• One Ton Capacity Building Hoist System 1
  • One Ton Capacity Building Hoist System 2
One Ton Capacity Building Hoist

One Ton Capacity Building Hoist

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
40 units unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Building hoist
1, Two cage
2, maximum capacity:1Ton/cage
3, Middle speed:0-60m/min
4, Main part welded by robot

The Construction Hoist is set up with frequency conversion and twin cages. Every cage has two suits of independent driving mechanism.With the technology of frequency conversion the construction hoist driven by rack and pinion can speed up and slow down steadily. It has features such as:
1. Starting and braking are steady with no impact.
2. The lifting speed can be controlled.
3. Starting current is lower than rated current.
4. The mechanical wear and tear is reduced evidently.
5. Power saves efficiently.

The main technical parameters of SC100/100 construction hoist ate listed as follows:

1. Lifting capacity: 2x1000kg

2. Lifting Speed: 33m/min  or 60m/min with frequency inverter(Toshiba)

3. Rated Power: 2-2x11kw  or 2-2x15kw

4. Mast Section Size: 650x650x1508mm, double rack,  Painted or Galvanized optional

5. Delivery time: 20-25 days.


We can provide tailored design, backing on the strong technical strength of China Academy of Building Research.

Construction lift with Interver:

CharacteristicsModelRated LoadingLifting SpeedMotor Power
 
 
Double Cabin
 
 
Low-speed
SC200/200D 2 × 2000kg0-36m/min2 × (3 × 11kw)  2 × (2 × 13kw)
2 ×(2 × 15kw)   
SC100/100D 2 × 1000kg0-36m/min2 × (2 × 11kw)
 
Mid-speed
SC200/200Z 2 × 2000kg0-60m/min2 × (3 × 15kw)
SC100/100Z 2 × 1000kg0-60m/min2 × (2 × 15kw)
 
Single 
Cabin
 
Low-speed
SC200D    2000kg0-36m/min3 × 11kw
2× 13kw
2× 15kw
SC100D    1000kg0-36m/min2 × 11kw
 
Mid-speed
SC200Z    2000kg0-60m/min3× 15kw
SC100Z    1000kg0-60m/min2 × 15kw




Q:The safety officer shall be responsible for the work of the construction elevator
Certificate of factory, whether the elevator is inspected by the competent authority, the operator has the evidence. Conduct safety techniques for operators.
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:The construction of more than many floors must be used for construction elevators
The construction elevator, the average layer height above 12 floors need to be used, the hoist machine is not to go up to use the construction elevator to send a person to carry a few light things upstairs. Pre-installation preparation: After construction, the manufacturer will show the product certificate and provide the instruction manual. According to the technical requirement of installation safety technology checking list according to the construction elevator, the preparation should be inspected. The installation operator should hold the certificate, accept the technical, safety, etc., and make the safety operation rules for the construction lifter. 3, work environment: 1) the power supply must meet the requirement of power supply. 2) no electricity, gas welding or other obstacles to the operation of the crane are prohibited within the part of the elevator installations. 3) the platforms and channels that enter the building from the suspended cage shall reach the bearing capacity of more than two tons, and have strong protective barriers and protective doors. 4) it is forbidden to use guide rack, attached part scaffold, construction platform and the floor channel stretch, pipeline, rope, rope, banners, flags and other things has nothing to do with the elevator; In the evening homework, there should be sufficient illumination. 6) the doors to the floor will be kept in the door, each with a clear sign of the floor number.
Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
There are no rules for the distance between tower crane and construction elevator, but note the following points: (1) the foundation of the tower crane and the construction elevator cannot affect each other; (2) the construction elevator shall not be higher than the tower crane. (3) the location of the elevator shall not be blocked by the position of the construction elevator; (4) the use of the same circuit and the same distribution box with the construction elevator shall not be used by the tower crane. The distance between the tower crane and the construction elevator can be anywhere, as long as the above aspects are met.
Q:There are differences between the construction elevator and the construction elevator
Construction lifter and building construction elevator, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction lifter is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. There are many kinds of elevators in construction, there are no two kinds of weights and weights in the way of operation, and they are controlled by manual control and automatic control. You can also add inverter and PLC control modules as needed, and also add floor calling devices to the peace layer.
Q:Should a fire extinguisher be equipped in the construction elevator?
The dual-purpose construction elevator should be needed
Q:What is the meaning of double straps in the construction elevator?
One component of the elevator's drag system is the weight of the car. The other side of the car is connected to the top of the car by dragging a wire rope. It can be used for the energy saving of the elevator towing system, because the elevator load optimization is calculated by the theory calculation. The elevator should be calculated before the weight is weighed: the calculation principle is that the weight is equal to the weight of the car and half the load.
Q:Is the construction elevator the same as the construction elevator
The construction elevator is the standard name, there are national standards, including the elevator, the people's elevator, the construction elevator is the popular term, the general point is the people's elevator not including the elevator.
Q:The construction elevator always jumps
The starting current is more than three times the running current, and your air switch is low in the maximum current
Q:What are the requirements for the construction elevator
Actually good or bad for safety device can only judge by test and inspection in the daily operation is not sure whether it is good or bad, for those who are serving for safety device, or advice for the earlier inspection and regular test, only accomplish know fairly well, to malignant accident prevention rather than cure.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords