• FORKLIFT CLG2015A,Directional control switch mounted on the lift lever. System 1
FORKLIFT CLG2015A,Directional control switch mounted on the lift lever.

FORKLIFT CLG2015A,Directional control switch mounted on the lift lever.

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 SPEC

ModelCLG2015A
Capacity @ 500 mm LC1,500 kg
Power TypeElectric
ControllerSME

FEATURES

Operator Safety and Comfort

  • Operator present induction system(OPS ) stops machine if operator is not seated safely.


  • Ergonomically designed seating, steering wheel and placement of control instruments.


  • Low noise hydraulic system. 


  • Wide angle rearview mirror for good visibility.


  • Seat side hydraulic control levers.


  • Directional control switch mounted on the lift lever.

Reliability

  • Sealed waterproof connectors and all copper wiring.


  • Parts and service you can count on.


  • World class suppliers of key components.

Easy to Maintain

  • LCD monitor gives valuable status information, fault codes, and maintenance assistance.


  • Easy battery access and key components conveniently placed.


  • Steering wheel and pedals moveable to access maintenance points.


  • Low maintenance with the help of sealed wet disc brakes.

Q: I read that you have to kill 10 robots using the crane. I'm not having much luck. Can I pick up a box and drop it on them? The little ones are way too quick. Can I just kill the laser bots and come back and keep killing them, will that count as 10? Any help would be grateful I am only a few points away from having all of them!
On planet Endako take the crane, and kill ten robots by picking up boxes and dropping it on them.
Q: I plan on wearing a suit but I am wondering if I can go a little casual and skip the tie.
No dude, it is better to over-dress for an interview. Going in tie-less will project a cavalier attitude. Image is an important part of sales.
Q: What are the major of construction machinery application and maintenance?
This graduate jobs are mainly three aspects: 1, engineering machinery manufacturing enterprises, such as Sany, XCMG, ZOOMLION, Xiamen, manufacturing and assembly production line.
Q: What machinery/equipment shall i use for my catering business? I am starting up a business and i cannot find proper help. help me!
hello,everybody,welcome okorder Because of the space and time limitation, there are many available products are not in the website, please let us know your interest directly. We will be happy to give you a quotation upon receipt of your requirements!
Q: Japan famous construction machinery and electric company
Others, such as MITSUBISHI heavy industries, Fujitsu, Mitsui, KYB, Teijin, are very good machinery company
Q: i need to know what are the machinery and equipment needed to start a pectin extraction job.any websites or additional information would be helpful.thanks
I don't know the exact names for the equipment but you'll need a pulverizer,(grinder) and a dryer. The best type of pectin comes from limes. See if any of this helps?
Q: car, machinery diagnostic type person.
OK...so what's your question?
Q: I was reading a thread about chemical engineering and noticed someone said that chemical engineers design machinery used to mass produce products created by chemist. Is this true?
Yeah they can. Machinery's predominantly designed my mechanical engineers, but it's not uncommon for a chemical engineer to do it too, or do aspects of the overall design.
Q: What are the five major cost components of the project cost?
The cost of the project is divided into two parts: direct and indirect. The direct cost consists of labor, material, mechanical and other direct costs. Their composition is as follows: labor cost refers to the budget quota, engaged in construction personnel wages, bonuses, wages, surcharges, and wages of the Jin, labor protection fees.
Q: Just wanted to know what do you do daily? And how long are you gone during deployments?
I'm guessing doing upkeep on machinery, fixing broken parts ect ect. As for deployments, usually six months every two/three years depending on what boat your assigned to. However, some do go out infrequently and for shorter periods of time(three months on three months off)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords