HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 013
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q:Real estate business, when to carry forward the cost?
- How to distribute profits. The real estate costs carry forward, because it involves real estate sales contracts, subscription agreements, sales lists, construction contracts
- Q:What is the real estate level market secondary market three market
- The real estate first-level market, also known as the land first-level market, is the land use right to sell the market
- Q:What are the aspects of the risk of real estate investment and development?
- long construction period, the impact of factors such as diversity, making real estate development and investment activities are facing many risks
- Q:What does real estate mean?
- Real estate refers to the land, buildings and fixed in the land, the building can not be separated from the part and its accompanying benefits.
- Q:How can we do real estate?
- So to become a top sales staff, we must first learn how to maintain a positive attitude
- Q:What are the real estate management professions?
- the professional training of moral, intellectual, physical and aesthetic development
- Q:What are the categories of real estate?
- 1, residential land, public facilities land (including commercial land), industrial land, storage land, foreign transport land, road plaza land, municipal utility land, green land, special land.
- Q:Real estate in the "five card" which five?
- Construction permit; "commercial housing pre - sale permit".
- Q:China's real estate market began to develop rapidly is what year
- 1991 to 1995 irrational speculation and adjustment stage, Deng Xiaoping Southern speculation after the southern real estate speculation prevailed, the final hard landing, real estate into a downturn
- Q:Kentucky is selling real estate how to understand?
- KFC's long-term business plan, the basic business will be the sale of KFC's various branches to the various partners
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 013
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products