Home Office Appliance Single Modified Sine Wave 200 Watt 300 Watt UPS Plug
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 6000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Phase: Single Phase
Protection: Full protection
Weight: 3-5kgs
Output Voltage: 120 VAC or 220/230/240VAC
Type: Standby
Application: computer printer fax TV
Model: cute single Modified Sinewave LED 200w UPS function
Voltage Range: 90~145 VAC or 170/270 VAC
Frequency: 50Hz or 60Hz
P.F.: 0.5
Specificatons
cute single Modified Sinewave 300w UPS function
1.200w / 300w, 12vdc
2.288X125X89 mm
3.Multifunction ups plug
4.ISO9001
Features
Ease-of-use:The plug-and-play functionality of the product allows you to start backing up your equipment the moment you take the unit out of the box. Gain automatic integration with Windows, Mac and Linux with a simple connection to a USB port.
Modern design:The sleek design of the product allows you to display it alongside your high-tech equipment for a sophisticated look. This unit can also be wall or desk mounted for additional space savings.
Premium protection:The high-efficiency design of the product provides premium power protection for up to 10 devices, including those using data lines.
- Q: I now have to design a set of UPS capacity of about 600 cameras, 40 LCD monitors (19 inches), 14 hard disk recorders, a matrix. There are 50 pairs of optical machines. Who knows this, the trouble told me about how much need to be equipped with the UPS.
- The current backup UPS, it should be 500VA / 200W reserve 10 minutes or so, according to 100W, then use a 30 minutes or so. Can be purchased as follows: 1) When selecting a UPS, the user should take into account the individual requirements such as the size of the load, the characteristics of the load device, the importance of the load device, and the degree of impact of the adverse power on the load. 2) first of all need to understand the need for back-up, online, online interactive products such as performance considerations. 3) the most important to pay attention to equipment power, distinguish the actual power and rated power, there is the need for power to delay time to distinguish. 4) in the purchase should pay attention to equipment is not an inductive load, to test the equipment is equipped with centralized or decentralized And other technologies to the fifth: the final consideration is also must be considered is to buy UPS to consider their own brand and after-sales service, which is the most important! UPS is the abbreviation of English Uninterruptiable Power Supply, translated as uninterruptible power supply. From the 20th century, 60 years of rotary generators to the current development of a certain degree of intelligent all-electronic circuit, it is with the electronic technology, especially power devices and automatic control technology and the rapid development of mature. Its basic functions are: Power interruption power supply, can not intermittently power supply; Always provide high-quality AC power to the load, to stabilize. Steady frequency. Suppress the surge. Spike. Electric noise. Compensation voltage subsidence. Long-term low pressure and other factors interfere with.
- Q: 30K of the UPS, need to delay half an hour, about how many batteries (how many security) is best to write how to calculate, in addition, I need to know what is the meaning of 32 output! There are two parallel hot backup means two UPS work together? Or a work ~, another machine to do it? I am not doing this line, but now there is a need to know this project, thank you, high score reward! Put away Added: UPS requires 32 output, what does it mean! Note: UPS is 30K
- 32 output means that the UPS output circuit to 32. Is that you have to be a switchboard, which should be installed 32-way air switch, respectively, control 32-way equipment.
- Q: 300W ups supply 10W small folder fan, can be used for how long By the way, how long and how to buy when to see what is urgent, thank you Or there is no way to do the way to provide a 10W small folder fan to work properly, is to 220V, 55 AC
- UPS parameters, in addition to the power there is a capacity. Power 300W that the load of the maximum power can not exceed 300W (with "W" as the unit is active power). Because the UPS is inside the battery + inverter + voltage regulator / protection circuit structure, so the UPS capacity refers to the built-in battery capacity. DC battery capacity is actually the rated discharge current x time, the unit is AH, A is the current, H is the discharge time (hours). General UPS nameplate has introduced the battery pack, such as "12V / 7AH", the "7" is a variable, there are 12V / 24AH, 12V / 100AH ??and so on. Household UPS battery packs are generally 12V battery in parallel, so the voltage is 12V.
- Q: How to use and maintain ups power?
- UPS power supply is continuous power supply, so his battery maintenance is very important, the frequency of battery charge and discharge can not be too high, so the requirements of the engine room electricity environment must be better, and if there is little power failure in the engine room, 4 months of artificial put a power. So the battery with a 5-6 years is not a problem.
- Q: Power supply and ups power which is good?
- 1, power supply: it is designed for voltage instability, mainly as a back-end equipment to protect the use of equipment protection function is more perfect. General large UPS must also be equipped with a regulated bypass system. The scope of the power supply is very broad, almost need to use the electricity can be used (of course, the premise is the voltage instability). General home with a computer, with a TV, etc., choose high-precision automatic power supply can be, and is the market called SVC AC power supply, the price is real; if it is industrial, then of course, is the high-power AC voltage regulator Power, simple and practical. For the UPS power supply and power supply above are made a good introduction and description, hope that these can understand you for the regulator and UPS can have a very good help, so you in the future life can be very easy to distinguish them , And they can be used better.
- Q: What construction tools are required for UPS power supply installation
- You have to prepare, a screwdriver word, 5-color tape, omnipotent table, pliers pliers, crimping pliers, wrench openings are not open, hot fan saws, you can install. brothers!
- Q: UPS power test to pay attention to what the problem
- A steady-state test The so-called steady-state test is the device into the "normal system" state of the test, the general measurable waveform, frequency and voltage. Waveform ????Usually in the no-load and full load state, the observation waveform is normal, with the distortion measuring instrument, measuring the output voltage waveform distortion. Under normal operating conditions, then the resistance load, with the distortion measuring instrument to measure the output voltage of the total harmonic relative content, should meet the requirements of the product requirements, generally less than 5%. frequency
- Q: The server is IBM X3610 power is 600W should choose the kind of UPS power supply is better.As long as the sudden power failure to ensure normal shutdown on the line.
- With the mountain 1K on-line enough! If you do not require a long backup time, it is recommended that you use the standard machine is enough to recommend the use of Hills Castle Series
- Q: 3000W load with a large number of UPS uninterruptible power supply is appropriate, the backup time to 12 hours
- General UPS load factor of 0.6-0.7 or so, the need to configure the 5KVA UPS was appropriate. If the UPS is connected in series with 16 batteries, the rated voltage of the battery pack is 192V, the inverter battery discharge current is about 3000/192 / 0.85 = 18A, 0.85 is the inverter efficiency, 18 * 12 / 0.9 = 240Ah, 0.9 for the battery discharge efficiency. The actual configuration 120Ah * 16, 2 groups in parallel is enough.
- Q: The server power supply rated power is 400W maximum power 500W actual computer hardware power 270W over time plus 1 2 hard drive so count 300W in addition to a fiber optic transceiver less than 320W monitor with no power outage directly after the server in the company we Self-running site to prevent accidental power outage which can be maintained for 8 hours the server is running is best for 12 hours of the UPS brand does not need to be too good often a power outage occasionally can not be used enough points to add -
- 500 + 300 +320 = 1120W can use 2KVAS UPS power supply, external 12 12V100AH battery (can be delayed more than 8 hours), external 18 12V100AH battery (can delay 12 hours) need to q me
1. Manufacturer Overview
Location | Guangdong,China (Mainland) |
Year Established | 2004 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | Oceania 1.00% Mid East 10.00% Eastern Asia 5.00% Western Europe 10.00% Northern Europe 1.00% Southern Europe 1.00% South Asia 5.00% North America 1.00% South America 1.00% Eastern Europe 20.00% Southeast Asia 30.00% Africa 15.00% |
Company Certifications | copyright Certificate; RoHS certificate; LVD certificate; EMC certificate |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shekou Port,Yantian Port,Huangang Port |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese, Russian, Italian |
b) Factory Information | |
Factory Size: | 5,000-10,000 square meters |
No. of Production Lines | 6 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Home Office Appliance Single Modified Sine Wave 200 Watt 300 Watt UPS Plug
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 6000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords