Easy Clean Pleated Window And Door System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction of Easy Clean Pleated Window And Door System


The latest in European styling, the ScreenSolutions Plisse is the newest and most innovative retractable screen designavailable. So simple to install that almost anyone can do it in as little ashalf an hour.
This elegant, stylish, pleated screen is unlikeany other screen on the market. This unique product has low-profile bottomglide is making it ideal for any locations. You can leave the screen in anyposition without any spring action and will stay in that position till you moveit.


Avaiable Size for Easy Clean Pleated Window And Door System

Single door width: 800-1500mm Height: 1900-2700mm
Double Door width: 1600-3000mm Height: 1900-2700mm
Other special size could be also available


Advantage for Easy Clean Pleated Window And Door System

▪The mesh cassette could be removable then easy to clean and when damage the mesh, each to change the new mesh.

▪(6063-T5) aluminum alloy outline border. Hardness ≥12.

Environmental no-lead process surface, thickness ≥1.0.

Anti-friction, spring folding net, PET and terylene are optional.

▪Anti-friction and anti-striction draw cord, with special process.

▪Advanced adhesion machine, first-class adhesion technique.

▪Super anti-friction rivet, can stand up to 100,000 times friction.

▪Super amphiphobic process makes a complementary (e.g bulge and concave) structure.


▪Super loeophobic performance after super amphiphobic process

▪Super dewatering performance after super amphiphobic process



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Less than three months of pregnancy are all wood furniture processing plants, as well as metal doors and windows processing plant will affect the tire
There are a lot of harmful gases in the processing plant, and it is better to stay away from it
Q:This year the new qualification standards to cancel the metal doors and windows, is not to do safety production license?
Metal doors and windows professional contracting enterprise qualification cancellation, the relevant safety production license is also canceled, has been made safety production license enterprises do not need to write off, after the expiry of the void.
Q:Metal doors and windows to install the project quality requirements which
Doors and windows should be checked before the box diagonal and flatness deviation, the box after the use of steel plate ruler, feel the checker box lap width, the surrounding gap, until the meet the requirements. Proper installation of metal parts, found that damage should be replaced.
Q:Metal doors and windows qualification
Contracted Project Scope: First-class enterprises: can undertake all kinds of aluminum, steel and other metal doors and windows construction of the project. Second-level enterprises: can bear the amount of individual contract does not exceed 5 times the registered capital of the following aluminum alloy, steel and other metal doors and windows construction of the project: 1,30 layers and the following buildings of the metal doors and windows works; 2, an area of 8000 square meters and below the metal doors and windows works. Three enterprises: the amount of individual contract can not bear more than 5 times the registered capital of the following aluminum alloy, steel and other metal doors and windows construction of the project: 1,10 layers and below the building of the metal doors and windows works; 2, an area of 4000 square meters and below the metal doors and windows works.
Q:Metallic window paint list works in square meters, according to the design diagram of what area to calculate
(A + 4) × (B + 4) = S at the end + 2L outside the +16 where: S --- leveling the amount of work; A --- the length of the building direction of the outer wall of the external length ; B --- the width of the building outside the direction of the length of the outer edge of the outer wall; S at the end --- the building floor of the building area; L --- outside the building exterior edge.
Q:Metal doors and windows generally taxpayers can declare a simple levy?
"Notice of the Ministry of Finance and the State Administration of Taxation on the Application of Value-added Tax on Value-added Tax and the Measures for the Collection of Value-added Tax Policies on Certain Goods" (Cai Shui [2009] No. 9):   (C) the general taxpayer sales of the following goods, may choose to follow the simple method to calculate the payment of value-added tax:      1. Electricity produced by small hydropower units at the county level and below the county level. Small hydropower units, refers to the construction of various types of investment in the installation capacity of 50,000 kilowatts or less (including 50,000 kilowatts) of small hydropower units.      2. Building and production of building materials used by the sand, soil, stone.      3. Bricks, tiles, lime (without clay solid brick, tile) made of sand, soil, stone or other minerals that are mined.      4. Biological products made from microbes, microbial metabolites, animal toxins, blood or tissues of human or animals.      5. tap water.      6. Commercial concrete (limited to cement concrete produced from cement as raw material).
Q:Plastic windows are metal doors and windows or plastic doors and windows
Plastic window features: It not only has the characteristics of plastic products, and physical, chemical properties, anti-aging ability greatly improved. With insulation, heat insulation characteristics, so that the room more comfortable, quiet, more modern style. In addition, it has the advantages of acid resistance, alkali resistance, corrosion resistance, dustproof, self-extinguishing, high strength, inconvenience, hue and so on. It is not necessary to paint anti-corrosive paint, and its air tightness and watertightness are similar Big 2 - 5 times
Q:How to handle the installation of metal doors and windows
First level qualification: 1, the enterprise nearly five years to undertake the following three items in more than two construction, the project quality qualified. (1) metal doors and windows of buildings of 25 floors or more; (2) area of more than 6000 square meters of metal doors and windows works; (3) single contract amount of more than 5 million yuan of metal doors and windows works.
Q:Metal doors and windows do not include steel doors and windows
Should not, metal doors and windows are not included steel doors and windows.
Q:High-rise commercial housing metal doors and windows how to leave the ground? And can not be steel out of the wall paint what are the brush. Most of the balcony of the metal railings are not received
You have to look at the general requirements of the drawings, if there is a requirement you do not do is your responsibility, if the design is not required, is the design of the responsibility.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range