HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 002
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: China's real estate market began to develop rapidly is what year
- China's real estate boom and rapid development began in 1998, the housing system monetization reform.
- Q: What is the gross margin of the real estate industry?
- Real estate development profits generally 20% -40%, how much less, mainly to see how to control costs
- Q: What is the meaning of the term in the real estate?
- Washing dishes generally refers to the 2 hand room. A district in a break time will have owners to take their own house out to sell
- Q: What does real estate mean?
- Real estate can have three forms of existence: the land, buildings, real estate one. In the real estate auction, the auction of the subject can also have three forms of existence
- Q: How can we do real estate?
- Personnel engaged in real estate sales should be committed to the development of individuals and undertakings
- Q: How is China's housing market in other aspects of the trend ?
- the further maturity of the national macro - control and the increase of the rationality of the purchasers
- Q: How is China's housing market trend ?
- ??Under the supervision of the pressure of competition and the supervision of the government
- Q: What is the relationship between interest rates and the real estate market?
- the level of interest rates directly affect the cost of real estate development and profits
- Q: How to classify real estate?
- The main categories are as follows: 1 by use (function) division. According to this classification criteria, can be divided into residential real estate market and non - residential real estate market two categories.
- Q: What is the trend of real estate now?
- China's housing market has entered the adjustment period, but will not collapse. The reason is as follows
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 002
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches