• Lorry Loading Crane Truck Hiab Remoto Control Crane System 1
  • Lorry Loading Crane Truck Hiab Remoto Control Crane System 2
Lorry Loading Crane Truck Hiab Remoto Control Crane

Lorry Loading Crane Truck Hiab Remoto Control Crane

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

  • Feature: Truck Crane

  • Application: construction building/factory lifting/transport/ship yard

  • Rated Loading Capacity: 14000kgs

  • Rated Lifting Moment: 35t.m

  • Max. Lifting Load: 14000kgs

  • Max. Lifting Height: 18m

  • Span: 6m

  • Place of Origin: China (Mainland)

  • Model Number: SQ1404
  • Certification: TX/CCC

  • Warranty: one year

  • color: red/yellow/white/blue

Packaging & Delivery

Packaging Details:neutral packing/container ship /ro-ro ship
Delivery Detail:5-15days

Specifications

1,Operating by Control Remoto
2,The origin, quality assurance
3,High quality after sale service
4,Professional

Main Specification For Crane14 TON

Max.Flow of Hydraulic System

80 L/min

Rated Pressure of Hydraulic System

23 Mpa

Max.Lifting Capacity

14 T

Max.Lifting Moment

35 T.M

Max.Working Radius

15 M

Max.Lifting Height

18(m)

Derricking Scope

1-76 °

Slewing Angle

360°continuous

Number of Booms

Sections

Outrigger Span

(m)

Oil Tank Capacity

200 L

Installation Space

1300 mm

 

Technical Parameter of Dongfeng Brand DFD5251JSQ Truck mounted Crane

VEHICLE BRAND

DONGFENG

VEHICLE NAME

TRUCK MOUNTED CRANE

VEHICLE MODEL

DFD5251JSQ

VEHICLE 

MANUFACTURER

DONGFENG MOTOR CO.,LTD

ENGINE MODEL

B190 33,B210 33

ENGINE 

MANUFACTURER

CUMMINS

DISPLACEMENT

5900,5900

POWER

140,155

OVERALL SIZE(MM)

11950×2490×3800

INNER(MM)

8300,8500,7500×2294×550

TOTAL MASS(Kg)

24900

FRONT PASSENGER

3

CURB WEIGHT(kg)

12200,11800

RATED LOAD(kg)

12505,12905

APPROACH/

DEPARTURE

34/11,34/12

FRONT/REAR 

SUSPENSION

1250/3500,1250/3150

AXLE BASE(mm)

2150+5050

AXLE LOAD

6850/6850/11200

AXLE NO.

3

SPRING NO.

10/10/12+9

TIRE NO.

8

TIRE MODEL

10.00R20

FRONT WHEEL BASE

1940/1940

REAL WHEEL BASE

1860

STEERING MODE

STEERING WHEEL

MAX.TRAVEL 

SPEED

90

ID

LGHXLG3X×××××××××

STANDARD

GB3847-2005,GB17691-2005 CHINAⅢ

CHASSIS MODEL

DFD1250GJ3

Q: Reader is on unimproved private road half fuel load distant from nearest known public assistance in outdoor recreationvehicle presently owned. For whatever reason the enginecannot be made to operate. Dead zone prevents cel' CB.To signal distant passer-by what are your resources? Whatare symbols that denote specific problems for aircraft fly-by?
hi there S O S, in a clearing close to your car made from bright clothing or logs around 5 feet in height, a signal mirror,or flash light, SOS is dot,dot dot dash dash dash dot dot dot. a smokey fire to direct overhead rescue, to your position. good luck.
Q: some brand name!
I have an excellent name for your exibition. Its : PRINT AN ERA or PRINT AN AGE............
Q: Have u seen - friends machineries?
What's that? Please update me also on this.
Q: Which of the following is considered to be capital (physical)?
Machinery. Physical capital is any form of wealth capable of being employed in the production of more wealth. Hence, machinery makes more of a product you can sell and make money.
Q: what is dna replication machinery?
Well, this isn't really about machinery, but it shows you how to replicate dna, and even mix it with another person. Steps: 1- Meet a girl (if man) or meet a boy (if girl). 2- Begin a relationship with him/her. 3- Marry (or not) and then have the very commonly used technique called sex. 4- You will have to wait around 9 months, and the mix of the two DNA's will be finished. Hope this helped you dude.
Q: What is a situation you have been involved in or someone you know has been involved in where better safety procedures would have prevented an injury. What safety procedures you believe should of been provided to prevent the injury and how they would have prevented the injury.Any stories?
I knew a young welder who went blind the first day on the job because he failed to wear safety glasses.
Q: Cost of construction machinery use fee
Repairs: refers to construction machinery in accordance with the provisions of the repair interval shift necessary repair, to restore the normal function of the cost. Shift repairs (= a repairs overhaul X times) the total number of classes often 83019 durable repairs: refers to all levels of construction machinery repair maintenance in addition to outside and temporary troubleshooting costs.
Q: I would like to start building some home projects and do small crafts, maybe work on some small furniture projects. I would like this to last me a long time.
delta machinery 10 lefttilt contractor table model 36979 good give details
Q: How do the fixed assets in accounting distinguish between (machinery and other production equipment) and equipment (tools and tools) related to production and operation activities?
Do the partial production equipment, office equipment and vehicles, what can be put in, for those Mo Ling ambiguous, you can ask the leader of the unit, to shorten the time of tax depreciation, depreciation long bullish to profit
Q: I got my wisdom teeth (all 4) cut out this weekend and am still on loritabs every 4-6 hours for pain. Today is supposed to be the last day of my two weeks notice ( I am switching jobs next week ) But I'm on pain pills and shouldn't be opperating factory machinery which is what I do. Would it be bad for me to call in on my last day? I still have to go in Wednesday to get my paycheck but right now I can't even drive much less operate complictaed machinery. If I called in would that make me look bad? My employer knows I got my wisdom teeth cut out this weekend.
Since your employer knows you had the surgery, you can bring it a note if it really matters. What I would do, if possible, is try to find a replacement so that they won't be left shorthanded, that way the employer knows you at least tried. If you were a good employee the whole time you worked there, then not coming on the last day (for a legitimate and verifiable reason) shouldn't be an issue.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords