Exacavator NA-CLG904D, best quality and price

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

SPEC

Operating Weight8,818 lbs
Bucket Capacity0.08-0.39 yd³
EngineYanmar 4TNV88-BSBKC
Gross Power36.4 hp (27.2 kW) @ 2,200 rpm
Net Power33.8 hp (25.2 kW) @ 2,200 rpm
Peak Torque104.5 lb·ft @1320 rmp
Travel SpeedHigh:2.7mph, Low: 1.68 mph
Drawbar Pull7,149 lbf
Swing Speed11.1 rpm
Arm Breakout Force, normal, ISO3,957 lbf
Bucket Breakout Force, normal, ISO6,362 lbf
Maximum Dig Depth10'2''
Reach at Ground Level17'2''
Depth of 8’ Level Bottom9'11''
Maximum Dig Height16'5''
Dump Height11'10''
Maximum Dig Depth of Vertical Wall6'8''
Overall Lenth16'11''
Overall Width5'11''
Overall Height8'2''

LiuGong and its dealers throughout the world increasingly take responsibility for the human condition as well. Disaster relief is just one example. All over the world, after devastating natural disasters, LiuGong partners with local dealers and governments to donate both equipment and manpower to help aid in clean-up and recovery.

LiuGong has always proclaimed that people come first. Now, our growing commitment to social responsibility on a global scale is just another way we uphold our mission.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can I still operate heavy machinery?
If doc said it was okay then it should be. Women run while preggo. I'm sure at a certain number of weeks the doc might tell you to stop.
Q:Anyone Else Hear The Massive Whirring of Office Machinery?
So much noise, it is hard to hear yourself think.
Q:With 3Dprinting, why do we need variations of CNC machinery?
For okorder.com/
Q:How can mice be discouraged from getting into machinery and nesting?
If they are mice and not gofers, I put d-Con were the pets cannot get to it. The mice will find it.
Q:Should I operate heavy machinery?
Yes drunk, stoned and naked
Q:Wants to know the average fuel consumption of constructional machinery?
Just like cars depends on the size of the machine. Is the Dozer a D11 or is it a D3? Is the truck a Toyota Tacoma or is it Peterbilt 357? What are you hauling? What size Engine? What climates are you operating at? Is the job site full of hills and what material are you working with?
Q:What kind of car engineering does that belong to? Is it traffic or machinery?
Vehicle engineering is a field of engineering technology that studies the theory, design and manufacture of mobile vehicles such as automobiles, tractors, rolling stock, military vehicles and other engineering vehicles. The master of engineering degree authorized units engaged in the training of vehicle research, design and development, manufacturing, quality inspection and control, use and maintenance, detection device and instrument development of advanced engineering and technical personnel.
Q:why Singapore import machinery and equipment, mineral fuels, chemicals?
I lived in Singapore for a month, so my answer for you is a reflection of that experience and what I learned there (briefly) from talking with some co-workers. Singapore is a wonderful little country that is in between several economic powers - Malaysia, Indonesia (the 5th largest country in the world), China, Japan and the Koreas; (but you know all that already) - It is a very favorably positioned and accessible seaport. These trading policies were undoubtedly part of the policies of P.M. Lee Kuan Yew. It is a very active, willing and cooperative trade partner and in return gets great deals on imported goods from sea trade in return for favorable trading terms. I personally would love to live there, but the heat and humidity are too much for me to make that decision. HTH
Q:Bally Manufacturing sent Intel Corporation an invoice for machinery with a $20,000 list price. Bally dated the?
Yeah, so what's the question really? (You don't really state what you want answered). But anyways, Intel missed the 10 day discount period on the payment terms, so they can't take that. ------------------------ It's also hard to tell if the trade discount is already included in the invoice amount (which it should be).
Q:The difference between energy-saving and other frequency station
The business model is now using online consignment line, under the city manager with the equipment model, and credit quality and even the ability to repay the buyer to provide armored financial services.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range