Italian Type Drop Forged Scaffolding Fixed Coupler/Double Clamp

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Standard: EN74-1:2005/BS1139/AS1576.2-2009 Grade: 8.8 Nut: 21mm
Type: Italian Type Weight: 1.35kg/pc Size: 48.3*48.3
T-Bolt: M12-78mm

Product Description:

US Type Drop Forged Scaffolding Fixed Coupler/Double Clamp


1. Product Detail:

Size

48.3*48.3mm

Weight1.35kg/pc
T-BoltM12-78mm
Nut21mm
SurfaceElectro-galvanized/HDG


2. Company Introduction

        We are a professional manufacturer of scaffolding couplers and scaffolding accessores, there are 4 forging lines in our workshop and we have our own mould machines and technicians , could meet different requests from clients. OEM also available.  All our products are made according to international standard EN74-1:2005/BS1139 and AS1576.2-2009 and we own the test machine in our factory to control the quality.

        Welcome to our factory anytime you want.


Factory View:

Italian Type Drop Forged Scaffolding Fixed Coupler/Double Clamp


Italian Type Drop Forged Scaffolding Fixed Coupler/Double Clamp


Product Details:

A. BS Type Double Coupler and Swivel Coupler 

B. German Type Double Coupler and Swivel Coupler 

C. US Type Double Coupler and Swivel Coupler

D. Italian Type Double Coupler and Swivel Coupler

E. Putlog Coupler/Single Coupler

F.  Board Retaining Coupler

G. Fixed Beam Clamp

H. Swivel Girder Coupler

I.   Sleeve Coupler

J.  Bone Joint

K. Jack Nut

L.  Forged Wing Nut and so on.......


Pictures of Italian Type Double Coupler/Double Clamp

Italian Type Drop Forged Scaffolding Fixed Coupler/Double Clamp

Italian Type Drop Forged Scaffolding Fixed Coupler/Double Clamp






Remarks:

1. Packing: Woven bags+steel pallet or other shipping standard

2. Leading time: Reguarly 25-30 days after receving advanced payment or according to your qty.

3. Payment Term: 30% advanced payment by T/T, 70% balance against copy of BL .


Packing Picture:

Italian Type Drop Forged Scaffolding Fixed Coupler/Double Clamp

Italian Type Drop Forged Scaffolding Fixed Coupler/Double Clamp


For more informaiton, please keep in touch with Bella.

Hope to work with you together in the near future.

Thanks .






Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Hester Prynne on the scaffold?
She was only on it once officially but there are several appearances in the book.
Q:Im planning on getting an industrial (scaffolding) ear piercing...?
via stretcher you advise gauge, ultimate? i've got in no way heard it suggested as a stretcher before, yet that would desire to easily be only an area slang differing style venture. besides, i think of gauges are suited or perhaps lovable in the event that they are smaller. bigger ones are too off-putting and that i might in no way do it myself. i like the belief of an commercial piercing nevertheless. i admire those. i myself % to get one sometime quickly. i've got needed one for a mutually as. i does no longer probably individually get a gauge, yet whilst that's what you sense works via all skill get one. i think of the commercial piercing is adequate on that is very own. i do no longer think of it should be accompanied via a gauge. besides, it sounds to be such as you needed the commercial piercing first, so which you may desire to start with that.
Q:Can I recycle steel scaffolding tubes by encasing them in concrete to make a stronger beam.?
You can, but I can think of two reasons why it might be unwise. Firstly, reinforcing bars are ribbed to provide a key between the concrete and the steel, whereas scaffolding bars are much smoother. This leads me to believe that scaffolding bars, weight for weight, wouldn't be as effective as reinforcement bars and you wouldn't have as much reinforcing action as you think. In extremis, you could end up with an under-reinforced concrete beam which will be brittle - reinforced concrete is usually deliberately slightly over-reinforced so that the behaviour close to failure is ductile, as it gives you time to run away. Secondly, scaffolding bars are hollow and reinforcement bars are solid. In reinforced concrete, the alkalinity of the cement paste helps to protect the reinforcement from corrosion - the reason for specifying a minimum cover - but the inside of your scaffolding bars would not benefit from this and so I'd worry about the risk of shortened life due to rusting from the inner face. At least when reinforcement bars rust they tends to spall the concrete cover off, which you see happening.
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
Yes they hurt but like all piercings if you look after them then it wont hurt for long. If you don't like pain don't get them. I can't tell you what they cost in England as you posted your question in the Australia section.
Q:what is common cause of formwork and scaffolding failure during construction?
I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
Q:Where to use scaffolding in construction
1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.
Q:What are the problems with having scaffolding piercing in the ear? (pic inside)?
i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
Homework is two, while the long rod is 273m; small bar is 51; rectangular fastener 187; butt fastener 55; rotating fastener 17; a 7 foot board 14 square meters. You can use this to derive the amount per square meter. (average length of 5 meters).
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range