FUXIANG Tower Cranes TC3508 (Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:type of dc motors used by electric train/subway,crane & fan.give a brief explanation to your answer?
Types Of Dc Motors
Q:How to build a basic electric magnetic crane.?
To push an object away, you need equipment that is low to the ground when it applies the force. Bulldozers are designed to push objects. Electromagentic cranes are designed to deal with vertical forces, so they are used to lift and drop metal objects. They use electricity to flow through coils wrapped around a metal core to generate a strong magnetic field. Trying to use them to push things could cause a crane to tip over since they are not designed to deal with horizontal forces. Even if you could get the electromagnet wired to repel metal objects, when you bring the electromagnet near the object, it would repel away in an unwieldy manner because of friction and interference with the ground. And trying to direct a large electromagnet at the end of a long chain would be difficult.
Q:What should be included in the disassembly plan of the tower crane?
- 3 - tower crane demolition special program should include the following1. General situation of engineering;2, the tower crane position of the plane and elevation;3. Disassembly order;4, unit weight and hanging point position;5, remove the auxiliary equipment types, performance and arrangement position;6, the power set;7, the construction personnel configuration;8. Rigging and special tools;9, major sources of risk and safety technical measures;10, emergency plans, etc..Note: (1) the special construction plan for the installation and disassembly of tower cranes shall be examined and approved by the units, technology, safety, equipment and other departments, and shall be implemented after approval by the supervisor.(2) the contents and requirements of the special construction scheme for tower crane installation;Compiled from the "building construction tower crane installation, use and disassembly safety technical regulations" JGJ196-2010, please refer to the implementation. Attached: 1, Zhifu Wanda Plaza Tower Crane installation program 2, Muping District Cultural Center project PT7528 tower crane demolition program
Q:Is there a real life Frasier Crane?
The okorder.com/
Q:Who was the guy called the Headless Horseman in the story of Ichabod Crane?
A Lib
Q:How often should the crane be inspected regularly?
Crane safety supervision regulations twenty-fourth in lifting machinery safety regular supervision and inspection cycle for two years, elevator and manned elevator safety regular supervision, inspection cycle for a year.Eighteenth lifting machines should check the lifting machines regularly, including annual inspection, monthly inspection and daily inspection:I. at least one full inspection shall be carried out annually on the lifting machinery used.The load test can be carried out by lifting the heavy load which is equivalent to the lifting weight, and checking the safety performance of the mechanism such as lifting, running, turning and amplitude according to the rated speed.Lifting machines which have not been used for more than one year should be examined comprehensively before use.Crane in case of four or more earthquakes or major equipment accidents, outdoor work crane after more than nine winds, should be used before a comprehensive inspection.
Q:Is it true that crane flies are THE most venomous insects in the world?
Most Venomous Insect
Q:Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:What happens to the sky crane after it drops off the Curiosity rover?
It was programmed to fly off to the side well away from Curiosity's landing spot, and then crash. NASA doesn't like to say much about it, because it dumped a mess of nuclear fuel! One of the 2004 rovers actually travelled to where its heat shield fell, and was able to photograph it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range