction elevator can not operate during the use of several stages of wind power
Well, there are no definite rules. It's up to you to decide whether to use it or not
Q:How many floors do you need to install a construction elevator?
In this case, you do not need to install the construction elevator at the main stage. After the main body is finished, install the tower crane, reinstall, mainly for decorate the vertical transport of the stage.
Q:6 layer of brick and concrete construction project, have tower crane still need construction elevator?
Tower crane is used for heavy lifting, long pieces, small machinery and materials must be used in the construction elevator.
Q:How many floors are built to use the construction elevator? With six floors?
The country stipulates above 7 floor to be installed elevator, of course 7 below can be installed not outfit, average 7 floor below is a ladder of ladder of ladder of ladder of ladder of ladder of ladder of ladder of ladder of stairs and so on
Q:What is the safety device for construction elevator?
Fence threshold position, threshold position, both inside and outside ladder ladder cage cage up and down limit, limit switch, for safety device, weight limiter and ladder to the top of cage outside the door stop, on the abrupt stop switch. The highest point is a toothless standard day. There are elevators and ultra high sensing switches.
Q:Is the construction elevator a special equipment
The construction elevator is special equipment, the installation and demolition of the special construction plan, after the installation, the special equipment can be tested and qualified for use

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range